Design assignment GOST 21.1101. General requirements for the composition and completion of design and working documentation

FEDERAL AGENCY
FOR TECHNICAL REGULATION AND METROLOGY

Foreword

1 DEVELOPED by the Open Joint Stock Company Center for Methodology of Rationing and Standardization in Construction (OJSC TsNS)

2 INTRODUCED by the Technical Committee for Standardization TC 465 "Construction"

3 APPROVED AND PUT INTO EFFECT by Order of the Federal Agency for Technical Regulation and Metrology No. 156-st dated June 11, 2013

4 This standard implements the norms of the Town Planning Code of the Russian Federation dated December 29, 2004 No. 190-FZ

5 REPLACE GOST R 21.1101-2009

The rules for the application of this standard are established in GOST R 1.0-2012 (section 8). Information about changes to this standard is published in the annual (as of January 1 of the current year) information index "National Standards", and the official text of changes and amendments is published in monthly information index "National Standards". In case of revision (replacement) or cancellation of this standard, the corresponding notice will be published in the next issue of the monthly information index "National Standards". Relevant information, notice and texts are also posted in the public information system - on the official website of the Federal Agency for Technical Regulation and Metrology on the Internet (gost.ru)

1 area of ​​use. 3

3 Terms, definitions and abbreviations. 5

3.1 Terms and definitions. 5

3.2 Abbreviations. 7

4 General requirements for the composition and completion of design and working documentation. 7

4.1 Project documentation. 7

4.2 Working documentation. nine

4.3 General information on working drawings ... 11

5 General rules for the implementation of documentation. 12

5.1 General. 12

5.2 Main inscriptions. 13

5.3 Coordination axes. fourteen

5.4 Application of dimensions, slopes, marks and inscriptions. 16

5.5 Images (sections, sections, views, detailing elements) 19

6 Rules for the implementation of specifications on the drawings. 22

7 Rules for making changes. 22

7.1 General. 22

7.2 Permission to Change. 23

7.3 Changes. 23

7.4 Features of making changes to the design documentation .. 28

7.5 Features of making changes to the working documentation .. 29

8 Rules for registration of bound documentation. thirty

Appendix D (normative) Sheets of general data for working drawings .. 35

Appendix D (mandatory) List of ESKD standards to be taken into account when performing graphic and textual documentation for construction. 36

Appendix G (mandatory) Main inscriptions and additional columns to them .. 38

Appendix I (mandatory) The location of the title block, additional columns to it and the size of the frames on the sheets. 42

Appendix K (mandatory) Specifications. 43

Appendix P (reference) Examples of the execution of title pages. 52

Bibliography. 55

NATIONAL STANDARD OF THE RUSSIAN FEDERATION

System of design documents for construction

BASIC REQUIREMENTS FOR DESIGN AND WORKING DOCUMENTATION

System of design documents for construction.
Main requirements for design and working documents

Date of introduction- 2014-01-01

1 area of ​​use

This standard establishes the basic requirements for design and working documentation for the construction of objects for various purposes.

Note - In this standard, the concept of "construction" includes new construction, reconstruction, technical re-equipment and major repairs of capital construction projects.

The general rules for the execution and completion of graphic and textual documentation established in 4.1 and in sections 5 and 8, and the rules for making changes established in section 7, also apply to reporting technical documentation based on the results of engineering surveys for construction.

This standard uses normative references to the following standards:

GOST R 6.30-2003 Unified documentation systems. Unified system of organizational and administrative documentation. Requirements for paperwork

GOST R 21.1001-2009 System of design documentation for construction. General Provisions

GOST R 21.1002-2008 System of design documentation for construction. Norm control of design and working documentation

GOST R 21.1003-2009 System of design documentation for construction. Accounting and storage of project documentation

GOST R 21.1703-2000 System of design documentation for construction. Rules for the implementation of working documentation for wired communication

GOST 2.106-96 Unified system for design documentation. Text documents

GOST 2.308-2011 Unified system for design documentation. Indication of tolerances for the shape and location of surfaces

GOST 2.309-73 Unified system for design documentation. Surface roughness symbols

GOST 2.314-68 Unified system for design documentation. Instructions on the drawings on marking and branding of products

GOST 2.317-2011 Unified system for design documentation. Axonometric projections

GOST 2.501-88 Unified system for design documentation. Accounting and storage rules

GOST 21.110-95 System of design documentation for construction. Rules for the implementation of the specification of equipment, products and materials

GOST 21.113-88 System of design documentation for construction. Accuracy characteristic designations

GOST 21.114-95 System of design documentation for construction. Rules for the execution of sketch drawings of general views of atypical products

GOST 21.302-96 System of design documentation for construction. Graphic symbols in the documentation for engineering and geological surveys

GOST 21.408-93 System of design documentation for construction. Rules for the implementation of working documentation for the automation of technological processes

GOST 21.501-2011 System of design documentation for construction. Rules for the implementation of working documentation for architectural and structural solutions

GOST 21.709-2011 System of design documentation for construction. Rules for the implementation of working documentation for linear structures of irrigation and drainage systems

Note - When using this standard, it is advisable to check the validity of the reference standards in the public information system - on the official website of the Federal Agency for Technical Regulation and Metrology on the Internet or according to the annual information index "National Standards", which was published as of January 1 of the current year, and on the issues of the monthly information index "National Standards" for the current year. If the referenced standard to which an undated reference is given has been replaced, it is recommended that the current version of that standard be used, subject to any changes made to that version. If the referenced standard to which the dated reference is given is replaced, then it is recommended to use the version of that standard with the above year of approval (acceptance). If, after the approval of this standard, a change is made to the referenced standard to which the dated reference is given, affecting the provision to which the reference is made, then that provision is recommended to be applied without taking into account that change. If the reference standard is canceled without replacement, then the provision in which the reference to it is given is recommended to be applied in the part that does not affect this reference.

3 Terms, definitions and abbreviations

3.1 Terms and definitions

In this standard, the terms according to GOST R 21.1001, GOST R 21.1002, GOST R 21.1003 are used, as well as the following terms with the corresponding definitions:

3.1.1 main inscription: A set of information about the project document contained in the columns of the table of the established form, placed on the sheets of design and working documentation.

3.1.2 main set of working drawings: A graphic document containing the necessary and sufficient information in the form of drawings and diagrams, intended for the production of construction and installation work of a certain type (brand).

3.1.3 full set of working documentation: A set of basic sets of working drawings required for the construction of a building or structure, supplemented by attached and referenced documents.

3.1.4 Brand: An alphabetic or alphanumeric index included in the designation of working documentation and determining its relation to a certain type of construction and installation work, or designating the main distinctive features of building structures and their elements.

specification of equipment, products and materials: A text design document defining the composition of equipment, products and materials, intended for the acquisition, preparation and implementation of construction.

[GOST 21.110-95, section 3]

sketch drawing of a general view of a non-standard product: A document defining the initial design of a non-standard product, containing a simplified image, basic parameters and technical requirements for the product in the amount of initial data (tasks) required for the development of design documentation.

[GOST 21.114-95, article 3.1]

3.1.7 atypical product: A product (structure, device, mounting block) of technological systems, internal and external systems and networks of engineering and technical support of buildings and structures, first developed and manufactured, as a rule, at the installation site (in the procurement workshop of the installation organization).

building construction: A part of a building or structure that performs certain load-bearing, enclosing and (or) aesthetic functions.

[GOST 21.501-2011, article 3.3]

building structure element: Part of a prefabricated or monolithic structure.

[GOST 21.501-2011, article 3.5]

3.1.12 equipment: Technological equipment (machines, apparatus, mechanisms, lifting and other technical means ensuring the appropriate technological process), as well as engineering equipment of buildings and structures, providing safe and favorable conditions for the life of people.

coordination axis: One of the coordination lines that define the division of a building or structure into modular steps and floor heights.

[GOST 28984-2011, article 3.12]

3.1.14 plan: Top view or horizontal section of a building or structure.

3.1.15 facade: Orthogonal projection of the outer wall of a building or structure onto a vertical plane.

Note - There are main, side, courtyard facades, etc.

document details: A document decoration element containing information about it.

Note - As a rule, an attribute consists of attributes (compound attribute).

[GOST 2.104-2006, article 3.1.1]

document attribute: An identified (named) characteristic of a part of a props.

[GOST 2.104-2006, article 3.1.2]

signature: The requisite of the document, which is the handwritten signature of the authorized official.

Note - for electronic documents, an analogue of a handwritten signature is used - an electronic digital signature.

[GOST 2.104-2006, article 3.1.4]

3.1.20designation: Attributes of the document, which is its identification (distinctive) index.

Note - Each document is assigned a designation, which is recorded in established places (in the main inscriptions, on title pages, etc.).

3.2 Abbreviations

The following abbreviations are used in this standard:

DE - electronic document;

ESKD - Unified system for design documentation;

CAD - computer-aided design system (s);

SPDS - System of design documentation for construction;

EDMS - system (systems) of electronic document management.

4 General requirements for the composition and completion of design and working documentation

4.1 Project documentation

4.1.1 The composition of the design documentation for capital construction projects and the requirements for its content are established by legislation approved by the Government of the Russian Federation by the Regulations and normative legal acts of federal executive bodies.

