Courses on executive documentation in construction. Organization of construction control to meet the requirements of technical regulations

The course provides a systematic summary of practical recommendations on the maintenance of as-built documentation, "run in" during the implementation of various construction projects, which can significantly reduce production costs.

Who is it for

Managers and specialists of construction companies of developers (technical customers), contracting and general contracting organizations, field supervision, state construction supervision, foremen, site managers and all interested parties. As well as persons responsible for the operation of buildings and structures or regional operators.

Introduction

The program will cover issues based on current legal and regulatory requirements.

You will receive a systematized set of practical recommendations for maintaining as-built documentation, "run in" during the implementation of various construction projects.

This System can be considered as an element of anti-crisis management construction company since allows you to significantly reduce production costs by reducing product defects, inconsistencies in document flow and theft at the construction site.

Program

  1. System of technical regulations in the field of construction. The procedure for applying and fulfilling regulatory requirements on a mandatory and voluntary basis during the implementation, acceptance and documentation of construction and installation works, finished structures and engineering networks and systems.
  2. The impact of the quality of as-built documentation on the cost of construction; efficiency, profitability, reliability and durability of the operated capital construction facility. Examples and possible consequences not reliable executive documentation.
  3. Algorithm of actions, detailed consideration of the full range of measures to prepare for maintenance, as well as to organize the actual maintenance of high-quality executive documentation in a regular mode, ensuring a significant minimization of labor, financial and time costs throughout the construction process.
  4. Types, composition, procedure for registration, presentation and storage of executive documentation.
  5. Practical guidelines for developing worklists hidden works and critical structures subject to certification.
  6. Practical recommendations for the development of a program for routine control measurements, tests used building materials, finished structures in building and laboratory conditions, as well as pipelines, engineering systems and equipment.
  7. Rostekhnadzor requirements for the procedure for issuing certificates of inspection of hidden works, critical structures and sections of engineering and technical support networks, performed "before" and "after" 03/06/2016, in accordance with the provisions of RD-11-02-2006 and Rostekhnadzor Order of 10/26/2015 city ​​No. 428.
  8. Practical recommendations for the design of executive geodetic diagrams and drawings.
  9. Rules and peculiarities of the formation of the commission for the acceptance of hidden works, critical structures and sections of engineering and technical support networks, performed "before" and "after" 03/06/2016, and taking into account organizational structure construction production and construction method. The procedure for vesting the members of the commission with the appropriate powers.
  10. Practical recommendations and real examples for the development of various regulatory documents for the execution, presentation and storage of executive documentation.
  11. Preparation of a package of acceptance documents for checking the completed construction / reconstruction of an object and putting it into operation.
  12. Interim acceptance of sections of engineering networks with subsequent documentation.
  13. Mandatory requirements of Rostekhnadzor (RD-11-05-2007) and other rules for drawing up the General Journal of Work. Features of keeping special journals (concrete works, welding works, installation works etc.).

For participants it is provided

Working materials, lunches, coffee breaks.

Completion document

Based on the results of the training, students who have successfully passed the final certification of the training program receive a Certificate of advanced training in the amount of 72 hours (License for the right to conduct educational activities dated May 03, 2017 No. 038386, issued by the Department of Education of the city of Moscow).

Information for nonresident clients

Clients from other cities are assisted in booking a hotel for the period of training.

This event can order in a corporate format(training of employees of one company).

The guarantee of the success of any capital (and sometimes temporary) construction to a large extent depends on how well all the necessary documentation was drawn up. According to the current Russian legislation, construction must be carried out in strict accordance with the technical documentation, which includes design, estimate, and as-built documentation.

Design and estimate documentation (DED)- this is one of the main documents that builders have to deal with throughout the entire construction cycle. Design and estimate documentation reveals the essence of the project - it contains information about the construction object and the adopted engineering and technical solutions, makes it possible to understand how, according to what regulations, the construction project was drawn up, includes design calculations, on the basis of which further decisions were made. A set of design and estimate documentation traditionally consists of text and graphic parts. is a plan for construction costs (in fact - the price of construction), as well as a plan of income that is expected to be obtained as a result of this construction.

