Equipment cost change index. Forecast indices of the Ministry of Construction of the Russian Federation

THE GOVERNMENT OF MOSCOW

COMMITTEE OF THE CITY OF MOSCOW ON PRICE POLICY IN CONSTRUCTION

AND STATE EXPERTISE OF PROJECTS

ON APPROVAL OF VALUE CHANGE INDICES

MATERIAL RESOURCES AND EQUIPMENT

List of changing documents

(as amended by order of Moskomexpertiza

from 25.03.2016 N MKE-OD / 16-10)

In accordance with clause 4.2.11 of the Regulation on the Moscow City Committee for Pricing Policy in Construction and State Expertise of Projects, approved by the Moscow Government Decree of February 24, 2011 N 48-PP, I order:

  1. To approve and enter into force from January 1, 2016:

1.1. The consolidated index of changes in the value of material resources not provided for by the TSN-2001 estimate and regulatory framework, in current level prices of the first quarter of 2016 to the base price level of 2000 in the amount of 4.69.

1.2. changes in the cost of equipment in the current price level of the 1st quarter of 2016 to the base price level of 2000 (annex).

Acting Chairman

R.Yu. Maslov

The effect of the indices of changes in the cost of equipment at the current price level applies to the II quarter of 2016 (clause 3 of the order of Moskomexpertiza dated March 25, 2016 N MKE-OD / 16-10).

Application

to the order of Moskomexpertiza

CHANGES IN THE COST OF EQUIPMENT IN THE CURRENT PRICE LEVEL

Q1 2016 TO BASIC PRICE LEVEL 2000

List of changing documents

(as amended by order of Moskomexpertiza

from 25.03.2016 N MKE-OD / 16-10)

N p / p Industry Index
1 2 3
1. Economy as a whole 2,96
2. Agriculture, hunting and service provision in these areas 2,96
3. Food production, including beverages 3,35
4. Textile production 3,01
5. Wood processing and manufacture of wood and cork products, excluding furniture 2,71
6. Publishing and printing activities, duplication of recorded media 2,88
7. Production of coke and petroleum products 3,45
8. Chemical production 3,53
9. Manufacture of other non-metallic mineral products 2,93
10. Metallurgical production 3,48
11. Manufacturing of finished metal products 3,35
12. Manufacture of office equipment and computers 3,08
13. Manufacture of electrical machines and electrical equipment 3,08
14. Production of equipment for radio, television and communication 3,22
15. Manufacture of medical equipment, measuring instruments, optical instruments and apparatus, watches 3,16
16. Manufacture of cars, trailers and semi-trailers 3,02
17. Production, transmission and distribution of electricity, gas, steam and hot water 3,37
18. Collection, purification and distribution of water 3,28
19. Construction 2,88
20. Wholesale trade, including trade through agents, other than trade by motor vehicles and motorcycles 3,02
21. Retail trade, except trade in motor vehicles and motorcycles; repair of household goods and personal items 3,05
22. Hotel and restaurant activities 3,64
23. Land transport activities 3,18
24. Water transport activities 3,46
25. Air transport activities 3,51
26. Connection 2,28
27. Financial intermediation 3,00
28. Insurance 3,19
29. Real estate operations 2,98
30. Provision of other types of services 3,18
31. Compulsory social security 2,67
32. Education 2,76
33. Health care and social services 2,75
34. Wastewater, waste disposal and similar activities 2,88
35. Activities for the organization of recreation and entertainment, culture and sports 2,75

In accordance with clause 4.2.11 of the Regulations on the Moscow City Committee, approved by the decree of the Moscow Government dated February 24, 2011 N 48-PP, I order:

1.1. Collection of conversion factors to the current level estimated cost construction and installation works, defined in the norms and prices TSN-2001. Issue 81. Collection N 06/2013, June 2013.

1.2. A collection of indicators of the cost of operating construction machines at the current price level. Issue 06/2013, June 2013

2.1. Aggregated index of changes in the cost of material resources not provided for by the TSN-2001 estimate and normative base, at the current price level of the third quarter of 2013 to the base price level of 2000 in the amount of 4.312.

2.2. Indices of changes in the cost of equipment in the current price level of the III quarter of 2013 to the base price level of 2000 ().

2.3. Coefficients (indices) of changes in "other works" of the consolidated estimate in the current price level of the third quarter of 2013 to the base price level of 2000 ().

3. I reserve control over the execution of this order.

Annex 1
to the Moscow Committee
on pricing policy in construction
and state expertise of projects
dated June 25, 2013 N 34

Indices of changes in the cost of equipment in the current price level of the III quarter of 2013 to the base level of prices in 2000

N p / p Industry Index
1 2 3
1. Economy as a whole 2,80
2. Agriculture, hunting and service provision in these areas 2,88
3. Food production, including beverages 3,21
4. Textile production 2,75
5. Woodworking and manufacture of wood and cork products, excluding furniture 2,79
6. Publishing and printing activities, duplication of recorded media 2,68
7. Production of coke and petroleum products 3,06
8. Chemical production 3,06
9. Manufacture of other non-metallic mineral products 2,89
10. Metallurgical production 3,34
11. Manufacturing of finished metal products 3,16
12. Manufacture of office equipment and computers 2,79
13. Manufacture of electrical machines and electrical equipment 2,79
14. Production of equipment for radio, television and communication 2,92
15. Manufacture of medical equipment, measuring instruments, optical instruments and apparatus, watches 2,88
16. Manufacture of cars, trailers and semi-trailers 2,86
17. Production, transmission and distribution of electricity, gas, steam and hot water 3,14
18. Collection, purification and distribution of water 3,05
19. Construction 2,89
20. Wholesale trade, including trade through agents, except trade in motor vehicles and motorcycles 2,77
21. Retail trade, except trade in motor vehicles and motorcycles; repair of household goods and personal items 2,77
22. Hotel and restaurant activities 3,31
23. Land transport activities 3,04
24. Water transport activities 3,11
25. Air transport activities 3,15
26. Connection 2,10
27. Financial intermediation 2,91
28. Insurance 2,91
29. Real estate operations 2,78
30. Provision of other types of services 2,98
31. Compulsory social security 2,45
32. Education 2,51
33. Health care and social services 2,54
34. Wastewater, waste disposal and similar activities 3,03
35. Activities for the organization of recreation and entertainment, culture and sports 2,56

Appendix 2
to the Moscow Committee
on pricing policy in construction
and state expertise of projects
dated June 25, 2013 N 34

Coefficients (indices) of changes in "other costs" of the consolidated estimate in the current price level of the third quarter of 2013 to the base price level of 2000

N pp Name of chapters, objects, works and costs Coefficient
4 Land payment upon withdrawal (redemption) land plot for construction 5,40
5 Rent for land for the period of design and construction 5,40
1.2.1a Compensation for cut down green spaces and monetary form compensatory landscaping (included in the local estimate for cutting down green spaces) 5,05
1.2.2 Compensation for the demolished buildings and orchard plantings, compensation for losses and losses on the transfer of buildings and structures (or the construction of new buildings and structures to replace the demolished), in case of compensation for losses in the allotment of land 5,05
1.2.3 Reimbursement of expenses related to the relocation of residents from demolished residential buildings 5,56
1.2.4 Compensation for losses of forestry production caused by the seizure (redemption) for the construction of forestry lands 5,05
9.3 Transportation costs by car workers of construction and installation organizations or reimbursement of expenses for the organization of special routes for urban passenger transport. Taken into account when construction is carried out outside Moscow and the absence of urban passenger routes 5,56
9.4 The costs associated with the secondment of workers to perform construction, installation and special work. If the transportation of employees is carried out by our own or rented transport construction organization, the cost of travel to travel expenses are not included, but accounted for by. 5,56
9.6 The costs associated with the maintenance and operation during the construction of environmental facilities: treatment facilities, wastewater treatment, etc. 5,05
9.9 Expenses for payment of traffic police services for escorting oversized and heavy cargo 5,56

Document overview

Approved and introduced from June 1, 2013. Collection of conversion factors to the current level of the estimated cost of construction and installation works, determined in the norms and prices TSN-2001 and the Collection of indicators of the cost of operating construction machines at the current price level.

