The procedure for drawing up an estimate grand version 7 2. An overview of the estimator's profession: how to learn how to work in the Grand Estimate program and master the basics of construction pricing

The program has the following functions:

  • In order to optimally implement the provisions Federal law dated 05.04.2013 N 44-FZ "On the contract system in the field of procurement of goods, works, services for the provision of state and municipal needs"developed new method resource calculation of estimates using current prices (resource ranking method);
  • The composition of the PC "GRAND-Smeta" version 7 includes collections of consolidated prices for the NCS and NCKR, approved by orders of the Ministry of Construction No. 167 / pr dated 07.04.2014 and No. 506 / pr dated 28.08.2014;
  • In accordance with MDS 81-15.2000, in PC "GRAND-Smeta" version 7, a methodology for drawing up estimates for design and survey work using full-format collections of design and survey work has been implemented;
  • The calculation of physical volumes in the estimate was automated using the data previously entered in the local estimate;
  • Implemented the ability to directly access cloud and other data storages from the program for compilation and verification estimate documentation, confirmation of the scope of work performed according to the KS-2 form;
  • Added the ability to make commercial estimates using the real costs of construction work, materials, mechanisms;
  • And much more

When using the commands Subtract and Add a resource as a line item, an identifier is automatically generated

This makes it possible to automatically take into account the change in the volume of the added / removed resource when changing the volume of the quotation.

When dragging cells with physical volumes, identifiers are automatically generated for positions and resources

When dragging with the right mouse button pressed, you can select the "Insert link ..." item from the menu. In this case, an identifier will be automatically generated for the position that is being dragged, and then it will be entered at the position ON which was dragged.

When entering formulas in PC Grand Smeta 7.0you can use the mouse pointer to refer to other cells

If, when working with variables in the estimate, or when writing formulas in physical volumes (values), you need to refer to any other cell (physical volume of another position, or a line of variables), then just press the Ctrl key and then click on the desired line with the mouse cursor. The program will automatically substitute the identifier that is written for this line. If the string does not have an identifier, then it will be generated automatically. Likewise for resources. Now you don't have to worry about the presence of identifiers when you need to use the previously calculated values ​​in subsequent calculations.

Added the ability to copy a cell value, not a formula

If you need to copy the result calculated by the formula to the clipboard, you must use the appropriate command from the context menu, or use the shortcut keys Ctrl + Alt + C.

Such functionality is available for absolutely all cells in any tabs / bookmarks in all documents, including the OS / SSR.

Added the ability to expand formulas to their numerical representation

When expanding a formula, curly braces are removed from comments

When dragging a string with a variable from the parameters of the estimate to a position, the last one is filled with the identifier of what is being dragged

Now there is no need to manually enter identifiers. The link will be generated automatically.

V in PC Grand Smeta 7.0 d added the ability to unload several acts in one estimate

If you select several acts in the estimate parameters, then when you click on the toolbar button "Estimate based on acts", all selected acts will be uploaded to a new estimate.

In this case, a formula consisting of the physical volumes of the copied acts will be generated as the physical volume for the position.

When adding a position from the base to the estimate, you can turn off the return to the collection

After executing the Add or Insert command, an estimate will remain on the screen, to which items from the normative base have been added. Having put down the physical volume, having entered the necessary coefficients and indices, you can continue to enter prices. This feature is enabled as an option through the installation of the program.

Improved histograms when working with execution

Now, when working in the act mode, you can always see the total execution by position, as well as the ratio of the volume in this act to the volume according to the estimate in the context of time.

In PC Grand Smeta 7.0 added the ability to multi-edit values ​​for selected lines

You can enter a single price formula for all selected items, for example, for materials: TP / Index. In this case, the formula will calculate the quotient of dividing the current price by the Index variable. In combination with the ability to expand formulas, we will get a full-fledged numerical formula when printing.