Executive documentation(ID) is issued during the construction process. It records the process of production of construction and installation work (who performed them, from what materials, at what time, at what cost), the conditions for the production of these works, the technical condition of the object (for example, available). In fact, the executive documentation in construction reflects, in fact, the implementation of design solutions and construction works and shows the actual state of the object in the process and after its completion. Source documents on compliance and as-built drawings are the types into which the as-built technical documentation is divided. According to the law, executive documentation must be kept by the customer or developer, except for those periods when state supervisory authorities conduct inspections.

One of the important components of the package of as-built documentation is permits. Obtaining permits for construction means that the process is carried out legitimately and in accordance with the requirements of the current legislation.

Specialists in the process of work go through to develop different types documentation in construction. it POS (project of construction organization), PPR (project of work production), PPRk (project of work by cranes), TK ( technological maps), POKR (project of organization of work on capital repairs), design and estimate documentation (design and estimate documentation), ID (as-built documentation) and much more. Necessary condition for developers of documentation in construction, it is currently knowledge of programs used to automate the process of drawing up as-built documentation in construction.

Interregional Academy of Continuing Professional Education in Moscow offers courses professional retraining, as well as advanced training in the specialty "Documentation in construction". Specialists with specialized secondary or higher education in the field of construction can become students of the courses. For admission, you must provide a diploma of graduation from a university or college.

Professional retraining in the specialty "Documentation in construction"

Students will explore a number of questions, including the following:

  • Modern Russian legislation in the field of construction, current changes.
  • Economics of construction production and assessment of its effectiveness.
  • Innovation and Newest technologies in design.
  • Procedure for implementation state supervision and control in construction.
  • Safety requirements in construction.

Course duration varies from 252 to 520 hours... At the end of the training, final certification is carried out and the issuance, in accordance with the results of certification, state diploma on completion of a professional retraining course.

Advanced training program in the specialty "Documentation in construction"

The duration of the courses is from 72 to 140 academic hours... The training program includes a concise presentation of the main professional issues and pressing issues of the industry. Passing this course allows students in a fairly short time to significantly increase the level of professional competence and get answers to the most pressing questions in the field of development and approval of documentation in construction. The document that students receive at the end of the training is - certificate of the established form on the completion of refresher courses.

Conditions of training at MADPO courses

  • The enrollment application can be submitted online through the form on the website or by phone.
  • Proven distance learning technologies allow you to get additional education without interrupting family and work affairs.
  • Place of residence or age of students cannot be an obstacle to study at MADPO.
  • Each student is engaged in an individually designed schedule and curriculum.
  • Access to the electronic portal where the modern digital library, containing all the materials necessary for successful study at MADPO, as well as services for self-examination.
  • The cost of training is added up depending on the number of specialties chosen by the trainees and academic hours.

Provision and registration land plots for construction

  • Prohibitions and approvals of construction in different places, with different authorities, terms of approval.
  • Clarifications in connection with unauthorized buildings, unbearable unauthorized buildings.
  • Establishment and influence on the construction of various zones with special conditions for the use of territories: sanitary protection, security.
  • Formation of land plots in different ways, before and after the GPZU, with and without PMP.
  • Cases of involving a “non-auction” land plot in an auction.
  • Provision of land plots and technical specifications for technical equipment with auction and non-auction order.
  • The main reasons for refusals to provide land plots.
  • Explanations on the GPZU.