From July 1, 2013, the following will be put into effect: a consolidated index of changes in the cost of material resources not provided for by the TSN-2001 estimate and regulatory framework, at the current price level of the third quarter of 2013 to the base price level of 2000 in the amount of 4.312; indices of changes in the cost of equipment in the current price level of the III quarter of 2013 to the base price level of 2000; coefficients (indices) of changes in "other works" of the consolidated estimate in the current price level of the third quarter of 2013 to the base price level of 2000.

STATE ESTIMATE STANDARDS

MDS 81-01-12-2011

METHODOLOGICAL DOCUMENTS IN CONSTRUCTION

METHOD
FORECAST INDEX CALCULATION
CHANGES IN CONSTRUCTION COST

Moscow 2011

DEVELOPED The federal government agency"Federal Center for Pricing in Construction and Industry building materials»

APPROVED BY by order of the Ministry of Regional Development Russian Federation dated 20.08.2009 No. 355.

INTRODUCED in the federal register of estimated standards to be applied in determining the estimated cost of objects capital construction, the construction of which is planned to be carried out with the involvement of funds federal budget under registration number from 25.01.2010 No. 114.

METHOD
CALCULATION OF FORECAST INDICES OF CHANGE
CONSTRUCTION COSTS

Section I. General Provisions

1. This method of calculation forecast indices changes in the cost of construction (hereinafter referred to as the Methodology) establishes the procedure for the development, consideration and implementation by the Ministry of Regional Development of Russia of forecast indices of changes in the estimated cost of construction, differentiated by cost items of the consolidated estimate of the cost of construction, including: indices of changes in the estimated cost of construction and installation work, indices changes in the estimated cost of design and survey work, indices of changes in the estimated cost of other work and costs, indices of changes in the cost of equipment (hereinafter - forecast indices).

2. Forecast indices are intended for aggregated calculations of the construction cost by the base-index method, the formation of the initial (starting) cost of construction in the preparation of tender documentation, general economic calculations in the investment sphere for capital construction projects, financing of which is carried out with the involvement of the federal budget.

Section II. Procedure for developing forecast indices

3. The development of forecast indices is carried out on a quarterly basis by the Federal State Institution "Federal Center for Pricing in Construction and the Building Materials Industry" (hereinafter FGU - FCTsS).

5. When developing, forecast indices are differentiated:

By type of construction - apartment buildings, educational facilities, healthcare facilities, administrative buildings, sports facilities, public utilities, boiler houses, engineering networks and sewage treatment plant, reclamation facilities, cultural and consumer services, hydraulic structures, artificial road structures, highways, railways, main pipelines, and other facilities;

By types of the used estimate and normative base - federal unit rates (FER-2001), territorial unit rates (TEP-2001);

By the method of application - to the elements of the structure of direct costs (labor remuneration, operation of machines and mechanisms, the cost of materials), to the cost of construction and installation work, taking into account overhead costs and estimated profit;

By the territory of application - by the constituent entities of the Russian Federation;

By elements of the cost of the consolidated estimate of the cost of construction - to the cost of equipment, to the cost of design and survey work, to the cost of other work and costs.

6. Forecast indices are defined as the product of the current indices, calculated in accordance with this Methodology, by the forecast inflation rate established by the Ministry economic development Of the Russian Federation for the corresponding quarter.

7. Current indices of changes in prices for equipment and other work and costs are determined on an accrual basis based on data on the cost of equipment and other work and costs (as of 01.01.1991 and 01.01.2000), taking into account quarterly producer price indices in construction (equipment and other work and costs) reported by the federal state statistics body.

8. Current indices of changes in the cost of design and survey work are determined as the ratio of the cost of design (survey) at the current price level to the constant value of the base price for the development of design documentation (survey), determined by reference books base prices for design work. The cost of design (survey) at the current price level is determined in accordance with the data on the dynamics of changes in the structure of the cost of costs for the implementation of design work, provided by design organizations.

9. The calculation of the current indices of changes in the estimated cost of construction and installation works is carried out using the appropriate resource and technological models (hereinafter - RTM) based on the reporting data of regional authorities for pricing in construction, data from state statistics.

10. RTM is formed in the following order:

10.1. Local estimates are selected from the object estimate, taking into account the estimated cost of the main structural elements of the object, the total cost of construction and installation work of which is more than 70%.

10.2. Of these local estimates sampling labor resources, used construction machines and mechanisms, material resources.

10.3. On the basis of a selection of resources, an array is developed, consisting of two blocks - resource and cost.

10.4. The RTM resource block includes the following resource components:

Standard labor intensity of construction workers (assemblers);

The normative number of machine-hours for the nomenclature (set) of construction machines, mechanisms and vehicles;

Consumption of material resources according to the nomenclature (set) determined by the resource selection.

The consumption of the material and labor resources used, as well as the norms of the operating time of construction machines in the RTM are fixed values.

10.4.1. The standard labor intensity is determined for the average category of construction workers provided for in the RTM, and is taken into account in man-hours.

10.4.2. Based on a sample of resources, an analysis of the range of construction machines and mechanisms is carried out in order to determine the types of machines and mechanisms that prevail in terms of estimated cost.

Machines and mechanisms, the operating cost of which is more than 80% of the total operating cost, are selected from estimates and used as representative machines in RTM. For each representative machine, a standard operating time in machine hours is allocated. Machines and mechanisms, the operating cost of which is up to 20% of the total cost of operating machines, are combined into the group "Other machines and mechanisms", while the costs of their operation are set as a percentage of the total cost of construction machines and mechanisms, determined by the RTM.

10.4.3. In cases where the range of material resources is extensive, the following is carried out:

Analysis of the nomenclature of material resources in order to combine them according to their characteristics;

Combining into groups of materials and products of the same name of various grades and brands (concrete, mortar, precast concrete and reinforced concrete products, reinforcement, etc.);

Determination of the reduced amount of materials based on the material prevailing in terms of estimated cost;

Combining material resources, the total indicators of which are specific gravity up to about 20% of the total cost of materials, in the "Other materials" group.

10.5. The RTM cost block takes into account:

10.5.1. V base cost(as of 01.01.2000) the following are taken into account:

a) remuneration of construction workers in the baseline price level (OTbase), defined as the product of the standard labor intensity in man-hours (man-hour) according to RTM by the hourly wage rate in the base price level of the corresponding category of construction workers, adopted in the development of collections FER-2001, TEP-2001;

b) the cost of operating construction machines in rubles / machine-hours (rubles / machine-hour) (EMbaz), adopted in accordance with the relevant collections of estimated norms and prices for the operation of construction machines and vehicles at the basic price level, multiplied by the standard number of machines - hours defined in RTM. To match the cost accounted for in the RTM and the cost accounted for by the resource sheet, the total cost of operating construction machines includes the sum of machines and mechanisms combined in cost, having a specific weight of up to 20% in the total cost of operating machines;

c) the cost of material resources, adopted in accordance with the relevant collections of estimated prices for materials, products and structures as of 01/01/2000 by the nomenclature (set) of resources, multiplied by their normative or reduced need, defined in the RTM (Mbaz). To match the cost accounted for in the RTM and the cost accounted for by the resource sheet, the total cost of material resources (Mbas) includes the sum of materials, products and structures combined in cost, having a specific weight of up to 20% in the total cost of material resources and for which it is possible not track current prices.

10.5.2. The current value for RTM includes:

a) the remuneration of construction workers at the current price level (OTTek), defined as the product of the normative labor intensity according to the RTM by the hourly wage rate at the current price level of the corresponding category of construction workers, which is determined by the formula:

T- standard labor intensity in man-hours (man-hour);

tp- the standard number of hours of work of one worker per month, hours (h);

WITH 1 - monthly wage rate of a worker of the 1st category when working in standard working conditions, rubles (rubles).