Design documentation is completed, as a rule, in separate sections and subsections established by the Regulations. The names and codes of sections of the design documentation are given in Tables A.1 and A.2 (Appendix A).

In paper form, project documentation is completed in volumes in accordance with 4.1.4, 4.1.5 and section 8.

With a large volume (in paper form) of a section or subsection, as well as, if necessary, in other cases (for example, when attracting subcontractors), it is allowed to divide it into parts, and parts, if necessary, into books. Each part and book is completed separately. All parts and books are given names that reflect the content of the parts or books. Subsections, parts and books are assigned sequential numbers in Arabic numerals within the section, subsection or part, respectively.

4.1.2 Each section, subsection, part and, if necessary, the book, complete in the volume, as well as each text and graphic document included in the volume, is assigned an independent designation, which is indicated on the cover, title page and / or in the title block, as well as in the headers and footers of text documents performed without title blocks.

4.1.3 The section designation includes the basic designation established according to the system operating in the design organization, and through a hyphen * - the code of the design documentation section. The basic designation includes, for example, the number of the agreement (contract) and / or the code of the construction object (digital, alphabetic or alphanumeric). It is allowed to include other codes used in CAD and EDMS in the basic designation.

* It is allowed to use other separators in the designation, for example, a point, a slash, etc.

If a section is divided into parts, then the designation of the part is made up of the designation of the section to which the part number is added.

Examples of

1 2345-PZ- Section 1. Explanatory note.

2 2345-ROM1- Section 2. Scheme of the planning organization of the land plot. Part 1. General information.

3 2345-ROM2- Section 2. Scheme of the planning organization of the land plot. Part 2. Solutions for inland rail transport.

If a part is divided into books, then the designation of the book is made up of the designation of the part, to which the number of the book is added through a dot.

The subsection designation is made up of the section designation to which the subsection number is added.

If a subsection is divided into parts, then the designation of the part is made up of the designation of the subsection, to which the part number is added through a dot. If the part is divided into books, then the designation of the book (if necessary) is made up of the designation of the part, to which the book number is added through a dot.

Examples of

1 2345-IOS4.1.1- Section 5. Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 1. Basic decisions.

2 2345-IOS4.1.2- Section 5. Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 2. Automation systems for heating, ventilation and air conditioning.

3 2345-IOS4.2- Section 5. Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 2. Heating networks.

Based on the provisions of 4.1.1 - 4.1.3, 4.2.3 - 4.2.7, standards of organizations can be developed for the designation of text and graphic documents that are part of the design and working documentation, taking into account the specifics of designation depending on the volume of documentation, the conditions of document flow and used CAD and EDMS.

4.1.4 Text and graphic materials included in the general case are completed in the following order:

Cover;

Title page;

Statement "Composition of design documentation".

Note - It is allowed not to include the list "Composition of design documentation" in the composition of each volume, but to complete it with a separate volume;

Text part;

Graphic part (drawings and diagrams).

The rules for the design of the cover, title page, volume content and the list "Composition of project documentation" are given in section 8.

4.1.5 The number of sheets included in the volume is determined from the need to ensure the convenience of work, as a rule, no more than 300 sheets of A4 format in accordance with GOST 2.301 or an equivalent number of sheets of other formats.

4.1.6 General requirements for the implementation of graphic documentation are given in section 5.

4.1.7 Text documents containing mainly continuous text (including the text parts of sections and subsections of design documentation) are performed in accordance with GOST 2.105, taking into account 5.1, 5.2 of this standard.

4.1.8 It is allowed to execute text documents specified in 4.1.7, without main inscriptions, additional columns to them and frames. In this case:

On the first sheet, a list of performers is given, in which the positions, initials and surnames of the persons who took part in the development, control and approval of the text document are indicated, and provide places for signatures and dates of signing. On the second and, if necessary, on subsequent sheets, the content (table of contents) is placed, including the numbers (designations) and names of sections, subsections and applications of the text document, indicating the numbers of sheets (pages);

At the top (header) of each sheet, indicate the designation of the document: in the left corner (for single-sided printing) or the right corner of even-numbered pages and the left corner of odd-numbered pages (for double-sided printing);

At the bottom (footer) of each sheet indicate: the logo and name of the organization that prepared the document, the name of the document, the number of the sheet (page) of the document (in the lower right corner - for single-sided printing or in the left corner of even pages and the right corner of odd pages - for duplex) and, if necessary, the document version number, file identifier (name), and other information. It is allowed to show the logo and the name of the organization in the header;

Data on changes shall be indicated in accordance with 7.3.

4.1.9 Calculations of design and technological solutions, which are a mandatory element of the preparation of design documentation, are not included in the design documentation. They are drawn up in accordance with the requirements for text documents and stored in the archive of the design organization. Calculations are submitted to the customer or to the examination authorities at their request.

4.2 Working documentation

4.2.1 The composition of the working documentation handed over to the customer includes:

Working drawings, combined into the main sets of working drawings by brands. The brands of the main sets of working drawings are shown in Table B.1 (Appendix B);

Attached documents developed in addition to the working drawings of the main set.

4.2.2 The main sets of working drawings include general data on working drawings, drawings and diagrams provided for by the relevant SPDS standards.

4.2.3 The main set of working drawings of any brand can be divided into several basic sets of the same brand (with the addition of a serial number) in accordance with the process of organizing construction and installation work.

Example - AP1; AP2; KZh1; KZh2.

4.2.4 Each main set of working drawings is assigned a designation, which includes a basic designation, installed according to the system in force in the organization, and through a hyphen - the brand of the main set.

Example - 2345-12-AR,

where 2345-12 is the basic designation. The basic designation includes, for example, the number of the agreement (contract) and / or the code of the construction object (see 4.1.3), as well as the number of the building or structure according to the master plan *;

* For working drawings of linear structures, a general plan, external communications, this part of the basic designation is excluded or replaced with zeros.

AR - brand of the main set of working drawings.

4.2.5 It is allowed to design the main set of working drawings as separate documents with the assignment of a designation to them, consisting of a basic designation, a brand of the main set, and adding a serial number of the document through a dot in Arabic numerals.

Example - 2345-12-E0.1; 2345-12-E0.2,

where 2345-12 is the basic designation;

EO - brand of the main set of working drawings;

1, 2 - serial numbers of documents of the main set of working drawings.

The first document in such a design of the main set of working drawings should be general data on working drawings.

4.2.6 The attached documents include:

Working documentation for construction products;

Sketch drawings of general types of non-standard products, performed in accordance with GOST 21.114;

Specification of equipment, products and materials, carried out in accordance with GOST 21.110;

Questionnaires and dimensional drawings carried out in accordance with the data of manufacturers (suppliers) of equipment;

Local estimate;

Other documents stipulated by the relevant SPDS standards.

The specific composition of the attached documents and the need for their implementation are established by the relevant SPDS standards and design assignment.

The attached documents are transferred by the design organization to the customer simultaneously with the main set of working drawings in the amount set for working drawings.

4.2.7 Each attached document is assigned the designation of the basic set with the addition of the attached document through a cipher. The codes of the attached documents are given in Table B.1 (Appendix B).

Example - 2345-12-EO.C,

where 2345-12-EO - designation of the main set of working drawings;

C - code of the specification of equipment, products and materials.

If there are several attached documents of the same type, a serial number or, through a hyphen, a product brand (for product drawings) is added to their designation.

Example - 2345-12-VK.N1; 2345-12-VK.N2, 2345-12-KZh.I-B1, 2345-12-KZh.I-B2

4.2.8 In working drawings, it is allowed to use standard building structures, products and assemblies by reference to documents containing working drawings of these structures and products. Reference documents include:

Standards, which include drawings intended for the manufacture of products;

Drawings of typical structures, products and assemblies **.

** If necessary, drawings of standard designs, products and assemblies are recorded in the "Attached documents" section (as a rule, without changing the designation) and transferred to the customer in accordance with 4.2.6.

Reference documents are not included in the composition of the working documentation handed over to the customer. The project organization, if necessary, transfers them to the customer under a separate contract.

4.2.9 The form, rules of execution and designation of the document, which contains the composition of all working documentation, executed in accordance with the contract, are established in the standards of the organization.

4.3 General data on working drawings

4.3.1 On the first sheets of each main set of working drawings, general data on working drawings are given, which include:

List of working drawings of the main set, carried out in form 1;

List of reference and attached documents, executed in form 2;

List of the main sets of working drawings, carried out in form 2;

List of specifications (if there are several layouts in the main set), performed according to Form 1;

Symbols that are not established by national standards and whose values ​​are not indicated on other sheets of the main set of working drawings;

General instructions;

Other data stipulated by the relevant SPDS standards. Forms 1 and 2 with instructions on how to fill them out are given in Appendix D.

4.3.2 The list of working drawings of the main set contains a sequential list of sheets of the main set.

When drawing up the main set of working drawings as separate documents (see 4.2.5), instead of the list of working drawings of the main set, the general data include a list of documents of the main set in form 2, and in each of the subsequent documents of the main set, references are made to general data on the working drawings ...

4.3.3 The list of reference and attached documents is divided into sections:

Reference documents;

Attached documents.

In the section "Reference documents" indicate the documents in accordance with 4.2.8. At the same time, the designation and name of the series and the issue number of drawings of typical structures, products and assemblies or the designation and name of the standard are indicated in the corresponding columns of the statement.