Initial data and conditions for preparation project documentation

  • Title documents for a capital construction object. Urban development plan of the land plot (GPZU), the project of the territory planning in accordance with the requirements of the Urban Planning Regulations from 01.07.2019.
  • Information about land plots withdrawn for temporary or permanent use.
  • Information about the category of land on which the capital construction object will be located.
  • Information on the amount of funds required to reimburse the rights holders of land plots (in case of withdrawal for temporary or permanent use).
  • Information about the object's need for fuel, gas, water, sewerage, electrical energy.
  • Data on the design capacity of the capital construction object.
  • Reporting documentation on results engineering surveys.
  • Technical conditions for connection to engineering networks common use; information and calculation of loads for connection to engineering networks for the needs of construction (electricity, water, steam, communications, etc.), temporary buildings and structures, access roads and roads to the capital construction object.
  • Determination of the cost of design and survey work.
  • The modern domestic system of pricing and estimated rationing of the cost of design and survey work... The main regulations required when calculating the cost of design and survey work.
  • Price levels. Concept, essence, application in practice.
  • Features of drawing up estimate documentation according to specialized reference books base prices... Design pricing and complicating factors.
  • Design assignment.
  • Requirements to terms of reference for engineering surveys and drawing up a work program in accordance with SP 47.13330.2012. "Engineering surveys for construction." Requirements for the results of engineering surveys presented for examination. The procedure for the examination of the results of engineering surveys.
  • Requirements for the terms of reference for design in accordance with the Civil Code of the Russian Federation.
  • Contract for design and survey work.

Project documentation. Building permit

  • Project documentation.
  • Normative-legal and normative-technical support of design during the construction of objects: a review of documents.
  • The composition of the sections of the design documentation and the basic requirements for their content. New requirements Urban Development Code and to the project documentation. Changes in the Civil Code of June 27, 2019 No. 151-FZ.
  • Requirements for the estimated part of the design and estimate documentation. The procedure for verifying the reliability of the declared construction cost. Formation features estimated cost construction.
  • Organization and examination of design documentation. The need for a re-examination in accordance with the amendments dated June 27, 2019 No. 151-FZ.
  • Decree of the Government of the Russian Federation of 05.03.2007 No. 145 "On the procedure for organizing and conducting state examination of project documentation and the results of engineering surveys." Checking the reliability of the estimated cost. Resolution of the Government of the Russian Federation of 18.05.2009 No. 427.
  • Delineation of powers between federal and regional authorities. Features of state and non-state expertise of project documentation. The cost and timing of expert work.
  • Design documentation and results of engineering surveys that do not require an examination and its consideration in state or non-state expert examinations.
  • Building permit.
  • Obtaining a building permit. Features of town planning regulations after 07/01/2019.
  • Organization of interaction between the developer (customer) and authorized bodies when obtaining permits for construction and commissioning of facilities.
  • Obligations of the developer (customer) for the transfer of documentation to information system provision of urban planning activities (ISCGD).

Organization of works in construction

  • Construction regulatory framework.
  • The system of normative legal acts governing construction activities.
  • Legal regulation of construction quality assurance.
  • New requirements of the Urban Planning Regulations from 01.07.2019, for the organization of construction.
  • Requirements for the issuance of certificates of admission to the types of work affecting the safety of capital construction facilities (Order of the Ministry of Regional Development dated 30.12.10, No. 624).
  • New in the requirements for design documentation.
  • The responsibility of the manager for violations of the quality of construction.
  • Organizational and technological preparation of construction in modern conditions. Preparatory period for construction.
  • Organizational and technological modeling and scheduling of production processes.
  • The sequence of the construction of buildings and structures, engineering and transport communications.
  • Composition, content and procedure for the development of a construction organization project (PIC).
  • Composition, content and procedure for the development of a work production project (PM) recommendations for the development and organization of the implementation of work production projects (PM).
  • Composition, content and procedure for the development of a work organization project (ERP).
  • The main provisions for the scheduling of construction and production of work.
  • Construction organization models.
  • Optimization tasks of scheduling.
  • Technological maps.
  • Engineering preparation of the construction site and development of the construction master plan. Construction design master plans in the conditions of urban development.
  • Arrangement and maintenance of construction sites.
  • Requirements to engineering arrangement construction sites.
  • Accommodation on construction site means of vertical transport.
  • Organizational measures to reduce the size of hazardous areas.
  • Examples of arrangement and maintenance of construction sites.
  • Temporary roads at the construction site.
  • Warehouse facilities at the construction site.
  • Production facilities at the construction site.
  • Temporary buildings and their use in construction.
  • Provision of construction with water, heat, electricity.
  • Culture of maintenance of construction sites.
  • Indicators of the quality of arrangement and maintenance of construction sites.
  • Regulatory and methodological base.