In accordance with subparagraph "a" of paragraph 2.3 of the Federal Sectoral Agreement on the Construction and Industry of Building Materials of the Russian Federation for 2008-2010, the size of the minimum monthly wage rate of a worker of the 1st category is established from 01.01.2008 at least 1.2 values living wage for the able-bodied population officially established in the corresponding constituent entity of the Russian Federation.

TO T - tariff coefficient the corresponding category of work;

Ki- coefficients that take into account surcharges and surcharges to tariff rates and salaries for work with difficult and harmful, especially difficult and especially harmful working conditions, for traveling, mobile and rotational nature of work, premiums for professional skills, overtime work, performance of especially important tasks and others;

Cr - district coefficient to wages established by law Cr m;

PV - other payments made at the expense of funds taken into account in labor costs in accordance with the current regulatory documents (regular and additional vacations, length of service, allowances for continuous experience in the regions of the Far North and areas equated to them);

b) submitted by regional authorities for pricing in construction estimated prices 1 machine-hour (machine-hour) at the current price level, according to the nomenclature of construction machines, mechanisms and vehicles defined in the RTM, multiplied by the standard or reduced number of machine-hours (EMtek). To match the cost accounted for in the RTM and the cost accounted for by the resource sheet, the total cost of operation of construction machines (EMbaz) includes the current value of machines and mechanisms combined in value, obtained by multiplying the base (as of 01.01.2000) cost of the combined machines by the index of the basic technique obtained in the RTM;

c) current average estimated prices for materials, products and structures according to the data of regional authorities for pricing in construction, taking into account the average delivery costs, procurement and storage costs and intermediary services (transport costs within the prevailing in the region) according to the nomenclature of resources in accordance with the RTM multiplied by their standard number (Mtek). To match the cost accounted for in the RTM and the cost accounted for by the resource sheet, the total cost of material resources (Mbas) includes the current cost of materials, products and structures (other materials) combined by cost, obtained by multiplying the base (as of 01.01. ) the cost of other materials for the index for basic materials obtained in the RTM.

11. Based on the calculations made for the entire aggregate in the RTM, cost indicators are determined in direct costs: in the basic (as of 01.01.2000) price level - Pbaz and in the current price level - Ptek, which are determined by the formula:

Pbaz = OTbaz + EMbaz + Mbaz;

Ptek = OTtek + EMtek + Mtek.

12. The calculation of the current conversion indices for cost items is carried out in the following order:

The size of the recalculation indices for wages of construction workers, assemblers and workers serving construction machines is established according to the formula:

Iot = Ottek / OTbaz;

The size of the index to the cost of operating construction machines and mechanisms is established by the formula:

Iem = EMtek / EMbaz;

The size of the index to the cost of material resources is established by the formula:

Im = Mtek / Mbaz.

13. To determine the index of changes in the cost of construction and installation works as a whole (ISMR), overhead costs (HP) and estimated profit (SP) are taken into account in the base and current price levels.

14. The current index of the change in the cost of construction and installation work (excluding other costs and excluding VAT) for the object as a whole is determined by the formula:

Ismr = SMRtek / SMRbaz,

where: SMRbaz = OTbaz + EMbaz + Mbaz + NRbaz + SPbaz,

SMRtek = Ottek + EMtek + Mtek + NRtek + SPtek.

Section III. The order of consideration and publication of forecast indices

15. The developed forecast indices are submitted by FGU FTSTSS to the Department of Urban Development Regulation of the Ministry of Regional Development of Russia (hereinafter referred to as the Department) no later than 5 (five) days from the beginning of the next quarter with the attachment of the corresponding calculation justifications, endorsed by the responsible executor of FGU FTSTsS.

INTERDEPARTMENTAL COUNCIL
ON PRICE POLICY IN CONSTRUCTION
UNDER THE GOVERNMENT OF MOSCOW


APPROVED
Chairperson
Interdepartmental Council
on pricing policy
in construction at
To the Moscow government
A. L. Voronin
October 4, 2004

PROTOCOL N 1 / MS-15-04
meetings of the Interdepartmental Council on Pricing Policy
in construction under the Government of Moscow

Attended

Members of the Interdepartmental Council and invitees, according to the attached list *.

________________

* The list is not provided. - Note "CODE".

Agenda

7. On the introduction of Addendum No. 20 to MTSN 81-98.



Decision of the Interdepartmental Council on Pricing Policy in Construction under the Government of Moscow

1. Consideration of generalized indexes of changes in the cost of construction and installation works in September 2004 in connection with inflationary processes.

1.1. Agree for analytical support in the implementation of the city investment program 2004 generalized indexes of changes in the cost of construction and installation works in September 2004.

Generalized indices of changes in the cost of construction and installation works for 2004

Date and protocol number

Change indices

January

February

April

August

08/23/2004 N 1 / MS-14-04

September

09/29/2004 N 1 / MS-15-04


The use of generalized indexes of changes in the cost of construction and installation work for payments for the work performed is not allowed.

2. On the approval of the Collection of coefficients for the conversion of the cost of construction, defined in the norms and prices of MTSN 81-98, to the current price level of September 2004.

2.1. To agree on the formation of starting proposals for the level of firm contractual prices for construction products, calculations of generalized inflation rates and mutual settlements for the volume of work performed in construction in the city of Moscow in current prices of September 2004 Collection N 09 / 2004-98 (issue 41) of the conversion factors for the estimated cost of construction and installation work for the city of Moscow defined in the norms and prices of the MLSP 81-98, at the current price level.

3. On consideration of the Collection of prices for the operation of construction machines as of September 2004.

3.1. To form the level of firm contract prices, the cost of operating construction machines in September 2004 shall be determined according to the Collection of Prices for the Operation of Construction Machines (issue 09/2004).

4. On the application of the Compendiums of indicators of the cost of repair and construction works in the current price level of September 2004.

4.1. To agree to determine the cost of repair and construction work on objects of the city order in the current prices of September 2004 Collection of indicators of the cost of repair and construction work in the current price level issue 40/2004 (as a reference material).


5. On the application of the Compendiums of indicators of the estimated cost of construction and installation works in the current price level of September 2004.

5.1. To agree to determine in the current price level of September 2004 the cost of construction and installation work performed when arranging apartments in new buildings, the Collection of indicators of the cost of construction and installation work in the current price level release 31/2004 (as a reference material).

Settlements for the work performed should be carried out at the prices of MTSN 81-98 using the conversion factors to the current price level in the prescribed manner.

6. On the coordination of indices for recalculating the cost of equipment in the current price level of the 4th quarter of 2004 to the base price level of 1998.

6.1. To agree on the indices for recalculating the cost of equipment in the current price level of the 4th quarter of 2004 to the base price level of 1998 (Appendix 1).

7. On the introduction of Supplement No. 20 of MTSN 81-98.

7.1. Introduce the Collection of Supplements No. 20 to the Collection of Moscow Territorial Estimated Standards in the 1998 base price level.

8. On the introduction of Supplement No. 15 to the elementary estimate standards as part of the MTSN 81-98.

8.1. To put into effect the Collection of Supplements No. 15 to the elementary estimate standards as part of the MTSN 81-98.

9. On the approval of the "Collection of basic prices for works and services for data processing and maintenance of a remote sensing data bank on the territory of the city of Moscow".

9.1. To agree on the "Collection of basic prices for works and services for data processing and maintenance of a remote sensing data bank on the territory of the city of Moscow" for putting into effect in accordance with the established procedure.

10.1. To agree to put into effect in the prescribed manner "Recommendations for determining the duration of the survey work for construction in the city of Moscow" MMR-3.2.04.02-04.

11. On the coordination of the tariff for the removal of waste from construction and demolition.

11.1. The Department economic policy development of the city of Moscow, Moskomexpertiza, State Unitary Enterprise PPDC "Informstroyservice" to finalize the calculation of costs (tariff) for issuing and closing permits for the movement of construction and demolition waste in the city of Moscow, taking into account the comments and suggestions made at the Interdepartmental Council, and submit to the next meeting of the Interdepartmental Council on pricing policy in construction under the Moscow Government.