In combination with the possibility of allocating in the estimate of prices with the same cipher, you can change the cipher of one work for another throughout the estimate:

V in PC Grand Smeta 7.0 d added the ability to enter limited costs in the form of a coefficient

Added the ability to change the color of the selected line

Leading to a common denominator, the highlight color - previously, the highlight color could be yellow ( current line) and bluish (highlighted lines) - we decided to allow the user to change the color.

Added the ability to autoload prices when making an estimate

If you enable this option, then when adding rates from the regulatory base, the estimate will be automatically loaded, for example, current prices. Thus, we will always see the actual cost according to the estimate, without having to load prices every time.

The technical part of the collection can be opened by a command from the context menu

When working with the list of collections, the command “Tech. part ", which opens the technical part of the collection. It is more convenient than using the button on the "Document" tab.

In PC Grand Smeta 7.0 added the ability to take into account the cost of materials from the resource calculation method when calculating a local estimate using indices

For example, when calculating a local estimate, the cost of payroll and the operation of machines can be calculated using indices, and the cost of materials can be taken from the resource method using built-in identifiers.

Calculation method qualifiers have been added to the local estimate for the built-in identifiers used with the list of limited costs: BC - calculation in basic prices excluding indices, BIM - calculation by the base-index method in accordance with the setting of indices in the estimate, TC - calculation by the resource method. Example of use: TC.MAT - will return the cost of materials for the resource method. BC.NR - will return the amount of overheads for calculation in basic prices. To be on the safe side, let's list all the built-in identifiers available:

Variable name

The value to be returned for the variable

TOTAL

Amount before calculating limited costs

WITH or Wed

The amount of construction work

M or MR

The amount of installation work

The amount of construction and installation work

O or ABOUT

Equipment amount

NS or NS

The amount of other work

Wage fund

The amount in the column "Remuneration of workers"

The amount of the column "Machine operation"

The amount under the column "including wages of drivers"

Amount in the column "Materials"

The amount in the column "Labor costs"

The amount in the column "Labor costs of drivers"

The amount of overheads calculated in the "standard" way

Sum estimated profit calculated in a "standard" way

NRZPM

The amount of overheads calculated from the RFP (used only when calculating according to the TSN methodology)

SPZPM

The amount of the estimated profit calculated from the RFP (used only when calculating according to the TSN methodology)

NRTOTAL

The amount of NR + NRZPM

TOTAL

Amount of SP + SPZPM

The sum of the winter rise in price calculated according to the table of standards (tab LZ - Winter)

RETURN

Returnable materials amount

MATZAC

The sum of the customer's materials

When dragging multiple positions, you can clearly see that the group is being dragged

Added the ability to update the memory value in accordance with the reference book

If you made edits in the memory list, or changed the temperature zone, you can restore the reference values ​​by pressing the right mouse button in the selection of the command "Update values ​​from the reference book".

Added the ability to erase the codes of the TCS, FSSC, etc. when adding materials from the collections of the regulatory framework.

If you want the collection cipher to be “cut off” when adding materials from the regulatory base or from the price tag, you must enable the corresponding option in the program settings.

When the setting is enabled, the collection cipher is "cut off" when added from the regulatory base:

Similarly, when adding current prices from catalogs:

When pasting data from the buffer, added the ability to save links to the source

Values ​​with links to the source are inserted on the "Links" tab in the "Variables" node. In order to insert a link, you need to copy the required cell in Excel. Next, on the "Links" tab, click on the "Paste from clipboard" button. Further use of these variables is similar general principles working with variables. They can be dragged with the mouse in position, they can participate in any calculations, etc.

If there have been changes in the source file, then when you click on the "Update links" button, the data will be re-read from the source file:

Setting paths for folders from ProgramData

Added the ability to change the paths for storing license files (Lic folder), reference books (LocalSetting folder) and calculation templates (SmetaProps folder).