Construction control and quality management in construction

  • Organizational and legal procedure for ensuring the quality of manufactured building materials, products, structures, completed construction projects. Requirements of the town planning code for construction control from 01.07.2019.
  • Resolution of the Government of the Russian Federation of June 21, 2010 No. 468 "On the procedure for conducting construction control».
  • "Technical regulations on the safety of buildings and structures" - the federal law No. 384-FZ of 30.12.2009. Implementation of the list of National Standards and Codes of Rules into practice.
  • Regulatory framework maintenance of executive, technical and technological documentation in construction.
  • Rostekhnadzor guidelines.
  • Requirements of normative and technical documents.
  • National standards and codes of practice (Order of Rostekhregulirovanie dated 01.06.2010 No. 2079).
  • Executive documentation and its purpose in providing an organizational and technological scheme in construction. New requirements for the maintenance of executive documentation.
  • The composition and procedure for maintaining executive documentation during construction, reconstruction, overhaul capital construction objects.
  • New requirements for the maintenance of as-built documentation in accordance with the Decree of the Government of the Russian Federation of June 21, 2010 No. 468 "On the procedure for conducting construction control".
  • Mandatory requirements of the current SNiPs and joint ventures for the execution of as-built documentation in the implementation of construction control.
  • Experience in automating the maintenance of executive technical and technological documentation in construction.
  • Production control.
  • Production control of building materials and construction and installation works at all stages of the technological process. Incoming quality control of building materials.
  • Features of relationships with suppliers of building materials, products and structures in modern conditions.
  • Methods of quality control of construction and installation works, control means.
  • Acceptance certain types works with the registration of the required documents.
  • Mechanical and physical methods of quality control of materials and technological process in construction.
  • Technology of earthen pile and concrete works, quality assurance of construction. Typical technological violations.
  • Features of operational quality control of monolithic structures manufactured (erected) in the conditions of a construction site.
  • Updating GOSTs for concrete work (GOST-7473-2010 from 01.01.2012).
  • Inspection of welded joints (SNiP 03.01-87).
  • Devices and methods of non-destructive testing.
  • Commissioning of the facility, the requirements of the Town Planning Regulations from 01.07.2019.
  • Contract work. Types of contracts in construction and their features. The procedure for conducting contractual work. Errors in the conduct of contractual work. Termination of contracts due to violation of regulatory standards, technical conditions and other Judicial and arbitration practice.
  • Errors in maintaining executive documentation at the facility, their impact on the results of litigation.

Practical techniques in managing investment construction projects

  • Improving order and performance discipline. Putting things in order in the documents, structuring the composition and storage places of electronic and paper documentation, facilitating the search and navigation of project documentation, ensuring information security. Improving the performance discipline of employees single base assignments are the motivational aspect of performing discipline.
  • Formalization management accounting and budgeting: classifiers (cost centers, stages, items, projects) budgeting horizons, budgeting regulations, application for use Money base of payments, updating of budgets.
  • Scheduling, tracking the progress of the project, control of terms: development of the Project Implementation Schedule (PIU), control over the execution of hydraulic fracturing, regulations for adjusting and updating the hydraulic fracturing.
  • The main methods of effective preparation and conduct of tenders: breakdown of the project into individual works(tenders) preparation of a tender package determination of the circle of participants in the tender determination of the most appropriate form of tender summing up the results and awarding the victory.
  • Practical development of investment construction project using information technologies: creation of the Project Manager Panel, photo progress of the construction process, creation of an interactive tender table (navigation system for tenders), creation unified register payments, building management reports on its basis.

((info-for-stroy))

Estimator courses - training budget case in construction "from scratch", advanced training of novice cost estimate engineers in Moscow. The study software package "Smeta.RU".