12. Consideration of complex forecast indices for recalculation of the estimated cost of construction of OJSC "MKK-Holding" facilities, determined in 1998 basic prices, into the December 2004 price level.

12.1. Recommend for the formation of starting prices when conducting contract bidding and setting limits capital investments for 2005 complex forecast indices for recalculation of the estimated cost of the objects of OJSC "MKK-Holding".

Types of construction objects

Conversion indices
December 2003 to 1998

Forecast conversion indices
December 2004 to 1998

Mining and capital works on the objects of the main production of quarries for the extraction of blocks of natural stone and nonmetallic materials

Objects of the main production of quarries for the extraction of stone processing plants and crushing and sorting plants

12.2. Include the complex forecast indices recommended for use in clause 12.1 of this protocol in the appendix to the minutes of the meeting of the Interdepartmental Council on Pricing Policy in Construction dated May 21, 2004 N 1 / МС-11-04 "Complex indices for recalculating the estimated cost of construction determined in basic prices 1998 to the price level of December 2004 to determine capital investments for 2005 ".

13. About regulatory levels wages by branches of the building materials industry and the construction industry for the IV quarter of 2004 to be taken into account when agreeing the selling prices for products supplied to the objects of the city order.

13.1. To establish for the IV quarter of 2004 the following standard levels of wages by industry to be taken into account when agreeing the selling prices for the products of the building materials industry and the construction industry supplied for urban construction, by industry:

Precast concrete products

Commercial concretes and solutions

Woodworking products

Nonmetallic materials

Products from synthetic materials

Ceramic products

Mechanical engineering products

Asphalt concrete mixtures

Automobile transportation

14. On the coordination of the coefficients for the conversion of the cost of construction and installation work to the current price level from September 2002 to unit rates for the installation of monolithic reinforced concrete structures of the section of the 3rd transport ring, made by JSC "Mosstroytseny" in accordance with the instruction of the Interdepartmental Council for Pricing Policy in Construction under the Government of Moscow dated December 23, N 1 / МС.

14.1. To agree on the coefficients for the conversion of the cost of construction and installation work to the current price level from September 2002 to the unit prices for the installation of monolithic reinforced concrete structures of the section of the 3rd transport ring, developed on the basis of working documentation and the project for the production of works submitted by NPO "Kosmos", executed by JSC "Mosstroytseny" on behalf of the Interdepartmental Council on Pricing Policy in Construction under the Government of Moscow dated December 23, N 1 / МС.

15. About the development of the "Procedure for determining the estimated cost when linking standard projects for construction in the city of Moscow at the expense of the city budget ".

15.1. Instruct OJSC "Mosproekt", OJSC "TsNIIEP of residential and public buildings", GUP "MNIIITEP" to develop the "Procedure for determining the estimated cost when linking standard projects for construction in the city of Moscow at the expense of the city budget" and submit it to the Interdepartmental Council on Pricing Policy in Construction under the Government of Moscow in December 2004.

Vice-chairman
The Interdepartmental Council for
pricing policy in construction
under the Government of Moscow
A. A. Shanin

Appendix 1. Indices of changes in the cost of equipment in the current price level of the IV quarter of 2004 to the base price level of 1998

Annex 1
to the minutes of the meeting
Interdepartmental Council
dated September 29, 2004 N 1-МС-15-04

Economy as a whole (other sectors of the economy: administrative buildings, military registration and enlistment offices, checkpoints, etc.)

Power engineering

Refining industry

Building materials industry

Light industry

Food industry

Agriculture

Transport

Construction

Trade and catering

Residential construction (including intra-quarter transformer substations, heat points, etc.)

Non-production sphere (culture, education, health care, physical education), communal facilities (including incinerators and waste processing plants)

Consumer services for the population

A selection of letters from the Ministry of Construction, Housing and Utilities of the Russian Federation on the recommended value of the forecast quarterly indices of changes in the estimated cost of construction, including the value of the forecast indices:

  • Construction and assembly and commissioning works on construction projects to FER and TEP;
  • Other work and costs;
  • Equipment.

Forecast indexes of the Ministry of Construction for the 1st quarter of 2020

Additional - Letter of the Ministry of Construction of Russia dated February 25, 2020 No. 6369-IF / 09 "On the recommended value of indices of changes in the estimated cost of construction in the first quarter of 2020, including the value of indices of changes in the estimated cost of construction and installation works, indices of changes in the estimated cost of commissioning works, indices of changes in the estimated cost of other work and costs, indices of changes in the estimated cost of equipment. "

Notes:






5. Districts Leshukonsky, Mezensky, Pinezhsky and the city of Severodvinsk with the territory subordinated to the Severodvinsky City Council of People's Deputies;

    • Moscow, Vladimirskaya;
    • Belgorod, Ivanovo, Kostroma, Kursk, Ryazan, Tverskaya.
    • Komi (1, 2, 3, 4, 5 zones), Novgorod;
    • Arkhangelsk (base area), Arkhangelsk (extreme north), Arkhangelsk (Arctic Ocean and its seas), Vologda, Leningrad, Pskov.
  • Southern federal district:
    • Astrakhan, Volgograd;
    • Adygea, Crimea.
    • Karachay-Cherkesskaya;
    • Ingushetia, Kabardino-Balkar, Karachay-Cherkess, North Ossetia - Alania.
    • Tatarstan, Chuvash, Orenburg, Ulyanovsk;
    • Bashkortostan, Mordovia, Sarov Perm, Samara.
    • Chelyabinsk.
  • Siberian Federal District:
    • Irkutsk; Kemerovo - Kuzbass;
    • Khakassia, Altai, Novosibirsk, Omsk.
    • Zabaikalsky, Chukotsky;
    • Kamchatsky.
Construction and installation works, determined using the Industry estimate and regulatory framework;
New - Construction and installation works at facilities and facilities for the transportation of oil and oil products;
Other work and costs;
Equipment .

Forecast indexes of the Ministry of Construction for the 4th quarter of 2019

Additional - Letter of the Ministry of Construction of Russia dated February 19, 2020 No. 5412-IF / 09 "On the recommended value of the indices for changes in the estimated cost of construction and installation works in the IV quarter of 2019".

Additional - Letter of the Ministry of Construction of Russia dated January 30, 2020 No. 2538-IF / 09 "On the recommended value of the indices for changes in the estimated cost of construction in the IV quarter of 2019."

Additional - Letter of the Ministry of Construction of Russia dated December 31, 2019 No. 51579-DV / 09 "On the recommended value of indices of changes in the estimated cost of construction in the IV quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, indices of changes in the estimated cost of works ".

Additional - Letter of the Ministry of Construction of Russia dated December 25, 2019 No. 50583-DV / 09 "On the recommended value of indices of changes in the estimated cost of construction in the IV quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, indices of changes in the estimated cost of commissioning works, indices of changes in the estimated cost of other work and costs, indices of changes in the estimated cost of equipment. "

Construction, installation and commissioning works on construction objects to FER and TEP

Notes:
1. To take into account the increased rate of overhead costs, the following coefficients should be applied to the forecast indices of changes in the cost of construction and installation work and commissioning:
- for the regions of the Far North - 1.02 (to the indices to the FER), 1.005 (to the forecast indices to the TEP);
- for areas equated to the regions of the Far North - 1.01 (to the indexes to the FER), 1.003 (to the forecast indexes to the TEP);
2. Indices for construction and installation work and commissioning are applied to the baseline cost of work, taking into account direct costs, overhead costs and estimated profit;
3. Indices are applicable only to the specified price zone;
4. Indices "Railway electrification", " Railways"are indicated only to the FER-2001 estimate and normative base;