In the section "Attached documents" indicate the documents in accordance with 4.2.6.

4.3.4 A list of the main sets of working drawings is given on the general data sheets of one of the main sets of working drawings of a building or structure (at the discretion of the person responsible for the development of working documentation). The statement contains a sequential list of the main sets of working drawings that are part of a complete set of working documents for a building or structure.

If there are several basic sets of working drawings of the same brand (see 4.2.3), a list of sets of this brand is drawn up in Form 2 (Appendix D), which is given, as a rule, in the general data of each of these sets.

4.3.5 The general instructions give:

Information about the documents on the basis of which the decision was made to develop working documentation (for example, design assignment, approved project documentation);

A record of the compliance of the working documentation with the design assignment, issued to the technical conditions, the requirements of the current technical regulations, standards, sets of rules, and other documents containing the established requirements;

The list of technical regulations and normative documents containing requirements for technical solutions and further production of work, references to which are given in the working drawings;

The absolute mark taken in the working drawings of a building or structure conditionally as zero (as a rule, it is given in the drawings of architectural and structural solutions);

A record of the results of checking for patentability and patent purity of technological processes, equipment, structures, products and materials used for the first time in project documentation, as well as the numbers of patents and applications for which decisions were made to issue patents for inventions used in the working documentation (if necessary);

The list of types of work that affect the safety of a building or structure and for which it is necessary to draw up certificates of inspection of hidden works, critical structures and sections of engineering and technical support networks;

Information about who owns this intellectual property (if necessary);

Operational requirements for the projected building or structure (if necessary);

Other necessary instructions.

The general instructions should not repeat the technical requirements placed on other sheets of the main set of working drawings, and give a description of the technical solutions adopted in the working drawings.

Items of general instructions should be consecutively numbered. Each item of the general instructions is written on a new line.

5 General rules for the execution of documentation

5.1 General

5.1.1 When executing design and working documentation, as well as reporting technical documentation for engineering surveys for construction, one should be guided by the provisions of the SPDS and ESKD standards.

The list of ESKD standards to be taken into account when performing graphic and textual documentation for construction is given in Table D.1 (Appendix D).

5.1.2 Documentation, as a rule, is performed in an automated way on paper (in paper form) and / or in the form of DE.

Documents of the same type and name, regardless of the method of execution, are equal and interchangeable. Mutual correspondence between documents in electronic and paper forms is ensured by the developer.

General requirements for electronic documents - in accordance with GOST 2.051.

5.1.3 In graphic documents, images and symbols are performed with lines in accordance with GOST 2.303. It is allowed to use lines of other types, names, style, thickness and main purposes of which are set in the relevant SPDS standards.

5.1.4 In graphic documents, symbols should be performed mainly in black. Some symbols or their individual elements may be executed in other colors. Refer to the relevant SPDS standards for legend color guidance. If the colors of the symbols used in the drawings and diagrams are not established in the standards, their purpose is indicated on the drawings.

In originals intended for making black-and-white copies, color symbols and their elements should be used in black.

5.1.5 When executing graphic documents, fonts in accordance with GOST 2.304 are used, as well as other fonts used by computer technology, provided that the conditions for the availability of these fonts to document users are ensured.

5.1.6 Drawings are performed at the optimal scale in accordance with GOST 2.302, taking into account their complexity and richness of information.

The scale of images in the drawings is not indicated, with the exception of product drawings and other cases provided for in the relevant SPDS standards. In these cases, the scales are indicated in parentheses immediately after the names of the images in accordance with GOST 2.316 (paragraph 4.19).

5.1.7 Drawings on paper and electronic drawings (2D) can be made on the basis of an electronic model (3D) of a building or structure (GOST 2.052).

5.1.9 The structure and composition of the DE details must ensure its circulation within the software (displaying, making changes, printing, recording and storing in databases, as well as transferring to other automated systems) while observing the regulatory requirements for paperwork.

5.1.10 For consideration, agreement, expertise and approval, submit copies of design and working documentation documents, completed as specified in 4.1 and 4.2.

5.1.11 The form of submission of documents for design and working documentation (paper or electronic), if it is not indicated in the design assignment, is determined by the developer in agreement with the customer. It is allowed to include documents in various forms of presentation in the design and working documentation.

5.1.12 The rules for the transfer of documentation on electronic media, including the nomenclature and forms of the necessary accounting and reporting documents, are established in the organization's standards developed on the basis of GOST 2.051, GOST 2.511 and GOST 2.512.

5.1.13 The list of word abbreviations allowed in graphic documents is compiled in addition to GOST 2.316 and is shown in Table E.1 (Appendix E).

5.2 Title blocks

5.2.1 Each sheet of a graphic and text document, as a rule, is drawn up with a title block and additional columns to it. Forms of main inscriptions and instructions for filling them out are given in Appendix G.

Note - The main inscriptions do not draw up text documents executed in accordance with 4.1.8, estimates, etc.

The main inscription is located in the lower right corner of the sheet.

On A4 sheets in accordance with GOST 2.301, the main inscription is placed along the short side of the sheet. For text documents in tabular form, it is allowed, if necessary, to place the title block along the long side of the sheet.

On the sheets of the main sets of working drawings and sheets of the graphic part of the project documentation - form 3;

On the first sheet of drawings of building products - form 4;

On the first or title * sheets of text documents and the first sheets of sketch drawings of general types of atypical products, issued in the form of an issue, - form 5;

* For text documents executed with a title page and drawn up with main inscriptions, the title page is the next page after the title page.

On the subsequent sheets of drawings of construction products, text documents and sketch drawings of general views - form 6.

It is allowed to draw up the first sheet of a drawing of a building product with a main inscription in form 5.

5.2.3 If some text documents (for example, the specification of equipment, products and materials) are issued without a title page, then in this case the first page of the document is drawn up with a title block according to Form 3, the subsequent ones - according to Form 6.

When drawing up the main set of working drawings as separate documents, documents containing solid text and / or in the form of tables (for example, general data, cable log, etc.) are drawn up as text documents. In this case, the first sheet of the document is drawn up with the main inscription in form 3, the subsequent ones - in form 6.

5.2.4 In the reporting technical documentation based on the results of engineering surveys, the main inscription is used:

On sheets of graphic documents used in design as a basis - according to form 3;

On the first sheets of other graphic and text documents - according to form 5, on subsequent sheets - according to form 6.

5.2.5 The main inscription, additional columns to it and frames are made with solid thick main and solid thin lines in accordance with GOST 2.303.

5.2.6 The table of changes in the title block (columns 14 - 19), if necessary, may be continued up or to the left of the title block. When the table of changes is located to the left of the title block, columns 14 - 19 are repeated.

5.2.7 The location of the main inscription and additional columns to it, as well as the sizes of the frames on the sheets are shown in Figures I.1 and I.2 (Appendix I).

5.2.8 The design organization shall independently establish the location and size of additional columns for the identification of DE.

5.2.9 It is allowed to additionally identify project documents using a barcode.

In this case, the document designation, version number and document format designation should be used as barcode details. Additionally, the country code, code of the developer organization and other details can be used.

5.3 Coordination axes

5.3.1 On the images of a building or structure, the coordination axes of its supporting structures are indicated, intended to determine the relative position of the elements of a building or structure and to tie the building or structure to a building geodetic grid or alignment base.

5.3.2 Each individual building or structure is assigned an independent designation system for the coordination axes.

Coordination axes are applied to images of a building or structure with thin dash-dotted lines with long strokes, denoted in circles with a diameter of 6-12 mm in Arabic numerals and capital letters of the Russian alphabet (except for letters: E, 3, Y, O, X, Ts, Ch, Shch , B, Ы, b) or, if necessary, letters of the Latin alphabet (except for the letters I and O).

Omissions in digital and alphabetic (except for those indicated) designations of the coordination axes are not allowed.

The numbers indicate the coordination axes on the side of the building and structure with a large number of axes. If there are not enough letters of the alphabet to designate the coordinate axes, the subsequent axes are designated by two letters.

Example - AA, BB, BB.

5.3.3 The sequence of designations of the coordination axes is taken according to the plan, as shown in Figure 1a: digital axes - from left to right, letter axes - from bottom to top, or as shown in Figures 1 b and 1 v.

5.3.4 The designation of the coordinate axes, as a rule, is applied to the left and lower sides of the building and structure plan.

If the coordination axes of the opposite sides of the plan do not coincide at the points of divergence, the designations of the indicated axes are additionally applied along the upper and / or right sides.

5.3.5 For individual elements located between the coordination axes of the main supporting structures, additional axes are applied, which are assigned a designation in the form of a fraction, in the numerator of which the designation of the previous coordination axis is indicated, and in the denominator - an additional serial number within the area between adjacent coordination axes in according to figure 1 G.

It is allowed to assign digital and letter designations to the coordination axes of half-timbered columns in the continuation of the designations of the axes of the main columns without an additional number.

5.3.6 On the image of a repeating element tied to several coordination axes, the coordination axes are designated in accordance with the figure:

2а - with their number not exceeding 3;

2b- if their number is more than 3;

2v- for all alphabetic and digital coordination axes.

If necessary, the orientation of the coordination axis to which the element is attached with respect to the adjacent axis is indicated in accordance with Figure 2. G.