Purpose of the course:

  • teach to competently work with the current estimate and regulatory framework in construction;
  • to give a complex of professional knowledge in the field of estimated pricing;

The result of training on estimated courses:

Knowledge:

Skill:

  • draw up all types of estimates and reporting and executive documentation in full compliance with applicable standards;
  • determine prices for resources and scope of work;

Scope of the program:

  • 72 academic hours (64 academic hours full-time / 8 academic hours in absentia).

Job prospects:

  • Graduates of training courses in the estimate business of the training center are issued a qualification ((tdoc)).

We do not claim that these are the best courses for estimators in Moscow, the professional successes of our graduates and the feedback from listeners speak for us!



Sign up for Estimator Courses in Moscow right now!

What is included in the cost estimate course

Estimating Engineer Courses in Moscow include the study of pricing in construction, where everything starts with the usual definitions and ends with direct costs. capital investments etc. The course is very interesting, but it must be borne in mind that training takes place in a fairly intensive mode, which, on the one hand, contributes to retaining attention, but also requires concentration. All course materials are provided to students in in electronic format... Courses for estimators in Moscow determine the cost of training services from scratch in different ways, but these prices do not differ much, therefore, when choosing a course in construction budgeting in Moscow, focus primarily not on the cost, but on the details of the training program and on the qualifications of the teacher, such information can be read on the website of the training center or ask the manager by phone. Courses are an estimated business in construction for beginners, these are, first of all, qualified teaching staff, an up-to-date training program and new software, it is these criteria that determine the guarantee of high-quality training for the estimator.

Curriculum of the course

Topic number 1 “Purposes and means of the budget case. Investment process in construction "

  • the goals and means of the budget case; participants in the investment process; negotiable price;
  • about the stages and stages of design;
  • design assignment and initial data;
  • methodological documents in construction;
  • methods for determining the estimated cost of construction.

Topic number 2 "Estimated regulatory framework in construction"

  • estimated rate;
  • unit rate (FER, TEP);
  • estimated cost norms for the construction of temporary buildings and structures;
  • estimated norms and additional costs during production:
  • construction and installation works and production;
  • repair and construction work in the winter.

Topic number 3 "Economic foundations of the budget business. Determination of articles of estimated cost "

  • construction cost;
  • price levels;
  • estimated construction cost;
  • the cost of construction and installation work;
  • direct costs;
  • basic salary;
  • operation of machines and mechanisms;
  • material resources.

Topic № 4 “Overhead costs, estimated profit, limited costs. Estimating methods. Composition and content of estimate documentation "

  • a group of overhead items;
  • recorded costs as part of overhead costs;
  • accounted costs as part of estimated profit;
  • bases for calculating overhead costs and estimated profit (FER);
  • bases for calculating overhead costs and estimated profit (TSN);
  • transfer to current level HP and SP (FER);
  • transfer to the current level of HP and SP (TSN);
  • rounding procedure for HP and joint venture;
  • preparation of local estimates;
  • requirements for local estimates;
  • numbering of local estimates;
  • rounding and numbering in local estimates(FER);
  • rounding and numbering in local estimates (TSN);
  • features of drawing up estimates for installation work;
  • feature of repair and construction work;
  • type of construction production, estimate documentation;
  • features of drawing up estimates for commissioning;
  • requirements for object estimates;
  • consolidated estimate of the cost of construction;
  • consolidated estimate of capital repairs;
  • transport for the removal of soil and garbage;
  • limited costs;
  • returnable amounts;
  • hidden works;
  • resource method;
  • determination of the estimated cost of equipment;
  • work on estimates of analogs;
  • design work (application of reference price reference books).

Topic number 5 "Estimated regulatory framework in construction"

  • estimate and normative base of 2001;
  • 2001 base structure. GESN, FER and TEP;
  • rules for drawing up estimate documentation using the 2001 base;
  • Moscow estimate and normative base;
  • structure of TSN-2001;
  • rules for drawing up estimate documentation using;
  • base TSN-2001 for Moscow.