  • Central Federal District:
    • Belgorodskaya, Vladimirskaya, Ivanovskaya, Kaluzhskaya (addition), Kurskaya, Ryazanskaya (addition), Tambovskaya, Tverskaya (addition), Tulskaya (addition), Yaroslavskaya (addition).
    • Moscow, Bryansk, Oryol, Smolensk, Tula, Yaroslavl.
    • Moscow, Belgorod, Bryansk, Voronezh, Kaluga, Kostroma, Kursk, Lipetsk, Ryazan, Smolensk, Tverskaya.
  • Northwestern Federal District:
    • Karelia (addition), Vologda (addition), Novgorod (addition).
    • Karelia, Arkhangelsk (base region), Arkhangelsk (extreme north), Arkhangelsk (Arctic Ocean and its seas), Nenets, Vologda, Murmansk, Novgorod, Pskov.
    • St. Petersburg, Komi (1, 2, 3, 4, 5 zones), Kaliningrad, Leningrad.
  • Southern Federal District:
    • Astrakhanskaya (addition), Krasnodar, Rostov (addition), Crimea (addition), Sevastopol (addition).
    • Adygea (addition), Astrakhan, Volgograd, Rostov, Crimea, Sevastopol.
    • Adygea, Kalmykia.
  • North Caucasian Federal District:
    • Ingushetia, North Ossetia - Alania, Stavropol (addition).
    • Karachay-Cherkess, Chechen.
    • Dagestan (zone 1), Kabardino-Balkarian, Stavropol.
  • Volga Federal District:
    • Bashkortostan (addition), Mordovia (addition), Tatarstan (addition), Chuvashskaya (addition), Kirovskaya (addition), Nizhegorodskaya (addition), Penza (addition), Perm (addition), Ulyanovskaya.
    • Mordovia, Tatarstan, Udmurt, Kirov, Nizhny Novgorod, Perm, Samara, Saratov.
    • Bashkortostan, Mari El, Udmurt, Chuvash, Sarov (Nizhny Novgorod), Orenburg, Penza, Samara, Saratov.
  • Ural federal district:
    • Kurgan (addition), Sverdlovsk, Tyumen (addition), Chelyabinsk (addition), Khanty-Mansiysk (Yugra) (addition).
    • Kurgan, Tyumen.
    • Chelyabinsk, Khanty-Mansi (Ugra), Yamalo-Nenets.
    • Khakassia, Krasnoyarsk.
    • Altai (addition), Tyva, Kemerovo - Kuzbass, Novosibirsk, Omsk.
    • Altai, Altai (addition), Novosibirsk.
    • Khakassia, Altai, Krasnoyarsk (zone 1), Irkutsk, Tomsk.
  • Far Eastern Federal District:
    • Buryatia, Sakha (zone 1 - Yakutsk, zone 2 - Neryungri, zone 3 - Nyurba, zone 4 - Lensk, zone 5 - Khandyga, zone 6 - Nera), Zabaikalsky (addition), Primorsky (addition), Khabarovskaya, Amurskaya, Magadansky , Jewish.
    • Primorsky, Amurskaya, Chukotsky.
    • Zabaikalsky, Kamchatsky, Sakhalin.
PIR - Design and exploration work;
Construction and installation works, determined using the Industry estimate and regulatory framework;
New - Construction and installation works at facilities and facilities for the transportation of oil and oil products;
Other work and costs;
Equipment.

Forecast indexes of the Ministry of Construction for the 3rd quarter of 2019

Additional - Letter of the Ministry of Construction of Russia dated October 25, 2019 No. 40405-DV / 09 "On the recommended value of the indices of changes in the estimated cost of construction in the third quarter of 2019, including the value of the indices of changes in the estimated cost of construction and installation works, works ".

Additional - Letter of the Ministry of Construction of Russia dated October 16, 2019 No. 38958-DV / 09 "On the recommended value of indices of changes in the estimated cost of construction in the third quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, works ".

Additional - Letter of the Ministry of Construction of Russia dated October 9, 2019 No. 38021-YUG / 09 "On the recommended value of the indices of changes in the estimated cost of construction in the third quarter of 2019, including the value of the indices of changes in the estimated cost of construction and installation works, works, indices of changes in the estimated cost of design and survey work ".

Additional - Letter of the Ministry of Construction of Russia dated October 4, 2019 No. 37341-DV / 09 "On the recommended value of the indices for the change in the estimated cost of construction in the third quarter of 2019, including the value of the indices for the change in the estimated cost of construction and installation works, works, indices of changes in the estimated cost of design and survey work ".

Construction, installation and commissioning works on construction objects to FER and TEP

Notes:
1. To take into account the increased rate of overhead costs, the following coefficients should be applied to the forecast indices of changes in the cost of construction and installation work and commissioning:

- for areas equated to the regions of the Far North - 1.01 (to forecast indices and FER), 1.003 (to forecast indices to TEP);
2. Indices for construction and installation work and commissioning are applied to the baseline cost of work, taking into account direct costs, overhead costs and estimated profit;
3. Indices are applicable only to the specified price zone;
4. The indices "Road transport", "Electrification of railways", "Railways" are indicated only to the estimated normative base FER-2001;

  • Central Federal District:
    • Moscow, Voronezh, Kostroma, Kursk, Tverskaya, Tula;
    • Bryansk, Vladimir, Lipetsk, Smolensk;
    • Vladimirskaya, Ivanovskaya. Kaluga, Ryazan, Tula;
    • Voronezh, Kostroma, Kursk, Tverskaya, Tula;
  • Northwestern Federal District:
    • Karelia, Leningradskaya;
    • Arkhangelsk (base region), Arkhangelsk (extreme north), Arkhangelsk (Arctic Ocean and its seas), Nenets, Vologodskaya, St. Petersburg;
    • Komi (1, 2, 3, 4, 5 zones), Kaliningrad. Murmansk, Novgorod;
    • Vologda, Novgorod, Pskov;
  • Southern Federal District:
    • Sevastopol;
    • Krasnodar, Rostov;
    • Adygea, Astrakhan, Volgograd, Kalmykia, Crimea;
    • Rostov, Crimea;
  • North Caucasian Federal District:
    • Chechnya;
    • Dagestan (zone 1), Kabardino-Balkarian, Karachay-Cherkess, North Ossetia-Alania;
    • Ingushetia, Stavropol;
  • Volga Federal District:
    • Bashkortostan, Udmurt, Sarov (Nizhny Novgorod);
    • Mari El, Tatarstan, Perm, Samara;
    • Chuvash, Kirov, Nizhny Novgorod, Penza, Saratov, Ulyanovsk;
    • Bashkortostan, Mordovia, Chuvash, Nizhny Novgorod, Orenburg, Perm;
  • Siberian Federal District:
    • Kuzbass, Kemerovo;
    • Altai, Novosibirsk region (1 zone);
    • Khakassia, Krasnoyarsk (zone 1), Irkutsk, Omsk;
    • Altai, Tyva, Novosibirsk, Tomsk;
  • Ural federal district:
    • Yamalo-Nenets;
    • Sverdlovsk, Chelyabinsk;
    • Sverdlovsk, Kurgan, Tyumen, Chelyabinsk, Khanty-Mansi (Ugra);
  • Far Eastern Federal District:
    • Buryatia;
    • Amurskaya, Sakhalin;
    • Sakha (zone 1, Yakutsk), Primorskiy, Khabarovskiy, Kamchatskiy, Magadanskaya, Chukotskiy;
    • Sakha (zone 3, Nyurba), Primorsky, Zabaikalsky;
  • Construction and installation works, determined using the Industry estimate and regulatory framework;
    PIR - Design and survey work;
    Other work and costs;
    Equipment.

Forecast indexes of the Ministry of Construction for the 2nd quarter of 2019

Additional - Letter of the Ministry of Construction of Russia dated July 26, 2019 No. 27105-DV / 09 “On the recommended value of the forecast indices of changes in the estimated cost of construction in the II quarter of 2019, including the value of the forecast indices of changes in the estimated cost of construction and installation works, forecast indices of change estimated cost of commissioning ".

Additional - Letter of the Ministry of Construction of Russia dated June 5, 2019 No. 20289-DV / 09 “On the recommended value of the forecast indices of changes in the estimated cost of construction in the II quarter of 2019, including the value of the forecast indices of changes in the estimated cost of construction and installation works, forecast indices of change estimated cost of commissioning ".