When you drag and drop prices from the regulatory base, the rationale and name are "glued together" in the tooltip

In PC Grand Smeta 7.0 When dragging and dropping positions in the local estimate in the context menu, along with the name, the position justification is also displayed

When copying a quote from the base to the clipboard in the insert menu, the text is formed from its justification and name

When selecting by pattern, added the ability to select positions with completely matching ciphers

Two new sections "Transportation" and "Loading and unloading works" have been added to the list of resources according to the estimate

In order for the position of the estimate in fell into the corresponding sections of the resource sheet, the type of work of this position must have a corresponding sign.

In the results of the resource sheet, respectively, the amounts for these two new groups are also displayed:

For "old" estimates, you can change this feature manually. For new estimates, it will be necessary to update the reference books of the types of work, tk. this sign is set there.

The attribute for referring to a particular section of the resource sheet is displayed in the last column of the reference book. Prv Is transportation, Pgr Is loading and unloading operations.

Added the ability to enter your own comments to the estimate item

There are two such comments in the window with additional information about the position.

The ability to expand all sections in the estimate

Added the ability to enter monetary resources at the price for calculating wages by position

Using this opportunity, v you can enter cost estimates and calculate wages not through labor costs, but through a natural meter of the price itself.

When adding a price from the normative base to the estimate, the regions in the base and in the estimate are checked, if they do not match, a warning is issued

When switching between collections in the tree, the state of the table of contents is preserved

Added the ability to update the contents of the "My Forms" folder without closing the program

Unification of dialogs for opening external files for loading various information

To the list of available files in added information from the latest documents, as well as collections of the regulatory framework. Price tags from the regulatory framework may be needed to download basic prices, to download information about groups, cargo classes and gross weight.

Added the ability to divide resources into arbitrary groups

As a source of grouping, you can use any file-labels, including labels from the regulatory base. To download groups, you must select a source and click on the "Select all groups" button.

To enable the group selection mode, click on the corresponding button on the "Subgroups" panel:

When group highlighting is enabled, each group is totaled by total cost and gross weight:

Added the ability to group materials by cargo class with summing up by gross weight for each class

V to enable the grouping of materials by cargo classes, press the button "Cargo classes".

If there is information about the classes of cargo, the summary of the resource sheet in the summary line "Materials" will automatically display information about the total gross weight for each class of materials.

It should be noted that in if not all materials with the same cargo class have information about the gross weight, then the value with the total weight is displayed in red.

Added a resource ranking method for faster estimates at current prices

The resource ranking method allows you to select in the resource sheet only materials that are significant in the price sense and indicate the price only for them. This method by an order of magnitude reduces the complexity of drawing up estimates using the resource method, while the accuracy of the calculation remains at the same level. The resource ranking method is described in detail in a separate tutorial.

Reworked collections for design work

The appearance of the collections has been brought in line with their printed original.

The relative value ratios are highlighted in a separate group:

Reworked coefficients for design conditions.

Added the ability to draw up estimates for design and survey work using new collections for design work

The preparation of estimates for design and survey work is described in detail in a separate manual.

The appearance of the document is as close as possible to its printed version.

An example of an estimate for engineering and geological surveys:

Form 2p displayed in Excel:

Added the ability to skip inactive positions when renumbering the estimate

When this option is enabled, all items that are inactive will not participate in item numbering. It should be remembered that with this method of numbering, duplicate numbers may appear at the positions, because inactive positions also have their own number. To eliminate this situation, it is recommended to use the "Automatic renumbering" option. In this case, active positions in the estimate will not have duplicate numbers.

Added table of contents for collections in the Favorites folder

For reference books of types of work added the ability to group them

If there is a Vid_rabs folder in the folder with directories, then the directories of the types of work saved in it will also be displayed when selected. However, there may be subfolders in the Vid_rabs folder. In such cases, directories will be grouped by these folders when you select

For reference books with types of work, a description of their content has been added

The description is taken from the Comment tag of the Vidrab_catalog node.