Picture 1

Picture 2

5.3.7 On the plans of residential buildings, composed of block sections, the extreme coordination axes of block sections are assigned designations in accordance with 5.3.1 - 5.3.3, which are indicated in accordance with Figure 3a.

The coordination axes of the block sections, including the extreme ones, are assigned independent designations in accordance with 5.3.1 - 5.3.3 with the addition of the "c" index (see Figure 3 b). If necessary, on the plan of block sections, indicate the designations of the coordination axes of a building composed of block sections.

Figure 3

5.3.8 A three-dimensional (3D) electronic model of a building or structure is performed in a single horizontal-height coordinate system.

The coordinate system of a three-dimensional model of a building or structure is depicted by three mutually perpendicular lines with the origin located at the intersection of axes 1 and A at the zero mark of this building or structure in accordance with Figure 4.

Figure 4

In this case, for a building rectangular in plan (see Figure 1a), the following are taken as the positive direction: axes X- in the direction of increasing the digital designations of the coordination axes, axes Y- in the direction of increasing the letter designations of the coordination axes, axes Z- vertically upward from the conditional zero level of the building.

5.4 Dimensioning, slopes, marks and labels

5.4.1 Linear dimensions in the drawings are indicated without designation of units of length:

In meters with an accuracy of two decimal places - on the drawings of external networks and communications, the master plan and transport, except for the cases specified in the relevant SPDS standards;

In millimeters - in all other types of drawings.

5.4.2 The dimension line at its intersection with extension lines, contour lines or center lines is limited by serifs 2 to 4 mm long, applied with an inclination to the right at an angle of 45 ° to the dimension line, while the dimension lines continue beyond the extreme extension lines (or, respectively, beyond contour or axial) by 0 - 3 mm.

When drawing the dimension of the diameter or radius inside the circle, as well as the angular dimension, the dimension line is limited by arrows. Arrows are also used when dimensioning radii and internal fillets.

When applying dimensions on axonometric diagrams of technological pipelines and engineering systems, it is allowed to limit dimension lines with arrows.

5.4.3 The marks of the levels (height, depth) of structural elements, equipment, pipelines, air ducts, etc. from the reference level (conditional "zero" mark) are indicated in meters without designation of the unit of length with three decimal places separated from an integer by a comma, for except for the cases stipulated in the relevant SPDS standards.

Level marks on facades, sections and sections are placed on extension lines (or on contour lines) and denoted by a "¯" sign made by solid thin lines with a stroke length of 2 - 4 mm at an angle of 45 ° to the extension line or contour line, in accordance with Figure 5; on plans - in a rectangle in accordance with Figure 6, except for the cases specified in the relevant SPDS standards.

Figure 5

Figure 6

The "zero" mark, taken, as a rule, for the surface of any structural element of a building or structure located near the planned surface of the earth, is indicated without a sign; relative elevations above zero are indicated with a "+" sign, below zero - with a "-" sign.

Note - As a rule, the level of the finished floor of the first floor is taken as a zero mark for buildings.

5.4.4 On the plans, the direction of the slope of the planes is indicated by an arrow, over which, if necessary, the numerical value of the slope in percent is put down in accordance with Figure 7a or as the ratio of the unit of height of the plane to the corresponding horizontal projection (for example, 1: 7).

It is allowed to indicate the numerical value of the slope in ppm or in the form of a decimal fraction with an accuracy of the third decimal place.

On cuts, sections and diagrams in front of the dimension number, which determines the numerical value of the slope, the sign "Ð" is applied, the acute angle of which should be directed towards the slope (except for the steepness of the slopes of embankments and cuts). The slope designation is applied directly above the contour line or on the shelf of the leader line in accordance with Figure 7b .

Figure 7

5.4.5 Position numbers or marks of elements are applied on the shelves of leader lines drawn from images of structural elements of buildings or structures, next to the image - without a leader line or within the contours of the displayed elements in accordance with Figure 8.

Figure 8

A leader line usually ends with a dot. If the leader line moves away from the surface line, then it ends with an arrow. For a small-scale image, leader lines end without an arrow and a point.

5.4.6 Callouts for multilayer structures are performed in accordance with Figure 9.

Note - The numbers conventionally designate the sequence of the arrangement of the layers of structures and inscriptions on the shelves of the leader lines.

Figure 9

5.4.7 The font size for designating the coordinate axes, positions (marks), names and designations of images should be 1.5 - 2 times larger than the size of the digits of the dimensional numbers used in the same graphic document.

5.5 Images (sections, sections, views, details)

5.5.1 Images in the drawings are performed in accordance with GOST 2.305, taking into account the requirements of this standard and other SPDS standards.

5.5.2 Sectional views of a building or structure are designated in Arabic numerals sequentially within the graphic document. Sections are designated in the same way.

Note - In the drawings of design and working documentation, a section is usually called a vertical section of a building or structure, that is, a section made by a cutting plane perpendicular to the horizontal plane of projections.

Self-numbering is allowed for sections and sections of individual sections of a building, structure or installations, all drawings of which are placed on one sheet or a group of sheets and if these drawings do not contain references to sections and sections located on other sheets of a graphic document.

It is allowed to designate cuts with uppercase letters of the Russian alphabet, and sections - with uppercase or lowercase letters of the Russian alphabet (with the exception of the letters specified in 5.3.2).

The position of the secant plane is indicated in the drawing with a section line (open line in accordance with GOST 2.303). With a complex section, strokes are also drawn at the intersection of the secant planes with each other. Arrows should be placed on the initial and final strokes, indicating the direction of the gaze; arrows should be drawn at a distance of 2 - 3 mm from the end of the line (Figure 10).

The direction of view for a section along the plan of a building and structure is taken, as a rule, from bottom to top and from right to left.

5.5.3 If individual parts of the view (facade), plan, section require a more detailed image, then in addition, local views and detailing elements - nodes and fragments - are performed.

5.5.4 On the image (plan, facade or section), from where the node is taken out, the corresponding place is marked with a closed solid thin line (circle, oval or rectangle with rounded corners) with the drawing on the shelf of the leader line of the node designation in Arabic numerals in accordance with Figures 11a , eleven b or a capital letter of the Russian alphabet in accordance with Figure 11 v.

If necessary, references to a unit placed in another graphic document (for example, the main set of working drawings), or to working drawings of a typical building unit indicate the designation and sheet number of the corresponding document in accordance with Figure 11 b or a series of working drawings of typical units and the issue number in accordance with Figure 11 v.

Figure 10

Figure 11

Above the image of the knot, indicate in a circle its designation in accordance with Figure 13a, if the knot is depicted on the same sheet from which it was taken out, or 13b, if it is taken out on another sheet.

The node, which is a complete mirror image of another (main) performance, is assigned the same designation as the main performance, with the addition of the "n" index.

Figure 12

Figure 13

5.5.5 Local views are designated in capital letters of the Russian alphabet, which are applied next to the arrow indicating the direction of sight. The same designations are applied over the images of the species.

5.5.6 For each type of images (sections and sections, nodes, fragments), an independent order of numbering or letter designations is used.

5.5.7 On the image (plan, facade or section), from where the fragment is taken out, the corresponding place is marked, as a rule, with a curly brace in accordance with Figure 14.

The name and serial number of the fragment are applied under the curly brace or on the shelf of the leader line, as well as above the corresponding fragment.

Figure 14

5.5.8 Images up to the axis of symmetry of symmetrical plans and facades of buildings and structures, layouts of structural elements, layouts of technological, power, sanitary and other equipment are not allowed.

5.5.9 If the image of a cut, section, node, view or fragment is placed on another sheet, then after the designation of the image, indicate in brackets the number of this sheet in accordance with Figures 10, 11a, 12 and 14.

5.5.10 Images can be rotated. At the same time, in the names of the images in the drawings, the conventional graphic designation "rotated" is not given

according to GOST 2.305, if the position of the image is determined unambiguously, that is, it is oriented by the coordination axes and / or elevation marks.

5.5.11 If an image (for example, a plan) does not fit on a sheet of an accepted format, then it is divided into several sections, placing them on separate sheets.

In this case, on each sheet, where an area of ​​the image is shown, a diagram of the whole image is given with the necessary coordination axes and a symbol (hatching) of the area of ​​the image shown on this sheet in accordance with Figure 15.

Note - If the drawings of the image areas are placed in different basic sets of working drawings, then the full designation of the corresponding basic set is indicated above the sheet number.

Figure 15

5.5.12 If the floor plans of a multi-storey building have slight differences from each other, then the plan of one of the floors is completely fulfilled; for other floors, only those parts of the plan are performed that are necessary to show the difference from the plan shown in full.

Under the name of the partially depicted plan, an entry is given: "For the rest, see the plan (name of the fully depicted plan)."

5.5.13 In the names of plans of a building or structure indicate the word "Plan" and the elevation of the finished floor or the number of the floor, or the designation of the corresponding secant plane (when two or more plans are executed at different levels within the floor).

Examples of

1 Plan at elev. 0.000

2 Plan of the 2nd floor

3 Shot 3-3

When a part of the plan is executed, the name indicates the axes that limit this part of the plan.

Example- Elevation plan 0.000 between axles 21-30 and A-D

It is allowed to indicate the purpose of the premises located on the floor in the name of the floor plan.