Additional - Letter of the Ministry of Construction of Russia dated June 4, 2019 No. 20003-DV / 09 "On the recommended value of the forecast indices of changes in the estimated cost of construction in the II quarter of 2019, including the value of the forecast indices of changes in the estimated cost of construction and installation works, forecast indices of change the estimated cost of commissioning, forecast indices of changes in the estimated cost of other works and costs, as well as the value of the forecast indices of changes in the estimated cost of equipment. "

Additional - Letter of the Ministry of Construction of Russia dated May 17, 2019 No. 17798-DV / 09 "On the recommended value of forecast indices for changes in the estimated cost of construction and installation works, forecast indices for changes in the estimated cost of commissioning, forecast indices for changes in the estimated cost of design and survey work."

Construction, installation and commissioning works on construction objects to FER and TEP

Notes:
1. To take into account the increased rate of overhead costs, the following coefficients should be applied to the forecast indices of changes in the cost of construction and installation work and commissioning:
- for the regions of the Far North - 1.02 (to the forecast indices to the FER), 1.005 (to the forecast indices to the TEP);
- for areas equated to the regions of the Far North - 1.01 (to the forecast indices and FER), 1.003 (to the forecast indices to the TEP).


4. Forecast indices "Automobile transportation", "Electrification of railways", "Railways" are indicated only to the estimated normative base FER-2001.

6. Areas of the islands of the Arctic Ocean and its seas (except for the islands of the White Sea).

  • Central Federal District:
    • Kaluga;
    • Moscow, Tambov;
    • Moscow, Belgorodskaya, Bryanskaya, Voronezhskaya, Ivanovskaya, Kostromskaya, Lipetskaya, Orlovskaya, Ryazanskaya, Tverskaya;
    • Vladimirskaya, Kurskaya, Smolenskaya, Tula, Yaroslavl.
  • Northwestern Federal District:
    • Leningradskaya;
    • Vologda, Kaliningrad;
    • Karelia, Komi (1, 2, 3, 4, 5 zones);
    • St. Petersburg, Arkhangelskaya (base region, the Far North, islands of the Arctic Ocean and its seas), Nenets, Murmansk, Novgorod, Pskov.
  • Southern Federal District:
    • Adygea, Crimea;
    • Kalmykia;
    • Sevastopol;
    • Volgograd, Krasnodar, Rostov;
    • Astrakhan.
  • North Caucasian Federal District:
    • Dagestan (zone 1), Ingushetia, Chechen;
    • Kabardino-Balkarian, Karachay-Cherkess, North Ossetia - Alania, Stavropol.
  • Volga Federal District:
    • Penza;
    • Mordovia;
    • Bashkortostan, Mari El, Udmurt, Chuvash, Saratov;
    • Tatarstan, Kirovskaya, Nizhegorodskaya, Sarov, Orenburgskaya, Perm Krai, Samaraskaya, Ulyanovskaya.
  • Ural federal district:
    • Kurgan;
  • Siberian Federal District:
    • Altai Republic, Krasnoyarsk (zone 1);
    • Tomsk;
    • Novosibirsk (zone 1);
    • Tuva, Altai;
    • Khakassia, Irkutsk, Kemerovo;
  • Far Eastern Federal District:
    • Buryatia, Sakhalin;
    • Zabaikalsky;
    • Primorsky, Amur (1 zone), Kamchatsky, Magadan, Jewish autonomous;
    • Sakha (Yakutia), Khabarovsk.
PIR - Design and survey work;
Other work and costs;
Equipment .

Forecast indexes of the Ministry of Construction for the 1st quarter of 2019

Simultaneously reported that the Indices for the Republic of Tyva and the Republic of Buryatia have not been published due to the failure to submit reporting data for the IV quarter of 2018.

Additional - Letter of the Ministry of Construction of Russia dated March 5, 2019 No. 7581-DV / 09 "On the recommended value of the forecast indices of changes in the estimated cost of construction in the first quarter of 2019, including the value of the forecast indices of changes in the estimated cost of construction and installation works, forecast indices of change estimated cost of commissioning works, forecast indices of changes in the estimated cost of design and survey work. "

Construction, installation and commissioning works on construction objects to FER and TEP

Notes:
1. To take into account the increased rate of overhead costs, the following coefficients should be applied to the forecast indices of changes in the cost of construction and installation works and commissioning:

2. Forecast indices for construction, installation and commissioning are applied to the baseline cost of work, taking into account direct costs, overhead costs and estimated profit.
3. Forecast indices are applicable only to the specified price zone.
5. Districts Leshukonsky, Mezensky, Pinezhsky and the city of Severodvinsk with the territory subordinate to the Severodvinsky City Council of People's Deputies.
6. Areas of the islands of the Arctic Ocean and its seas (except for the islands of the White Sea).

  • Central Federal District:
    • Bryansk, Kostroma, Kursk, Lipetsk, Ryazan, Tambov, Tverskaya, Tula;
    • Moscow, Moscow, Belgorod, Vladimir, Voronezh, Ivanovsk, Kaluga, Oryol, Smolensk, Yaroslavl.
  • Northwestern Federal District:
    • St. Petersburg, Karelia, Komi (1, 2, 3, 4, 5 zones), Arkhangelskaya (base region, the Far North, islands of the Arctic Ocean and its seas), Nenetsky, Vologda, Kaliningrad, Novgorod;
    • Leningrad, Murmansk, Pskov.
  • Southern Federal District:
    • Astrakhan, Kalmykia, Rostov;
    • Adygea, Volgograd, Krasnodar, Crimea, Sevastopol.
  • North Caucasian Federal District:
    • Ingushetia, Kabardino-Balkar, Karachay-Cherkess, North Ossetia - Alania, Chechen, Stavropol;
    • Dagestan (zone 1).
  • Volga Federal District:
    • Bashkortostan, Mordovia, Tatarstan, Udmurt, Chuvash, Kirov, Sarov, Orenburg, Penza, Perm Territories, Saratov, Samara, Ulyanovsk;
    • Mari El, Nizhny Novgorod, Samara.
  • Ural federal district:
    • Sverdlovsk, Tyumen (zone 1), Chelyabinsk, Khanty-Mansi - Yugra, Yamalo-Nenets;
    • Kurgan.
  • Siberian Federal District:
    • Khakassia, Krasnoyarsk (zone 1), Irkutsk, Kemerovo, Novosibirsk (zone 1);
    • Altai, Altai, Omsk, Tomsk.
  • Far Eastern Federal District:
    • Khabarovsk, Kamchatskiy, Sakhalinskaya, Chukotskiy;
    • Sakha (Yakutia), Zabaikalsky, Primorsky, Amur (zone 1), Magadan, Jewish Autonomous.
Construction and installation works, determined using the Industry estimate and regulatory framework;
PIR - Design and survey work;
Other work and costs;
Equipment .

If there are no corresponding Indices for individual constituent entities of the Russian Federation in the quarterly letters of the Ministry of Construction of Russia, as well as Indices for design and survey work, the Indices for the previous quarter are applied.

LETTER of December 25, 2017 N 58300-OG / 09 "On the quarterly letters of the Ministry of Construction of Russia containing estimated standards and forecast indices of changes in the estimated cost ".


Legal basis

Forecast indices are developed in accordance with the provisions Methodical recommendations on the development of indices of changes in the estimated cost of construction, approved by order of the Ministry of Construction of Russia dated February 9, 2017 No. 84 / pr, using data from the Federal autonomous institution"Main Department of State Expertise", executive authorities of the constituent entities of the Russian Federation, taking into account the forecast inflation rate established by the Ministry of Economic Development of the Russian Federation.

  • Order of the Ministry of Construction of Russia dated 09.02.2017 No. 84 / pr
    "On the approval of Methodological recommendations for the development of indices of changes in the estimated cost of construction"
  • Methodological recommendations for the development of indices of changes in the estimated cost of construction

Appointment

Indices are intended for general economic calculations in the investment sphere for capital construction projects, financing of which is carried out with the involvement of the federal budget and for the formation of the initial (maximum) bidding price when preparing tender documentation.