The coefficients in the estimate have a separate field "Substantiation of the set"

Added the ability to load information on cargo classes and gross weight for materials into the estimate

In the object estimate and the summary estimate calculation, the ability to index with an unlimited number of indices has been added

In order to apply the index to any of the OS and CCP strings, it is enough to indicate in this line in the "Index Code" column the code of the required index. In this case, the index can be specified not only for the lines "Total by chapter ..." and "Total by chapters ...", but also for the lines "Total including ...".

A new TOTAL cost column has been added to the local estimate screen

This column displays the total value of the amount for the position of the estimate, taking into account HP, joint venture, coefficients and indices

Added the ability to calculate the unit cost indicator to the local estimate

To calculate the indicator, it is necessary to specify the number of units in the parameters of the estimate, as well as their unit of measurement. For example, if the estimate is made for the laying of 150 m of pipes, then the quantity will be equal to 150, and the unit of measurement is "m".

In the local estimate, the calculated value of the unit cost indicator can be seen in the window with totals:

Added the ability to specify hyperlinks for positions in the local estimate, as well as links to any external sources with data

  • You can provide a link to a source with a price (for example, a supplier's website)
  • You can provide a link to information describing the production technology, for example, from Grand-StroyInfo or from the manufacturer's website
  • You can save a link to the photo with the defect when calculating the cost of the repair work
  • You can provide links to drawings, sheets in these drawings, drawn up using the appropriate CAD systems, as well as accounting systems for this documentation.

During further work, you can quickly access the saved links through the Data - Hyperlinks tab by selecting the desired link from the drop-down menu

Changed the structure of the window with additional information about the position in the local estimate

Changed the arrangement of bookmarks: now their list is displayed on the left in the window with additional information about the position. At the same time, some of the information that until now has always been displayed in the upper part of this window (the formula for calculating the physical volume, the value of the physical volume, the multiplicity factor of the meter) has now been transferred to new bookmark"Physical volume".

When working with coefficients in the estimate position, the mode of adding coefficients from the technical part of the collection has changed. The corresponding button is now called "PM", and when this button is pressed, the list of coefficients from the technical part does not open in a separate window, as it was in previous versions of the program, but in the lower part of the window with additional information about the position. The coefficient is added by dragging it with the mouse or by pressing the "Add" button, while the list of coefficients from the technical part remains on the screen, and the added coefficient becomes inactive and goes to the end of the list. The "Close" button or the second pressing of the "PM" button allows you to turn off the display on the screen of the list of coefficients from the technical part of the collection.

On the “Comments” tab, the ability to enter additional textual explanations related to the estimate item has been added.

Added the ability to generate a summary resource sheet for the completed amount of work

When working with a consolidated resource sheet (which shows the need for resources for several local estimates, for the entire facility or an entire construction site), the ability to display data only for the completed amount of work has been added. These data are formed on the basis of the compiled acts of work performed according to the original local estimates. Switching to the data display mode for the completed amount of work is carried out by pressing the "Report by period" button, while the dates of the beginning and the end of the period are indicated next to them with the possibility of their correction. When you press the button "Report by period" again, you return to the operating mode with complete data for the entire scope of work specified in the original estimates.

The construction industry is an area in which you can get a good income at any economic situation in the country. Even during the crisis, the construction of houses, office buildings, shopping centers, industrial and infrastructure facilities continues. There is a constant shortage of qualified specialists in this industry, so it is quite easy to find a job. At first glance, construction professions are associated with hard physical labor, and this creates certain restrictions for everyone who strives to receive a decent salary, but cannot boast of suitable physical characteristics.

However, there is a place in this area for knowledge workers! For example, the profession of an estimator does not have such restrictions - women, people of age, or simply not prone to heavy physical activity can be realized in it. At the same time, the level of salaries is quite high even at the initial stage, and specialists who are able to draw up documentation and maintain estimate calculations, are in demand even with a basic level of training.

Professional duties of estimators

An estimator is a specialist whose duties include calculating the cost of construction, repair, restoration work at the project stage and drawing up the corresponding estimate documents in accordance with SNiP and GOST standards. The task of the estimator is also to optimize costs and agree on contractual prices for different kinds work with contractors. The estimator also takes into account the cost of wages of employees, the cost building materials, transportation and other costs and forms a consolidated estimate of the project, laying down profit margins, taking into account all factors and the available budget.