Topic number 6 "Determination of the scope of work"

The form of the lesson is a practical lesson.

  • Rules for calculating the amount of work;
  • Practical work "Counting the amount of work for the repair of a room."

Topic number 7 "Practical skills of drawing up local estimates"

  • manual version for FER and TSN bases;
  • computer version on the basis of FER and TSN (Excel);
  • practical work "Drawing up estimates for construction work";
  • practical work "Drawing up estimates for repair work";
  • calculation of costs for dismantling structures and equipment;
  • calculation of direct costs, overhead costs;
  • estimated profit and winter rise in price for the TSN-2001 base.

Independent work.

The form of the lesson - independent work
The amount of study time - 8 academic hours

Homework:

  • Determine the estimated cost and estimated cost general construction works.
  • Drawing up estimate documentation for the assignment in Excel.
  • Independent familiarization with the types of executive documentation (KS-2, KS-3, KS-6, M-29).

Software complex "Smeta.RU"

Topic number 8. “Program settings. Estimated normative reference system. Search system"

  • basic concepts of the regulatory framework;
  • program launch, main window, toolbars, Manager information tool;
  • menu: estimates, work, information, reference books, settings, window, help;
  • work with program directories;
  • information tool Manager;
  • formation of bypass paths;
  • filling out the directory of organizations;
  • presentation of information in the estimate and normative help system, browsing collections, browsing resources, ESN, general and those. parts, scope of work, conversion indices, types of resources;
  • how the search engine works;
  • checking the project estimate;
  • export and import.

Topic number 9. "Creation of estimate documentation on the example of the normative base of the SNB - 2001"

  • reference book of objects, creation, renaming, deletion of an object;
  • object parameters: settings, search paths, description;
  • creation of the estimate structure, description of the structure element;
  • work with budget lines;
  • formation of a set of works; selection of unaccounted for materials; input of the scope of work;
  • assignment of amendments;
  • formation of limited costs;
  • line numbering;
  • printing of project estimates;
  • ways of presenting information in the project estimate.

Topic number 10. "Working with the TSN-2001 base"

  • presentation of TSN-2001 in the program;
  • setting up the program to work with the TSN-2001 base;
  • features of the formation of estimates using TSN-2001;
  • creation of KS-2 (percentages), assignment of the actual scope of work; adjustment of the set of works;
  • approval of interest, printing of an acceptance certificate for work performed;
  • formation of the KS-3 certificate;
  • formation of the KS-6 journal;
  • formation of the M-29 form, printing of the M-29 form.

Topic number 11. "Features of the formation of estimates using the 2001 standards."

Topic number 12. "Formation of executive documentation".

Topic № 13. "Independent problem solving using the software complex" Smeta.RU "

  • creation of estimates using the resource method using the HPES regulatory framework;
  • formation of estimates using the FER regulatory framework.
  • formation of estimates using the TEP regulatory framework of the Moscow region;
  • formation of resource calculation;
  • formation of the KS-3 certificate;
  • formation of the KS-6 journal;
  • formation of an executive estimate, printing of an executive estimate;
  • creation of M-29, formation of a material write-off list, printing of a material write-off list;
  • Formation of the M-29 form. Printing of the M-29 form.

Course of Study

"Construction control and quality management in construction"

The course is designed for construction directors and their deputies, chief engineers, investors, developers, customers of the construction and investment process and all interested parties.

By attending classes for this course, you:

  • familiarize yourself with the legislation of the Russian Federation in the field of construction control and quality management in construction,
  • learn about as-built documentation and its purpose in providing the organizational and technological scheme in construction,
  • learn to avoid mistakes in design documentation leading to financial losses during the construction phase,
  • discuss with the teacher the issues of the practical organization of production control and contractual work,
  • get examples of litigation practice,
  • learn about typical mistakes when maintaining as-built documentation at the facility and the responsibility of managers and participants for quality and safety

Day 1 .