5.5.14 In the names of sections of the building (structure) indicate the word "Section" and the designation of the corresponding cutting plane according to 5.5.2.

Example- Section 1-1

Note - In the names of product sections, the word "Section" is not indicated.

Section names are numeric or alphabetic sectioning planes.

Example- 5 -5 B-B, ah

5.5.15 In the names of the facades of a building or structure indicate the word "Facade" and designations of the extreme axes between which the facade is located.

Example- Facade 1-12, Facade 1-1, Facade A -G

It is allowed to indicate its location in the name of the facade, for example, "main", "yard", etc.

5.5.16 The names of the images in the drawings are not underlined.

6 Rules for the implementation of specifications on drawings

6.1 To the layouts of elements of prefabricated structures, monolithic reinforced concrete structures, to the drawings of the location of technological equipment and / or pipelines, installations (blocks) of technological, sanitary and other equipment, as well as to other drawings, specifications are drawn up in accordance with Form 7 (Appendix K).

When performing drawings by the group method, group specifications are made in accordance with Form 8 (Appendix K).

6.2 The specification is placed, as a rule, on a sheet of drawings, which shows diagrams, layouts of equipment and pipelines, plans of installations. It is allowed to carry out the specification on separate sheets as subsequent sheets of drawings.

6.3 In electronic models, if necessary, specifications and other tables in the drawings may be performed in the workspace of the electronic model, taking into account the provisions of GOST 2.052. In this case, it is recommended to perform them at a separate information level.

6.4 Specifications of building products are made in accordance with GOST 21.501.

7 Rules for amendments

7.1 General

7.1.1 Based on the provisions of section 7 of this standard, standards of organizations can be developed, taking into account the peculiarities of making changes to design documents, depending on the volume of documentation, document flow conditions and the CAD and EDMS used.

7.1.2 A change in a document previously transferred to the customer is any correction, deletion or addition to it of any data without changing the designation of this document.

The designation of a document may only be changed if the same designation has been erroneously assigned to different documents or an error has been made in the designation of the document. Changes to calculations are not allowed.

7.1.3 If a change to a document is unacceptable, a new document should be issued with a new designation.

7.1.4 Any change in a document causing any changes in other documents must be simultaneously accompanied by the introduction of appropriate changes in all related documents.

7.1.5 Changes are made to the original document.

7.1.6 Information on the fact of a change in the document is indicated by:

In paper documents - in the title block of these documents and / or in the change registration tables;

In DE - in the requisite part of these documents;

In the "Note" column of documents and statements intended for accounting documents.

7.2 Permission to change

7.2.1 Amendment of a document (including its cancellation) is performed, as a rule, on the basis of a permission to amend (hereinafter - permission). The permit is carried out on paper according to Forms 9 and 9a (Appendix L) or as DE.

The permit is registered in accordance with GOST R 21.1003.

7.2.2 The permission is approved by the head of the organization - the developer of the document or another official authorized by him.

Permission is the basis for obtaining original documents and making changes to them.

7.2.3 Originals of permits on paper are stored in the archives of the organization.

7.2.4 Changes to each document (for example, the main set of working drawings, specification of equipment, products and materials) are made on the basis of a separate permit.

It is allowed to draw up one general permission for changes made simultaneously to several documents, if the changes are interrelated or the same for all the changed documents.

Changes to the documents of the main set of working drawings, drawn up in separate documents (see 4.2.5), as well as to the documents of the volume of design documentation, are made on the basis of one general permit.

7.2.5 When making changes to the DE, it is allowed not to issue a permit if the CAD and EDMS keep records and store versions of the document and provide access control that excludes the possibility of unauthorized changes.

7.3 Changes

7.3.1 Changes are indicated by sequential numbers (1, 2, 3, etc.). One change serial number is assigned to all changes that are made to the document by one permission. It is indicated for the entire document, regardless of how many sheets it is made on.

7.3.2 When making changes to the original DE, any change is indexed as a new version of this document.

7.3.3 Changes to paper originals of documents are made by:

Strikethrough;

Cleaning (washing off);

Painting with white;

Introducing new data;

Replacing sheets or the entire document;

Introduction of new additional sheets and / or documents;

Exclusion of individual sheets of the document.

In this case, the physical condition of the original is taken into account.

7.3.4 Changes to documents are made by automated and handwritten methods.

7.3.5 Manuscript changes are made to paper originals of documents in accordance with 7.3.9 - 7.3.16.

After making changes, the originals should be suitable for making copies of documents of adequate quality using reprographic methods.

7.3.6 Changes to the DE are made by issuing a new version of the document with the changes introduced.

7.3.7 When making changes in an automated way, a new original is produced taking into account the changes introduced and its previous designation is retained.

A new original is also made if there is not enough space for handwriting changes or if the image clarity may be disturbed when correcting.

If one or more sheets of the original are replaced or added, then the inventory number assigned to the original is retained on them.

When replacing all sheets of the original, a new inventory number is assigned to it.

7.3.8 Changes to the estimate documentation are carried out in an automated way with the replacement of the entire document.

7.3.9 Variable sizes, words, signs, inscriptions, etc. are crossed out with solid thin lines and new data are added next.

7.3.10 When the image (part of the image) changes, it is encircled with a solid thin line, forming a closed contour, and crossed out crosswise with solid thin lines in accordance with Figure 16.

A new image of the changed area is performed on a free margin of the sheet or on another sheet without rotations.

Figure 16

7.3.11 Variable and additional sections of the image are assigned a designation consisting of the serial number of the next change in the document and through the dot of the serial number of the changed (additional) section of the image within this sheet. In this case, the designation of the change of the replaced image is assigned to the new image of the changed area.

If a new image of the changed area is placed on another sheet, then the change designation assigned to it is saved and is not taken into account in the change table of this sheet.

7.3.12 About each change, including around the place corrected by erasure (washing) or painting in white, outside the image or text, a change designation is applied in the parallelogram (see Figure 16) and a solid thin line is drawn from this parallelogram to the changed area ...

It is allowed not to draw a line from the parallelogram with the designation of the change to the changed section.

When making changes to text documents (in the text part of documents), the lines from the parallelogram with the designation of the change are not drawn.

7.3.13 Adjusted sizes, words, signs, inscriptions, etc. that are closely spaced from each other, are enclosed with a solid thin line forming a closed contour, without striking through in accordance with Figure 17.

Figure 17

7.3.14 If a new image of the changed area is placed on another sheet, then the number of the sheet on which the new image is located is also indicated for the replaced image (see Figure 16).

7.3.15 Above the new image of the changed area, the designation of the change of the replaced image is placed in the parallelogram, and in the case of the parallelogram, indicate: "Instead of the crossed out one".

If a new image of the changed area is placed on another sheet, then with a parallelogram indicate: "Instead of the one crossed out on the sheet (number of the sheet on which the replaced image is located)" in accordance with Figure 18.

Figure 18

7.3.16 If a new image of the changed area is placed near the replaced one, then they are connected by leader lines with a change designation in accordance with Figure 19.

Figure 19

Above the additional image, the designation of the change is placed in the parallelogram, and when the parallelogram is indicated: "Supplement" in accordance with Figure 20.

Figure 20

7.3.17 When adding a new sheet of a text document, it is allowed to assign it the number of the previous sheet with the addition of the next lowercase letter of the Russian alphabet or through a dot of the Arabic numeral, for example 3a or 3.1.

In text documents containing mostly solid text, it is allowed, when adding a new item, to assign it the number of the previous item with the addition of the next lowercase letter of the Russian alphabet, and if the item is excluded, keep the numbers of subsequent items.

7.3.18 When changing the total number of sheets of a document on its first sheet in the title block, make the appropriate corrections in the column "Sheets".

7.3.19 Data on changes made to the original are indicated in the table of changes placed in the main inscription (if any), and if there is a lack of space, in an additional table to it (see 5.2.6).

In the new (modified) version of the DE in the table of changes, only data on the last change are indicated.

7.3.20 When making changes to documents, the table of changes is filled out on sheets (sheet):

The first (capital) of the new original, made as a whole to replace the old one;

Changed;

Released instead of replaced;

Added again.

7.3.21 The table of changes indicates:

a) in the column "Change." - serial number of the document change. When replacing the original with a new one, the next serial number is affixed based on the last change number indicated in the replaced original;

b) in the column "Qty. uch. " - the number of changing areas of the image on a given sheet within the next change;

c) in the "Sheet" column:

1) on the sheets issued instead of the replaced ones - "Deputy";

2) on the sheets added again - "New";

3) when replacing all sheets of the original when manually making changes on the first (title) sheet - "All" (while the table of changes on other sheets of this original is not filled in), in an automated way - "Deputy." on all sheets.

In other cases, a dash shall be placed in the "Sheet" column;

d) in the column "Doc." - designation of permission;

e) in the column "Sign." - signature of the person responsible for the correctness of the amendment. When replacing all sheets of the original in an automated way, the signature is affixed only on the first (title) sheet. The signature of the supervisor is affixed on the field for filing the sheet (except for sheets issued instead of replaced and new ones);

f) in the column "Date" - the date of the change.

7.3.22 It is recommended to register changes in text documents in the table for registering changes in form 10 (Appendix M), which is placed on a separate last sheet of the document when the first and subsequent changes are made.