The duties of a specialist in estimated rationing may include the following tasks:

  • Calculation and coordination of costs for construction and installation work;
  • Determination of the actual scope of work based on technical documentation;
  • Estimation of costs at all stages of construction and commissioning of the facility;
  • Monitoring and calculation of prices for the purchase of materials and construction equipment;
  • Preparation of price proposals under contracting agreements;
  • Registration estimate and design documentation, accumulative statements, acts of writing off materials, acts of acceptance and delivery of works;
  • Work with tender documents;
  • Feasibility study of costs;
  • Examination of estimates of contractors;
  • Drawing up and control of signing the acts of completion.

How much does a surveyor earn in Moscow and the region

The Job50.ru portal, based on the vacancies available on the website, in July 2016 estimates the average salary of an estimator in Moscow at 45,000 rubles per month, while the expectations of specialists in estimated rationing are slightly higher - 52,000 rubles on average. The basic rate of an assistant estimator starts at 25,000 rubles, and experienced specialists can count on a salary of 80,000 rubles.

According to the Trud.com portal, the average salary of a surveyor in Moscow and the Moscow region is 60,000 rubles, based on 660 current vacancies. The salary range varies from 26,200 to 92,800 rubles. The head of the estimate department receives an average of 100,000 rubles.

Requirements for professional training of surveyors

The profession of a estimator requires knowledge of the basics of economics, an understanding of technological processes and the structure of work in a company. At the same time, higher education in the field of economics or construction is desirable, but not strictly required. For the position of assistant estimator, employers are ready to accept applicants without experience on an internship of 3 months or more.

The following skills will be an advantage when applying for a job as an estimator:

  • Knowledge of the estimate and regulatory base (GESN, FER, Moscow estimate and regulatory base TSN-2001;
  • Ideas about the technologies of construction and repair work;
  • Knowledge of modern GOST and SNiP standards;
  • Ability to read drawings and technical documentation;
  • Ability to draw up local, object, resource, summary estimates, bills of volume of work, subcontracting and other acts (forms KS-2, KS-3, KS-6a, M-29) and other types of estimate and design documentation;
  • Knowledge of MS Excel;
  • Ability to work in software systems for the automation of budget calculations (Grand Smeta, Smeta.ru, RIK).

How to master the complex "Grand Smeta"

"Grand-Smeta" is a software package for estimating engineers developed by the "Grand" group of companies with the aim of automating estimate calculations, filling out acts and various forms of estimate document flow. The complex contains the main estimate and regulatory framework approved by the Gosstroy of the Russian Federation.

It is not difficult for practicing estimators to understand the work of the program - they understand all the terms, names of forms and tasks. Therefore, it is enough for them to carefully study the menu, toolbar and reference books, and then practice drawing up estimates and documents with the substitution of indices, variables, identifiers, norms and prices from the required database.

If you do not have basic knowledge of the estimate business or sufficient work experience, it is almost impossible to master the "Grand-Estimate" program on your own - a lack of understanding of the terminology and purpose of certain instruments is a serious obstacle. Therefore, beginner estimators are advised to study the program simultaneously with theoretical foundations estimate and design calculations.

Where the profession of the estimator is trained

Currently, universities do not teach the specialty of an estimator, but there are programs in the direction of "Economics in construction". Construction, technical or engineering education will be an advantage. Having a higher or secondary vocational education, you can complete short-term courses for estimators and start working as an assistant or trainee in construction company or budget and contractual organization.

Effective courses in budgeting in Moscow are held at the 101 course training center, which for many years has specialized in training workers in the construction industry:

The advantage of this study program is the opportunity to master a prestigious profession from scratch in 18 lessons, a balanced theory and analysis of practical problems, as well as helping graduates with official employment in Moscow.