1. Organizational and legal the procedure for ensuring the quality of manufactured building materials, products, structures, completed construction projects.

  • « Technical Regulations on the Safety of Buildings and Structures "- Federal LawNo. 384-FZ dated 30.12.2009. Implementation of the list of National Standards and Codes of Rules into practice.
  • Order of the Government of the Russian Federation of June 21, 2010 No. 1047-r.
  • Requirements for the issuance of certificates of admission to the types of work affecting the safety of capital construction facilities (Order of the Ministry of Regional Development dated 30.12.10, No. 624, Government Decree No. 207 dated 24.03.2011).
  • Resolution of the Government of the Russian Federation of June 21, 2010 No. 468 "On the procedure for conducting construction control".
  • The Urban Planning Code of the Russian Federation, taking into account changes from 28.11.2011 No. 337-FZ.
2. Regulatory and legal framework for maintaining executive, technical and technological documentation in construction.
  • Federal Law "On Technical Regulation" No. 184-FZ dated December 15, 2010;
  • Rostechnadzor guidelines;
  • Requirements of regulatory and technical documents;
  • Requirements for project documentation;
  • National standards and codes of practice (Order of Rostekhregulirovanie dated 01.06.2010 No. 2079, Order of the Government of the Russian Federation dated 21.06.2010 No. 1047-r).
3. Executive documentation and its purpose in providing the organizational and technological scheme in construction.
  • The composition and procedure for maintaining executive documentation during construction, reconstruction, overhaul of capital construction facilities.
  • New requirements for the maintenance of as-built documentation in accordance with the Decree of the Government of the Russian Federation of June 21, 2010 No. 468 "On the procedure for conducting construction control".
  • Mandatory requirements of the current SNiPs and joint ventures for the execution of as-built documentation in the implementation of construction control.
  • Experience in automation of executive technical and technological documentation in construction.
4. Design documentation at the construction site.
  • Normative-legal and normative-technical support of design during the construction of objects: a review of documents.
  • The composition of the sections of the project documentation The composition of the sections of the project documentation and the basic requirements for their content (Decree of the Government of the Russian Federation No. 87 dated February 16, 2008).
  • Review of errors in design documentation leading to financial losses during the construction phase.

Day 2.

1. Production control.
  • Production control of building materials and construction and installation works at all stages of the technological process. Incoming quality control of building materials.
  • Features of relationships with suppliers of building materials, products and structures in modern conditions.
  • Methods of quality control of construction and installation works, control means.
  • Acceptance of certain types of work with the registration of the required documents.
  • Peculiarities of verification and execution of documentation during incoming quality control of incoming materials, products and structures in modern legal conditions.
  • Mechanical and physical methods of quality control of materials and technological process in construction.
  • Technology of earth pile and concrete works, quality assurance of construction.
  • Typical technological violations.
  • Features of operational quality control of monolithic structures manufactured (erected) in the conditions of a construction site.
  • Updating GOSTs for concrete work (GOST-7473-2010 from 01.01.2012).
  • Inspection of welded joints (SNiP 03.01-87).
  • Devices and methods of non-destructive testing.
2. Contractual work.
  • Types of contracts in construction and their features. The procedure for conducting contractual work. Errors in the conduct of contractual work. Termination of contracts in connection with violation of the standards of regulations, technical conditions, etc. Litigation and arbitration practice.
3. State control over quality in construction.
  • Changes in the system and structure of state supervisory bodies. Delimitation of powers between the bodies of Rostechnadzor and Gosstroynadzor. Change in the status of the state construction supervision. eight.
4. Errors in maintaining as-built documentation at the facility.
5. Responsibilityleaders and participants of the investment and construction process for quality and safety.
  • Updating of Articles 9.4 and 9.5 of the Code of Administrative Offenses of the Russian Federation. Changes to the Town Planning Code, strengthening the responsibility of construction participants for inadequate quality and safety (Federal Law No. 337 of 28.11.2011).
6. Answers to questions.
7. Issuance of documents.