7.3.23 When replacing sheets of documents drawn up with basic inscriptions in forms 3 - 5, the sheets issued instead of the replaced ones are signed in columns 10 - 13 of the main inscriptions in accordance with the procedure provided for the newly developed sheets.

7.3.24 When canceling or replacing sheets of a document, all canceled and replaced original sheets are stamped "Canceled (replaced)" in the form given in GOST R 21.1003 (Appendix D), which is filled in according to the instructions given there.

7.4 Features of making changes to design documentation

7.4.1 Changes to the design documentation are made in accordance with 7.1 - 7.3, taking into account the provisions of 7.4.2 - 7.4.8.

7.4.2 Changes to the design documentation previously transferred to the customer, as a rule, are made in an automated way and are carried out:

Replacement, addition or exclusion of individual sheets of the volume;

Replacement (re-release) of the volume - when it is completely reworked;

Release of additional volumes.

7.4.3 When a section or subsection of the project documentation is completely revised, it is recommended to provide information about the changes made at the beginning of its text part: the basis for making changes, a brief description of the changes made.

7.4.4 If changes are made on the basis of a negative conclusion of the examination of the design documentation, then in the section "Explanatory Note" as an attachment include a certificate describing the changes made to the design documentation. The certificate must be signed by the person responsible for the preparation of project documentation - the chief project engineer.

7.4.5 Registration of changes (versions) of the volume as a whole is carried out in the table of registration of changes in form 11 (Appendix M), which is placed when changes are made on its title page and cover. It is allowed to show the table only on the cover.

The changes registration table does not take into account the corrections made to the list "Composition of design documentation" due to changes in other volumes of design documentation.

7.4.6 Information about changes in sheets of graphic documents is indicated in the column "Note" of the content of the volume:

a) for replaced sheets when the first change is made - “Amendment. 1 (Zam.) ", Subsequent changes - additionally the successive numbers of changes, separating them from the previous ones with a semicolon.

Example- Rev. 1 (Deputy);

b) for excluded (canceled) sheets with the change number - "(Canceled)".

Example- Rev. 1 (Annul.);

c) for additional sheets with the change number - "(New)"

Example- Rev. 1 (New).

7.4.7 When completing additional volumes of design documentation, corrections are made to the list "Composition of design documentation".

Information about changes in the list "Composition of design documentation" in the content of the volume is not given.

7.4.8 Changes to the approved design documentation related to changes in the parameters of the construction object affecting its structural reliability and safety, and the need to re-approve the design documentation, are made at the customer's decision on the basis of a new design assignment or additions to a previously approved design assignment.

7.5 Features of making changes to working documentation

7.5.1 Changes to the working documentation are carried out in accordance with 7.1 - 7.3, taking into account the provisions of 7.5.2 - 7.5.9.

7.5.2 When making changes to the sheets of the main set of working drawings in the list of working drawings of this set in the column "Note" indicate:

For replaced, canceled and additional sheets - information in accordance with items a) - c) 7.4.6;

For modified sheets (handwritten) when making the first change - "Change. 1 ", subsequent changes - additionally the successive numbers of changes, separating them from the previous ones with a semicolon.

Example- Rev. 1; 2; 3.

In case of replacement of general data sheets in the list of working drawings of this set, it is allowed to provide information only about the last change of sheets of the main set.

7.5.3 If additional sheets are included in the main set of working drawings, then they are assigned successive serial numbers and recorded in the continuation of the list of working drawings of the corresponding main set.

If there is not enough space in the list of working drawings for recording additional sheets, the continuation of the list is transferred to the first of the additional sheets. At the same time, at the end of the list of working drawings, placed in the "General data", they make an entry: "For the continuation of the list, see the sheet (sheet number)", and above the list on an additional sheet, place the title: "List of working drawings of the main set (Continued)" ...

When changing the names of sheets, make the appropriate corrections in the column "Name".

When making changes in a handwritten method, the numbers and names of the canceled sheets in the list of working drawings are crossed out, in an automated way - the column "Name" for the canceled sheets is not filled out.

7.5.4 When making changes to the documents of the main set, drawn up in separate documents, make the appropriate corrections to the list of documents of the main set of working drawings.

7.5.5 When performing additional and cancellation of previously executed attached documents, make corrections in the section "Attached documents" of the list of reference and attached documents of the corresponding main set of working drawings.

When replacing reference documents in working drawings (see 4.2.8), corrections are made to the appropriate section of the list of reference and attached documents.

7.5.6 When completing additional and cancellation of previously completed main sets of working drawings, corrections are made to the list of main sets of working drawings.

7.5.7 In the tables of changes on the general data sheets, corrections made in the general data sheet in connection with the introduction of changes to the sheets of the main set and the attached documents are not taken into account as sections of changes in accordance with 7.3.11.

7.5.8 Registration of changes in documents of working documentation, drawn up with title pages, is also carried out in the table for registration of changes in form 11 (Appendix M), which is placed on the title page when changes are made.

7.5.9 Copies of sheets (modified, additional and issued instead of replaced sheets) of working documentation on paper are sent to organizations to which copies of documents were previously sent, simultaneously with copies of general data of the corresponding main set of working drawings, updated in accordance with 7.5.2 - 7.5 .6.

New versions of the amended documents are sent to organizations electronically (see 7.3.6).

8 Rules for registration of bound documentation

8.1 Copies of text and graphic materials of design documentation and reporting technical documentation for engineering surveys are brochured in volumes folded into A4 format GOST 2.301.

Note - Binding means the placement of materials of project documentation on paper in bindings or in hard folders with easily detachable fasteners (locks).

8.2 Copies of documents of working documentation are completed into folders, sheet by sheet, folded in A4 format, as a rule, separately according to the main sets of working drawings.

It is allowed to bind copies of working documents in volumes in accordance with 8.1 or in albums folded in A3 format.

The number of sheets included in a folder or album must comply with 4.1.5.

8.3 Each document, volume or album intended for stitching, as well as a folder with documents folded into it, is designed with a cover in form 12 (Appendix H). The cover is not numbered and is not included in the total number of sheets.

8.4 The first page of a bound document, as well as a volume consisting of several documents, an album or a folder with working documents, is the title page.

The title page is made in accordance with Form 13 (Appendix P). Examples of the execution of title pages are shown in Figures P.1 and P.2 (Appendix P).

In the volume of design documentation, which consists of several independent documents, including the text part, the title page to the text part, as a rule, is not performed.

8.5 All pages of a bound volume (album) are recommended to be numbered sequentially, starting with the title page. In this case, the title page is not numbered. The sheet number is indicated in the upper right corner of the sheet working field (see Appendix I).

In addition, text and graphic documents included in the volume (album) and having an independent designation must have sequential numbering of sheets within the document with one designation in the title block or in the header (in accordance with 4.1.8).

8.6 When collecting several documents in the form of a volume, album, as well as in a folder after the title page, the contents of the volume (album, folder) are given, which is a list of documents included in the volume (album, folder). The content is performed according to Form 2 (Appendix D) on A4 sheets.

The documents in the content are recorded in the sequence of their acquisition, in an album or a folder. Graphic documents of design and reporting technical documentation for engineering surveys are written down sheet by sheet. The cover and title page are not recorded in the table of contents.

In the column "Name" - the name of the document in full accordance with the name indicated in the title block or on the title page;

In the "Note" column - information about the changes made to the recorded documents, as well as the number of the volume sheet according to the sequential numbering of the volume sheets in accordance with 8.5, from which the document begins.

If sequential numbering is not performed, then the total number of sheets of each document is given in the "Note" column. At the end of the content, the total number of sheets included in the volume (album, folder) is given.

The first page of the volume (album, folder) content is drawn up with the main inscription according to Form 5 (Appendix G), the subsequent ones - according to Form 6 (Appendix G). The content is assigned a designation consisting of the designation of the volume (album, folder) and through the hyphen cipher "C".

Example - 2345-ROM2-C; 2345-11-KZh.I-S; 2345-11-OV.OL-S; 2345-11-TX.H-S

Column 5 of the main inscription indicates "Volume content" or, respectively, "Album content" and "Folder content" and then - the number of the corresponding volume, album or folder (if any).

8.7 Title pages of volumes of design documentation are drawn up with signatures:

The head or chief engineer of the organization;

The person responsible for the preparation of project documentation, for example, the chief engineer (architect) of the project.

The title pages of working documents are signed by the person responsible for the preparation of working documents - the chief engineer (architect) of the project.

The title page of the technical report based on the results of engineering surveys is signed by the head of the organization or his deputy and, if necessary, other officials.

The title pages of copies of the documentation handed over to the customer are certified by the stamp of the organization that prepared this documentation.

8.8 The composition of the project documentation, as well as the composition of the reporting technical documentation based on the results of engineering surveys, is given in a statement executed in accordance with Form 14 (Appendix C) on A4 sheets.

The statement contains a sequential list of volumes of design or reporting technical documentation for engineering surveys.

The first sheet of the statement is drawn up with the main inscription in form 5 (Appendix G), the subsequent ones - in form 6 (Appendix G).

The composition of the design documentation is assigned a designation consisting of the basic designation of the design documentation and through the hyphen cipher "SP".

Example - 2345-SP

When stitching a statement into a separate volume, it is drawn up with a cover and a title page in accordance with 8.3 and 8.4. The volume number on the cover and title page is not indicated.