What is "Grand Smeta"? This is a specially developed software package, calculated for the compilation and subsequent verification of the prepared calculations for the estimate, the formation of acts of work performed. Can be developed using software and types of various removable documentation, calculated for the subsequent determination of the current cost of construction work. Development this security deals with the group of companies "GRAND". In addition to this functionality, the special complex includes various regulatory frameworks developed taking into account the contents of the norms and price tags approved legal acts Gosstroy RF. Further, it is proposed to consider what the working "Grand-Estimate" includes, what is its main functionality and key provisions that will help to best determine the working capabilities of the complex.

Description of the functionality of the software Grand Smeta

Provided by "Grand-Smeta" working version differs in the following functionality:
  1. The user compiles various calculations of a local kind, in particular, the use of the resource-index, basic-index method characteristic of a given software product, as well as their subsequent combination in a specific document, summarizing, and comparative analysis.
  2. You can easily carry out the formation of estimates in automatic mode, for which various names of previously executed acts on operations are used. This functionality allows you to reduce the total time spent on the user's work, and is distinguished by significant savings.
  3. Having made the decision to download the working "Grand Estimate", you can easily work out the object calculations, which can be performed on the basis of the existing calculations of a local nature. It should be noted that the process is configured automatically, which also allows you to distribute necessary costs on specific chapters, the subsequent synchronization of data, their change and correction. The calculation of the actual cost indicator for a specific object of an earlier operation is performed in a similar way.
  4. In the same automatic mode, you can conduct summary statements for resources, for which acts of previously completed work are used as the main document. A general resource sheet is formed for the directly remaining work performed.
  5. The software product allows you to use external macros specifically for correcting and changing a certain kind of data, key parameters in several estimates. This option will help to manage several estimates at the same time, guarantee getting practical functionality and correct display of data in the document.

Other versions of the Grand-Smeta program and features of work

Besides what is offered download a free working "Grand Estimate", you can also analyze the capabilities of other versions of the software product. The presence of the "Flash" version is noted, which is a mobile version of a regular program recorded on a separate device (it is also called a flash key). This device plays a certain role of a special electronic key with the option of data protection, as well as the drive. Among the advantages, it is worth noting that software in this version does not require installation on a personal computer, the launch is carried out directly from the flash key. The entire current database, which is used during operation, is automatically saved to the same key.

Special attention should be paid to the program of the "Prof" version, with the provided MINI-key. In this case, you can download the working version of "Grand-Smet", which, in terms of its functionality, completely excludes certain physical damage to the device. For example, a similar software product can be used without problems when working with laptops and netbooks. It is worth noting that the number of the key itself is engraved directly on the device itself.

Benefits of using the program

The main advantages of using this program include the following:
The ability to quickly generate a log of operations performed at the enterprise.
The report on the calculation of specific materials is automatically updated (in this case, the operation is performed within the framework of compliance with the M-29 form).


Compiled summary calculations according to estimates regarding the cost of a specific construction. Also among the advantages can be called the calculation of the unit cost, which is performed in unit indicators.
The user can easily get at the disposal of a report on the current consumption of materials, the use of specific equipment, consumable components.

For the convenience of completing the materials, you can easily enter into the current calculation of duties, any taxes established by the contractual, tender coefficient, which are marked as characteristic of a specific activity. In a similar way, HESN, TEP, ISN and much more can be used, and certain indices can be linked to them according to the names of the work being done. The program is easy to work with. It is the features and functionality of the "Grand-Smeta" program that are the key to the success of this program among the estimators of Russia.

After launch PC Grand Smeta a window appears on the screen containing the structure of construction elements. From this screen, work begins on the preparation of the estimate.

When using the program, you can work with two sets of estimates: My estimates and Network estimates... Wherein, My estimates are stored on the local computer and are inaccessible to anyone except the computer user. Network estimates are stored on a server computer. Access to them is determined (configured) separately for each folder (estimate). Working with estimates in online (multi-user) mode will be described in the next chapter. Work with estimates for any set is the same. This chapter will cover working with a folder My estimates... Usually, local estimates compiled for construction sites, objects. Therefore, to create an estimate in a PC Grand Estimate you need to do the following:

· Create a header (folder) for the construction.