The history of development

Indexes of the Ministry of Construction for the 4th quarter of 2019. Appendix 2

An additional letter of the Ministry of Construction of Russia dated December 31, 2019 No. 51579-DV / 09 "On the recommended value of the indices of changes in the estimated cost of construction in the IV quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, works ".

Indices of changes in the estimated cost:

  • Appendix # 1 - Construction, installation and commissioning works on construction objects to FER and TEP;
  • Appendix # 2 -
  • Appendix No. 3 - Construction and installation work at the facilities of the main pipeline transportation of oil and oil products (linear part, tank farms) and structures involved in the technological process of transporting oil and oil products (site facilities) on the territory of the constituent entities of the Russian Federation.
    Download the letter with the Indexes of the Ministry of Construction No. 51579-DV / 09 dated December 31, 2019.
At the same time, it is reported that the Indices for the constituent entities of the Russian Federation, which are absent in Appendix No. 1 to the letters of the Ministry of Construction of Russia, will be announced additionally.

Indexes of the Ministry of Construction for the 4th quarter of 2019. Appendix 1

An additional letter of the Ministry of Construction of Russia dated December 25, 2019 No. 50583-DV / 09 "On the recommended value of indices of changes in the estimated cost of construction in the IV quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, works, indices of changes in the estimated cost of other work and costs, indices of changes in the estimated cost of equipment. "

The forecast indices indicated in the annexes of the letter were developed for the 2001 estimate and regulatory base in accordance with the provisions of the Methodology for calculating indices of changes in the estimated cost of construction, approved by order of the Ministry of Construction of Russia dated June 5, 2019 No. 326 / pr, using data from the FAU "Glavgosexpertiza of Russia" , executive authorities of the constituent entities of the Russian Federation for the III quarter of 2019, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.

  • Construction and installation works determined using the Industry estimate and regulatory framework;

Sp-force-hide (display: none;). Sp-form (display: block; background: #ffffff; padding: 10px; width: 590px; max-width: 100%; border-radius: 11px; -moz-border -radius: 11px; -webkit-border-radius: 11px; font-family: Arial, "Helvetica Neue", sans-serif; background-repeat: no-repeat; background-position: center; background-size: auto;) .sp-form input (display: inline-block; opacity: 1; visibility: visible;). sp-form .sp-form-fields-wrapper (margin: 0 auto; width: 570px;). sp-form .sp -form-control (background: #ffffff; border-color: #cccccc; border-style: solid; border-width: 1px; font-size: 15px; padding-left: 8.75px; padding-right: 8.75px; border -radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; height: 35px; width: 100%;). sp-form .sp-field label (color: # 444444; font- size: 13px; font-style: normal; font-weight: bold;). sp-form .sp-button (border-radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; background-color: # 004b88; color: #ffffff; width: auto; font- weight: 700; font-style: normal; font-family: Arial, sans-serif; box-shadow: none; -moz-box-shadow: none; -webkit-box-shadow: none;). sp-form .sp-button-container (text-align: left;)

By subscribing you confirm your consent to the processing of personal data.


Indexes of the Ministry of Construction for the 4th quarter of 2019

The Letter of the Ministry of Construction of Russia dated December 9, 2019 No. 46999-DV / 09 "On the recommended value of the indices of changes in the estimated cost of construction in the IV quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, indices of changes in the estimated cost of commissioning works was published. , indices of changes in the estimated cost of design and survey work ".

The forecast indices indicated in the annexes of the letter were developed for the 2001 estimate and regulatory base in accordance with the provisions of the Methodology for calculating indices of changes in the estimated cost of construction, approved by order of the Ministry of Construction of Russia dated June 5, 2019 No. 326 / pr, using data from the FAU "Glavgosexpertiza of Russia" , executive authorities of the constituent entities of the Russian Federation for the III quarter of 2019, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.

At the same time, it is reported that the Indices for the subjects of the Russian Federation that are absent in the Appendix to the letter, as well as the Indices for equipment, for other works and costs will be announced additionally.

Expected in an additional letter:

  • Construction and installation works determined using the Industry estimate and regulatory framework;
  • Other work and costs;
  • Equipment.

Sp-force-hide (display: none;). Sp-form (display: block; background: #ffffff; padding: 10px; width: 590px; max-width: 100%; border-radius: 11px; -moz-border -radius: 11px; -webkit-border-radius: 11px; font-family: Arial, "Helvetica Neue", sans-serif; background-repeat: no-repeat; background-position: center; background-size: auto;) .sp-form input (display: inline-block; opacity: 1; visibility: visible;). sp-form .sp-form-fields-wrapper (margin: 0 auto; width: 570px;). sp-form .sp -form-control (background: #ffffff; border-color: #cccccc; border-style: solid; border-width: 1px; font-size: 15px; padding-left: 8.75px; padding-right: 8.75px; border -radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; height: 35px; width: 100%;). sp-form .sp-field label (color: # 444444; font- size: 13px; font-style: normal; font-weight: bold;). sp-form .sp-button (border-radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; background-color: # 004b88; color: #ffffff; width: auto; font- weight: 700; font-style: normal; font-family: Arial, sans-serif; box-shadow: none; -moz-box-shadow: none; -webkit-box-shadow: none;). sp-form .sp-button-container (text-align: left;)

By subscribing you confirm your consent to the processing of personal data.


Indexes of the Ministry of Construction for the 3rd quarter of 2019. Appendix 4

The Letter of the Ministry of Construction of Russia dated October 25, 2019 No. 40405-DV / 09 "On the recommended value of the indices of changes in the estimated cost of construction in the third quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, indices of changes in the estimated cost of commissioning works was published. ".



Indexes of the Ministry of Construction for the 3rd quarter of 2019. Appendix 3

Published the Letter of the Ministry of Construction of Russia dated October 16, 2019 No. 38958-DV / 09 "On the recommended value of the indices of changes in the estimated cost of construction in the third quarter of 2019, including the value of the indices of changes in the estimated cost of construction and installation works, indices of changes in the estimated cost of commissioning works ".

These Indices were developed for the 2001 budget and regulatory base in accordance with the provisions of the Guidelines for the development of indices of changes in the estimated cost of construction, approved by order of the Ministry of Construction of Russia dated February 9, 2017 No. 84 / authorities of the constituent entities of the Russian Federation for the III quarter of 2019, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.



Indexes of the Ministry of Construction for the 3rd quarter of 2019. Appendix 2

Published the Letter of the Ministry of Construction of Russia dated October 9, 2019 No. 38021-YUG / 09 "On the recommended value of indices of changes in the estimated cost of construction in the third quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, indices of changes in the estimated cost of commissioning works , indices of changes in the estimated cost of other work and costs, indices of changes in the estimated cost of equipment. "

These Indices were developed for the 2001 budget and regulatory base in accordance with the provisions of the Guidelines for the development of indices of changes in the estimated cost of construction, approved by order of the Ministry of Construction of Russia dated February 9, 2017 No. 84 / authorities of the constituent entities of the Russian Federation for the II quarter of 2019, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.



Indexes of the Ministry of Construction for the 3rd quarter of 2019. Appendix 1

The Letter of the Ministry of Construction of Russia dated October 4, 2019 No. 37341-DV / 09 "On the recommended value of the indices of changes in the estimated cost of construction in the third quarter of 2019, including the value of indices of changes in the estimated cost of construction and installation works, indices of changes in the estimated cost of commissioning works , indices of changes in the estimated cost of design and survey work ".

These Indices were developed for the 2001 budget and regulatory base in accordance with the provisions of the Guidelines for the development of indices of changes in the estimated cost of construction, approved by order of the Ministry of Construction of Russia dated February 9, 2017 No. 84 / authorities of the constituent entities of the Russian Federation for the III quarter of 2019, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.