The composition of the reporting technical documentation based on the results of engineering surveys is assigned a designation consisting of the basic designation of the documentation and through the hyphen of the cipher "SD".

Example - 2344-SD

Codes of sections of design documentation

A.1 The codes of the sections of the design documentation for capital construction facilities for production and non-production purposes are given in Table A.1.

Table A.1

Number
section

Cipher
section

Explanatory note

Planning organization of the land plot

Architectural solutions

Constructive and space-planning solutions

Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions

Project for the organization of work on the demolition or dismantling of capital construction objects

List of measures for environmental protection

Measures to ensure access for people with disabilities

Requirements for ensuring the safe operation of a capital construction facility

Estimates for the construction of capital construction projects

Measures to ensure compliance with energy efficiency requirements and the requirements for equipping buildings, structures and structures with metering devices for used energy resources

The list of civil defense measures, measures to prevent natural and man-made emergencies, measures to counter terrorism

Other documentation established by legislative acts of the Russian Federation

Note - The numbers of sections 10 1 and 11 1 are allowed to be given in the form of 10 (1), 11 (1) or 10-1, 11-1.

A.2 The codes of sections of the design documentation for linear objects are given in Table A.2.

Table A.2

Number
section

Name of the section of the project documentation

Cipher
section

Explanatory note

Right of way project

Technological and constructive solutions for a linear object. Artificial constructions

Buildings, structures and structures included in the infrastructure of a linear object *

Construction organization project

Project for the organization of work on the demolition (dismantling) of a linear facility

Environmental protection measures

Fire safety measures

Construction estimate

Other documentation in cases stipulated by federal laws, including:

The list of civil defense measures, measures to prevent natural and man-made emergencies, measures to counter terrorism

Industrial Safety Declaration of Hazardous Production Facilities

Declaration of safety of hydraulic structures

* The design documentation of buildings, structures and structures is developed in accordance with the composition of the documentation according to Table A.1.

Note - If necessary, the codes of sections of the project documentation may be designated by letters of the Latin alphabet in accordance with the rules established in the standards of organizations.

Stamps of the main sets of working drawings

Table B.1

Name of the main set of working drawings

Note

General layout and transport facilities

When combining working drawings of the master plan and transport structures

General plan

Car roads

Railways

Transport structures

When combining working drawings of roads, railways and other roads

Architectural and construction solutions

When combining working drawings of architectural and structural solutions (except for KM)

Architectural solutions

Interiors

Working drawings can be combined with the main set of the AR or AC brand

Reinforced concrete structures

Metal structures

Metal detailing structures

Wooden structures

Hydraulic solutions

Anti-corrosion protection of buildings and structures

Power supply

Outdoor electric lighting

Power equipment

Electric lighting (interior)

External water supply networks

External sewerage networks

External water supply and sewerage networks

When combining working drawings of external water supply and sewerage networks

Internal water supply and sewerage systems

Firefighting

Heating, ventilation and air conditioning

Air supply

Dust extraction

Cold supply

Thermal mechanical solutions

Boiler houses, thermal power plants, etc.

Thermal mechanical solutions for heating networks

Wired communications *

The names of the main sets and designations of brands are taken according to Appendix A of GOST R 21.1703

Radio communication, radio broadcasting and television

Fire alarm

Security and burglar-fire alarms

Outdoor gas pipelines

Gas supply (internal devices)

Production technology

Technological communications

When combining working drawings of all technological communications

Corrosion protection of technological devices, gas ducts and pipelines

Thermal insulation of equipment and pipelines

Integrated automation

When combining working drawings for the automation of various technological processes and engineering systems

Automation +

The names of the main sets and designations of brands are taken according to Appendix A of GOST 21.408

Irrigation and drainage linear structures *

The names of the main sets and designations of brands are taken according to Appendix A GOST 21.709

* General names of objects are given.

Notes (edit)

1 If necessary, additional marks of the main sets of working drawings can be assigned. At the same time, it is recommended to include no more than three capital letters of the Russian alphabet in the stamp, corresponding, as a rule, to the initial letters of the name of the main set of working drawings.

2 If necessary, the marks of the main sets of working drawings may be designated by letters of the Latin alphabet or digital codes in accordance with the rules established in the standards of organizations.

Codes of attached documents

Table B.1

Name of the attached document

Specification of equipment, products and materials

General sketch drawing of a non-standard product

Working drawing of a construction product

Questionnaire, dimensional drawing

Local estimates

Calculations *

* Calculations, as a rule, are not included in the working documentation, unless otherwise specified in the agreement (contract) and design assignment.

Notes (edit)

1 Codes for other types of attached documents are given in the relevant SPDS standards or standards of organizations.

2 It is allowed, if necessary, to designate the ciphers of the attached documents with letters of the Latin alphabet in accordance with the rules established in the standards of organizations.

Appendix D
(required)

General data sheet for working drawings

Form 1 - List of working drawings of the main set

Specification Sheet

D.1 In the list of working drawings of the main set indicate:

In the "Sheet" column - the serial number of the sheet of the main set of working drawings;

In the column "Name" - the name of the images placed on the sheet, in accordance with the names given in the title block of the sheet;

In the column "Note" - additional information, for example, about the changes made to the working drawings of the main set.

D.2 The specification sheet indicates:

In the "Sheet" column - the number of the sheet of the main set of working drawings, on which the specification is placed;

In the column "Name" - the name of the specification in strict accordance with its name indicated on the drawing;

In the "Note" column - additional information, including about changes to the specifications.

Form 2 - List of main sets of working drawings

List of reference and attached documents

List of documents for the main set of working drawings

D.3 In the list of the main sets of working drawings indicate:

In the column "Designation" - the designation of the main set of working drawings and, if necessary, the name or distinctive index of the organization that issued the document;

In the column "Name" - the name of the main set of working drawings;

In the "Note" column - additional information, including about changes in the composition of the main sets of working drawings.

D.4 The list of reference and attached documents indicate:

In the column "Designation" - the designation of the document and, if necessary, the name or distinctive index of the organization that issued the document;

In the column "Name" - the name of the document in strict accordance with the name indicated on the title page or in the title block;

In the "Note" column - additional information, including about the changes made to the recorded documents that are part of the working documentation. For documents in electronic form, indicate, if necessary, the identifier of the file (files).

D.5 In the list of documents of the main set of working drawings indicate:

In the column "Designation" - the designation of the document;

In the column "Name" - the name of the document in accordance with the name indicated in the title block. For graphic documents consisting of several sheets, the names of the images placed on each sheet are also given, in accordance with the names given in the title block of the sheet;

In the "Note" column - additional information, including about the changes made to the recorded documents, and, if necessary, the total number of sheets of the document. For documents in electronic form, indicate, if necessary, the identifier of the file (files).

D.6 The sizes of the columns of statements, if necessary, can be changed at the discretion of the developer.

D.7 It is allowed, if necessary, to include additional columns (columns) in the statement, for example, “No. sheets ", etc.

D.8 When filling out the sheets in an automated way, horizontal lines delimiting the lines are allowed not to be drawn. In this case, it is necessary to observe an interval of at least one printing bit between the texts of adjacent lines.

Appendix D
(required)

The list of ESKD standards to be taken into account when performing graphic
and text documentation for construction

Table E.1

Designation and title of the standard

Conditions of application of the standard

GOST 2.004-88 Unified system for design documentation. General requirements for the implementation of design and technological documents on printing and graphic devices for computer output

GOST 2.051-2006 Unified system for design documentation. Electronic documents. General Provisions

GOST 2.052-2006 Unified system for design documentation. Electronic model of the product. General Provisions

GOST 2.101-68 Unified system for design documentation. Types of products

GOST 2.102-68 Unified system for design documentation. Types and completeness of design documents

Taking into account the provisions of GOST 21.501 related to the implementation of drawings of building products

GOST 2.105-95 Unified system for design documentation. General requirements for text documents

Subject to the provisions of clauses 4, 5 and 8 of this standard

GOST 2.109-73 Unified system for design documentation. Basic requirements for drawings

GOST 2.113-75 Unified system for design documentation. Group and basic design documents

Taking into account the provisions of GOST 21.501

GOST 2.114-95 Unified system for design documentation. Technical conditions

Subject to the provisions of 5.2.1, 5.2.2, 5.2.5 - 5.2.7 and section 8 of this standard.