· Create a title (folder) of the object.

· Create a header (folder) of the estimate.

Open the My estimates folder.
Create a header (folder) Construction.
Create a title (folder) for the Object.
Create a title (folder) of the Estimate.

With the mouse cursor on the right side of the screen, right-click and select the item Create... Then select the required command Construction, Object, Estimate, depending on what you need, according to the above procedure.

Move the mouse cursor over the name of the estimate and, by clicking the right mouse button, in the menu that appears, select the command Rename. The previous name will be highlighted in blue. Enter the new name of the estimate.

While in the estimate, go to Estimate parameters by pressing the button Options on Toolbars or the F6 key on your keyboard. Select a bookmark Options, indicate Region and 1984 Pricing Area... or Price area 2001.

Click the button Base on Toolbars... The program will show the content of the regulatory framework. Normative base consists of collections 1984 year and 2001 year, which in turn contain groups of collections on Construction works, Renovation work, Installation work etc.



Select the collection in which you want to find a quote by highlighting it with the mouse cursor. The sections of this Collection will appear on the right side of the screen. Expand any section of the Collection by double-clicking the left mouse button.

Inside the Collection, press the button on Toolbars, and in the dialog box that appears, select the bookmark with the mouse cursor Search by text... In line Search text enter the key phrase (do not indicate the endings in words), which is present in the name of the price. Determine the direction of the search by setting the switch to First, Forward or Back... Click the button Search... Pressing the button again Search will show the next snippet of the found string.

If you select a bookmark Search by justification, then you can search for a quote according to a previously known justification, which must be entered into the search bar.

Open the Collection you have and press the button Those. part on the toolbar. To return back to the collection press the button Collection located on Toolbars.

Go to Additional information about the price by clicking the right mouse button and selecting the appropriate menu item, or the F3 key on the keyboard, or the button on the Toolbar. In the dialog box that appears, select the Coefficients from T.P. tab, which lists all the coefficients that can be applied (in the estimate) according to the technical part for the selected price.


Main literature

1. STARK_ES. A software package for calculating spatial structures for strength, stability, vibrations: User's Guide. - M .: Eurosoft, 2008 .-- 383 p.

2. Simbirkin V.N., Kurnavina S.O. Static and dynamic analysis of reinforced concrete monolithic building frames using software package STARK_ES: Tutorial / Ed. Yu.P. Nazarova - Moscow: Federal State Unitary Enterprise “Research Center“ Construction ”, LLC“ Eurosoft ”, 2007. - 158 p.

3. Gorodetsky A.S., Evzerov I.D. Computer models of structures. - Kiev: Publishing house "Fact", 2005. - 344 p.

4. Strelets-Streletsky E.B., Genzersky I.D., Laznyuk M.V., Marchenko D.V., Titok V.P. Lyre 9.2. User guide. Fundamentals: Textbook / Ed. Academician of the RAAS A.S. Gorodetsky. - Kiev: Publishing house "Fact", 2005. - 146 p.

5. Barabash M.S., Genzersky Yu.V., Marchenko D.V., Titok V.P. Lyre 9.2. Examples of calculation and design: Textbook. - Kiev: Publishing house "Fact", 2005. - 106 p.

6. Genzersky Yu.V., Kutsenko A.M., Marchenko D.V., Slobodyan Ya.O., Titok V.P. Lyre 9.2. Examples of calculation and design: Tutorial. - Kiev: Publishing house of NIIASS, 2006 .-- 106 p.

7. Yusipenko S.V., Batrak L.G., Gorodetsky D.A., Rasskazov A.A. Monomakh 4.0. Examples of calculation and design: Textbook. - Kiev: Publishing house "Fact", 2005. - 263 p.