Indexes of the Ministry of Construction for the 3rd quarter of 2019

The Letter of the Ministry of Construction of Russia dated August 28, 2019 No. 31427-DV / 09 "On the recommended value of the forecast indices of changes in the estimated cost of construction in the third quarter of 2019, including the value of the forecast indices of changes in the estimated cost of construction and installation works, forecast cost of commissioning "

The forecast indices indicated in the annexes of the letter were developed for the 2001 budget and regulatory base in accordance with the provisions of the Guidelines for the development of indices of changes in the estimated construction cost approved by order of the Ministry of Construction of Russia dated February 9, 2017 No. 84 / pr, using data from the FAU Glavgosexpertiza Russia ", the executive authorities of the constituent entities of the Russian Federation for the II quarter of 2019, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.

At the same time, it is reported that the Indices for the subjects of the Russian Federation that are absent in the Appendix to the letter, as well as the Indices for design and survey work, for equipment, for other work and costs will be announced additionally.

Expected in an additional letter:

  • Construction and installation works determined using the Industry estimate and regulatory framework;
  • PIR - Design and survey work;
  • Other work and costs;
  • Equipment.

Sp-force-hide (display: none;). Sp-form (display: block; background: #ffffff; padding: 10px; width: 590px; max-width: 100%; border-radius: 11px; -moz-border -radius: 11px; -webkit-border-radius: 11px; font-family: Arial, "Helvetica Neue", sans-serif; background-repeat: no-repeat; background-position: center; background-size: auto;) .sp-form input (display: inline-block; opacity: 1; visibility: visible;). sp-form .sp-form-fields-wrapper (margin: 0 auto; width: 570px;). sp-form .sp -form-control (background: #ffffff; border-color: #cccccc; border-style: solid; border-width: 1px; font-size: 15px; padding-left: 8.75px; padding-right: 8.75px; border -radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; height: 35px; width: 100%;). sp-form .sp-field label (color: # 444444; font- size: 13px; font-style: normal; font-weight: bold;). sp-form .sp-button (border-radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; background-color: # 004b88; color: #ffffff; width: auto; font- weight: 700; font-style: normal; font-family: Arial, sans-serif; box-shadow: none; -moz-box-shadow: none; -webkit-box-shadow: none;). sp-form .sp-button-container (text-align: left;)

The Letter of the Ministry of Construction of Russia dated April 10, 2019 No. 12661-DV / 09 "On the recommended value of the forecast indices of changes in the estimated cost of construction in the II quarter of 2019, including the value of the forecast indices of changes in the estimated cost of construction and installation works, forecast cost of commissioning "

The forecast indices indicated in the annexes of the letter were developed for the 2001 budget and regulatory base in accordance with the provisions of the Guidelines for the development of indices of changes in the estimated construction cost, approved by order of the Ministry of Construction of Russia dated February 9, 2017 No. 84 / pr, using data from the FAU Glavgosexpertiza Russia ", the executive authorities of the constituent entities of the Russian Federation for the first quarter of 2019, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.

Notes:
1. To take into account the increased rate of overhead costs, the following coefficients should be applied to the forecast indices of changes in the cost of construction and installation work and commissioning:
- for the regions of the Far North - 1.02 (to the forecast indices to the FER), 1.005 (to the forecast indices to the TEP);
- for areas equated to the regions of the Far North - 1.01 (to forecast indices for FER), 1.003 (to forecast indices for TEP).
2. Forecast indices for construction, installation and commissioning are applied to the baseline cost of work, taking into account direct costs, overhead costs and estimated profit.
3. Forecast indices are applicable only to the specified price zone.
4. Forecast indices "Automobile transportation", "Electrification of railways", "Railways" are indicated only to the estimated normative base FER-2001.
5. Districts Leshukonsky, Mezensky, Pinezhsky and the city of Severodvinsk with the territory subordinate to the Severodvinsky City Council of People's Deputies.
6. Areas of the islands of the Arctic Ocean and its seas (except for the islands of the White Sea).

Expected in an additional letter:

  • Construction and installation works determined using the Industry estimate and regulatory framework;
  • PIR - Design and survey work;
  • Other work and costs;
  • Equipment.

Sp-force-hide (display: none;). Sp-form (display: block; background: #ffffff; padding: 10px; width: 590px; max-width: 100%; border-radius: 11px; -moz-border -radius: 11px; -webkit-border-radius: 11px; font-family: Arial, "Helvetica Neue", sans-serif; background-repeat: no-repeat; background-position: center; background-size: auto;) .sp-form input (display: inline-block; opacity: 1; visibility: visible;). sp-form .sp-form-fields-wrapper (margin: 0 auto; width: 570px;). sp-form .sp -form-control (background: #ffffff; border-color: #cccccc; border-style: solid; border-width: 1px; font-size: 15px; padding-left: 8.75px; padding-right: 8.75px; border -radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; height: 35px; width: 100%;). sp-form .sp-field label (color: # 444444; font- size: 13px; font-style: normal; font-weight: bold;). sp-form .sp-button (border-radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; background-color: # 004b88; color: #ffffff; width: auto; font- weight: 700; font-style: normal; font-family: Arial, sans-serif; box-shadow: none; -moz-box-shadow: none; -webkit-box-shadow: none;). sp-form .sp-button-container (text-align: left;)

An additional Letter of the Ministry of Construction of Russia dated March 5, 2019 No. 7581-DV / 09 "On the recommended value of the forecast indices of changes in the estimated cost of construction in the first quarter of 2019, including the value of the forecast indices of changes in the estimated cost of construction and installation works, forecast indices of change estimated cost of commissioning, forecast indices of changes in the estimated cost of design and survey work. "

The Letter of the Ministry of Construction of Russia dated December 21, 2018 No. 51276-DV / 09 "On the recommended value of the forecast indices of changes in the estimated cost of construction in the IV quarter of 2018, including the value of the forecast indices of changes in the estimated the cost of commissioning ".

The forecast indices indicated in the annexes of the letter were developed for the 2001 budget and regulatory base in accordance with the provisions of the Guidelines for the development of indices of changes in the estimated construction cost approved by order of the Ministry of Construction of Russia dated February 9, 2017 No. 84 / pr, using data from the FAU Glavgosexpertiza Russia ", executive authorities of the constituent entities of the Russian Federation for the IV quarter of 2018, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.

The forecast indices indicated in the annexes of the letter were developed for the 2001 budget and regulatory base in accordance with the provisions of the Guidelines for the development of indices of changes in the estimated construction cost approved by order of the Ministry of Construction of Russia dated February 9, 2017 No. 84 / pr, using data from the FAU Glavgosexpertiza Russia ", executive authorities of the constituent entities of the Russian Federation for the IV quarter of 2018, taking into account the forecast inflation rate established by the Ministry of Economic Development of Russia.

Expected in an additional letter:

  • Construction and installation works determined using the Industry estimate and regulatory framework;
  • PIR - Design and survey work;

Sp-force-hide (display: none;). Sp-form (display: block; background: #ffffff; padding: 10px; width: 590px; max-width: 100%; border-radius: 11px; -moz-border -radius: 11px; -webkit-border-radius: 11px; font-family: Arial, "Helvetica Neue", sans-serif; background-repeat: no-repeat; background-position: center; background-size: auto;) .sp-form input (display: inline-block; opacity: 1; visibility: visible;). sp-form .sp-form-fields-wrapper (margin: 0 auto; width: 570px;). sp-form .sp -form-control (background: #ffffff; border-color: #cccccc; border-style: solid; border-width: 1px; font-size: 15px; padding-left: 8.75px; padding-right: 8.75px; border -radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; height: 35px; width: 100%;). sp-form .sp-field label (color: # 444444; font- size: 13px; font-style: normal; font-weight: bold;). sp-form .sp-button (border-radius: 4px; -moz-border-radius: 4px; -webkit-border-radius: 4px; background-color: # 004b88; color: #ffffff; width: auto; font- weight: 700; font-style: normal; font-family: Arial, sans-serif; box-shadow: none; -moz-box-shadow: none; -webkit-box-shadow: none;). sp-form .sp-button-container (text-align: left;)