8. Veruzhsky Yu.V., Kolchunov V.I., Barabash M.S., Genzersky Yu.V. Computer technologies for the design of reinforced concrete structures. Course design. - Kiev: Aviation Institute Book Publishing House, 2006.

additional literature

1. Gorodetsky A.S., Batrak, Gorodetsky D.A., Laznyuk M.V., Yusipenko S.V. Calculation and design of structures high-rise buildings from monolithic reinforced concrete (problems, experience, possible solutions and recommendations, computer models, information Technology). - Kiev: Publishing house "Fact", 2004. - 106 p.

2. Perelmuter A.V., Slivker V.I. Design models of structures, the ability to analyze them. - Kiev: Publishing house "Steel", 2002. - 601 p.

Control questions at the rate

"Computer methods of design and calculation building structures»

Direction "Construction", profile CBC, qualification bachelor, specialization "Construction of high-rise and large-span buildings and structures", qualification engineer

1. The concept of information technology.

2. Properties of information.

3. Types of work with information.

4. Special Information Systems in construction.

5. Computer-aided design of construction objects. The order of development and composition of project documentation.

6. Design organizations and development computer technology design.

7. Design functions.

8. The concept of CAD and the principles of its construction.

9. CAD structure, supporting and designing subsystems.

10. Assignment for the design of construction projects.

11. Distribution of design work.

12. Survey work.

13. Organizational and technological preparation of design and planning of design work.

14. Technological lines of automatic design.

15.ArchiCAD.

16. Autodesk.

17.AutoCAD Civil 3D .

18. GeoniCS Topoplane , structure, purpose of modules.

19.Allplan , structure, purpose of individual systems.

20... SP LIRA , purpose, main functions, areas of application.

21. SP LIRA , basic modules, special systems.

22. SP LIRA - graphic sphere LIR-VISOR .

23. SP LIRA - LIR-ARM, LIR-LARM .

24. SP LIRA - LIR-STK, LIR-RS, LIR-KS, LIR-KTS, LIR-KM .

25.SP LIRA - systems: Soil, MONTAZH-plus.

26.SP LIRA - systems: Bridge, Dynamics .

27. SP LIRA - systems: Model variations, Superelement calculation method.

28.SP LIRA - PP Geometric characteristics of sections, Statics, Dynamics, Stability.

29.PK LIRA - PP Reinforced concrete structures .

30.SP LIRA - PP Steel structures.

31. PK LIRA - PP Loads and influences, PP Bases and foundations.

32. PK LIRA - PP Stone and reinforced masonry structures, PP Wooden structures.

33. SCAD Office PC - purpose, scope, structure.

34... PC SCAD - a set of programs.

35. PC SCAD - Kristall program .

36. PC SCAD - Arbat program.

37... PC SCAD - programs Fireplace, Decor .

38. PC SCAD - Programs Request, Slope, Cross .

39. PC SCAD - Monolith program.

40. PC SCAD - program West, Comet.

41. PC SCAD - programs Section Designer, Consul, Tonus, Sesame.

42. PC Monomakh.

43. Calypso - computer-aided design line .

44. PC STARK ES ".

45. PC MicroFe.

46. Robot Millennium PC.

47. PC MAESTRO.

48. PC for calculating foundations: FOK-PK, FOK-PK Strip foundations, Foundation.

49. All-in-One PCs - ANSYS .

50. Universal PCs - NASTRAN .

51. Universal PCs - COSMOS.

52. Programs for the organization of construction production - HECTOR: AWP PPR.

53. Programs for the organization of construction production - HECTOR: PROVIDER - BUILDER.

54... PC for BZD: SITIS VIM, SITIS: Floutek.

55. PC Grand Smeta.

56. PC by BZD: TOXI .

57. PC for BZD: NSIS Fire safety .

58. PC for ecologists: Environmental payments, UPRZA Ecolog.

59. PC for ecologists: Ecolog-Noise, Noise ventilation systems.

60... PC for environmentalists: Norm, Risks, Medium.