The provisions of 3.7.1 and 3.8 of GOST 2.114 do not take into account

GOST 2.301-68 Unified system for design documentation. Formats

Taking into account the requirements of the relevant SPDS standards

GOST 2.302-68 Unified system for design documentation. The scale

Subject to the provisions of 5.1.6 of this standard

GOST 2.303-68 Unified system for design documentation. Lines

Subject to the provisions of 5.1.3 of this standard

GOST 2.304-81 Unified system for design documentation. Drawing fonts

Subject to the provisions of 5.1.5 of this standard

GOST 2.305-2008 Unified system for design documentation. Images - views, sections, sections

Subject to the provisions of 5.5 of this standard

GOST 2.306-68 Unified system for design documentation. Designations of graphic materials and rules for their application in drawings

Taking into account the provisions of GOST 21.302, tables 4 and 5

GOST 2.307-2011 Unified system for design documentation. Dimensioning and limit deviations

Subject to the provisions of 5.4.1 - 5.4.4 of this standard

GOST 2.308-2011 Unified system for design documentation. Specifying Tolerances of the Shape and Location of Surfaces

Taking into account the provisions of GOST 21.113

GOST 2.309-73 Unified system for design documentation. Surface roughness designation

GOST 2.310-68 Unified system for design documentation. Application on drawings of designations of coatings, thermal and other types of processing

GOST 2.311-68 Unified system for design documentation. Thread Image

GOST 2.312-72 Unified system for design documentation. Conditional images and symbols of welded joints

GOST 2.313-82 Unified system for design documentation. Conditional images and designations of permanent connections

GOST 2.314-68 Unified system for design documentation. Instructions on the drawings on marking and branding of products

GOST 2.315-68 Unified system for design documentation. Simplified and schematic illustrations of fasteners

GOST 2.316-2008 Unified system for design documentation. Rules for applying inscriptions, technical requirements and tables on graphic documents. General Provisions

Subject to the provisions of 5.4.5 - 5.4.7 of this standard

GOST 2.317-2011 ESKD. Axonometric projections

GOST 2.501-88 ESKD. Accounting and storage rules

In the part of the form of the inventory book, subscriber card and instructions for folding drawings

GOST 2.511-2011 Unified system for design documentation. Rules for the transfer of electronic design documents. General Provisions

GOST 2.512-2011 Unified system for design documentation. Rules for the execution of a data package for the transfer of electronic design documents. General Provisions

Note - The conditions for the application of the ESKD standards of classification group 7 are determined by the SPDS standards, which provide references to these standards.

List of allowed abbreviations of words used in graphic documents
(addition to
GOST 2.316 )

Table E.1

Full name

Reduction

Full name

Reduction

Highway

Equipment

Canceled

Anti-seismic seam

Architect

Asphalt concrete

calc. load

Concrete, concrete

Sanitary-technical

dignity tech.

Ventilation chamber

ventilation chamber

Toilet

dignity node.

Capacity

Roomy (c, t)

Chief Engineer

Ch. Ing. (O)

Well

Chief engineer (architect) of the project

ISU (GAP) (o)

Snow

Chief Specialist

Ch. specialist. (O)

Expansion joint

Technological

Expansion joint

Director

Document

doc. (then)

Rail head level

lvl. r. (and)

Admissible

Ground (ground) water level

Railway

Ground level

Railway

Clean floor level

Reinforced concrete, reinforced concrete

Manager

Fundamental

Insulation, insulating

Cement, cement

Institute

Cement concrete

Design

Coefficient

Efficiency

Plaster

Staircase, staircase

Crushed stone, crushed stone

Workshop (in design organizations)

Electric

Materials (edit)

materials (t)

el-t (and, t)

Mounting

normal load

Notes (edit)

1 Abbreviations marked with a (o) are used only in the title block; (t) - in tables; (c) - with numbers or codes; (and) - on graphic images

2 Abbreviations of words indicated in this table and GOST 2.316 may be indicated in text documents, divided into columns.

Appendix G
(required)

Title blocks and additional columns to them

Form 3 - For sheets of the main sets of working drawings, graphic documents of project documentation and graphic documents for engineering surveys

Note - For graphic documents on engineering surveys, the entry “N. counter." ("Norm-control") in the title block is allowed not to be performed.

Form 4 - For drawings of building products (first sheet)

Form 5 - For sketch drawings of general views of atypical products, all types of text documents (first or title page)

Note - The main inscription in form 5 is allowed to be used for graphic documents on engineering surveys that are not used in design as a graphic basis.

Form 6 - For drawings of building products, sketch drawings of general types of atypical products and all types of text documents (subsequent sheets)

Note - The main inscription in form 6 is allowed to be used for subsequent sheets of graphic documents on engineering surveys that are not used in design as a graphic basis.

In the columns of the main inscription and additional columns to it (column numbers are indicated in brackets), the following is given:

Column 1 - designation of a document, including a text or graphic document of a section, a subsection of project documentation, the main set of working drawings, a product drawing, etc .;

In column 2 - the name of the enterprise and, if necessary, its part (complex), housing and civil complex or other construction object, which includes the building (structure), or the name of the microdistrict;

Column 3 - the name of the building (structure) and, if necessary, the type of construction (reconstruction, technical re-equipment, overhaul);

Column 4 - the name of the images placed on this sheet, in accordance with their name in the drawing. If one image is placed on a sheet, it is allowed to give its name only in column 4.

The names of specifications and other tables, as well as textual instructions relating to images, are not indicated in column 4 (except for cases when specifications or tables are made on separate sheets). On the sheet (s) of general data on working drawings in column 4, write "General data". In the case provided for in 5.2.3, in column 4, the name of the document or atypical product is given;

Column 5 - the name of the product and / or the name of the document;

Column 6 - symbolic designation of the type of documentation: P - for project documentation, R - for working documentation.

For other types of documentation, the column is not filled out or the conventions established in the organization's standards are given;

Column 7 is the ordinal number of the sheet of the document. On documents consisting of one sheet, the column is not filled;

Column 8 - the total number of sheets of the document. The column is filled out only on the first sheet;

In column 9 - the name or distinctive index of the organization that developed the document;

Column 10 - the nature of the work performed by the person signing the document in accordance with Forms 3 - 5. In free lines, at the discretion of the design organization, the positions of specialists and managers responsible for the development and verification of the document are given. In the line under the entry "Developed" instead of the position, it is allowed to give the entry "Checked".

The signatures of the person who developed this document and the supervisor are required.

The bottom line contains the position of the person who approved the document, for example, the chief engineer (architect) of the project, the head of the department, or another official responsible for this document (sheet).

Signatures of the person responsible for the preparation of design or working documentation (chief engineer (architect) of the project) are mandatory on the general data sheets for working drawings, the most significant sheets of the graphic part of the project documentation and working drawings;

In columns 11 - 13 - the names and signatures of the persons indicated in column 10, and the date of signing. Signatures of other officials and approving signatures are placed on the sheet filing field;

In columns 14 - 19 - information about the changes that are filled in in accordance with 7.3.21;

In column 20 - the inventory number of the original;

In column 21 - the signature of the person who accepted the original for storage, and the date of acceptance;

In column 22 - the inventory number of the original of the document, instead of which a new original was issued;

In column 23 - designation of the material of the part (the column is filled only in the drawings of the parts);

In column 24 - the mass of the product shown in the drawing, in kilograms without indicating the unit of mass. The mass of the product in other units of mass is given with the indication of the unit of mass.

Example- 2.4 t;

- in column 25 - scale (put down in accordance with GOST 2.302);

Column 26 - designation of the sheet format in accordance with GOST 2.301. For an electronic document, indicate the sheet size on which the image will correspond to the established scale;

Column 27 - the short name of the customer organization.

Notes (edit)

1 In columns 13, 19, 21, when indicating the calendar date on paper, the year is indicated with the last two digits, for example 06.02.12.

2 Column 27, indicated by a dashed line, is entered if necessary.

3 Columns "Agreed" (10 - 13), located on the filing field, may be shown only on those sheets where it is necessary. Repeat them if necessary.

4 It is allowed, if necessary, to change the location and size of additional columns placed on the filing field, in accordance with GOST 2.004.

Appendix I
(required)

Location of the title block, additional columns to it
and sizes of frames on sheets

Figure I.1 - Location of the title block, additional columns and frame sizes

Figure I.2 - Allowed location of the main inscription on an A4 sheet

Appendix K
(required)

Specifications

Form 7 - Specification

Form 8 - Group Specification

K.1 The specifications indicate:

In the column "Pos." - positions (brands) of structural elements, installations;

In the column "Designation" - the designation of the main documents for the elements of structures, equipment, products or standards (technical conditions) for them recorded in the specification;

In the column "Name" - the name of structural elements, equipment, products, materials and their designations (brands), as well as, if necessary, the technical characteristics of equipment and products. It is allowed to indicate the name once and underline it for a group of elements of the same name.

The specification records the materials that are directly included in the specified design, product, etc.

In an electronic specification, the horizontal bar included in the designation of materials (rolled products, pipes, etc.) may be replaced with a forward slash (/);

In the column "Qty." form 7 - the number of elements.

In the column "Qty." Form 8 - instead of ellipsis, write down "according to the scheme", "on the floor", etc., and below - the ordinal numbers of layouts or floors;

In the column "Mass unit, kg" - weight in kilograms. It is allowed to give the mass in tons, but with the indication of the unit of mass;

In the "Note" column - additional information, for example, the unit of mass.

K.2 The dimensions of the graphs of the specification at the discretion of the developer, if necessary, can be changed.

K.3 When filling out the specifications in an automated way, the lines delimiting the horizontal lines may not be drawn.

Permission to make changes

Form 9 - Permission to amend (first sheet)

Form 9a - Permission to amend (subsequent sheets)

L.1 In the columns of permission indicate:

In column 1 - the designation of the permit, consisting of the serial number of the permit according to the permit registration book in accordance with GOST R 21.1003 and, separated by a separating character (hyphen, slash, etc.) - the last two digits of the year.

Example - 15-12; 15/12;

Column 2 - designation of the document to which the change is made;

Column 3 - the name of the construction object;

Column 4 is the next serial number assigned to the changes that are made to the document by one permit. It is indicated for the entire document, regardless of how many sheets it is made on. The serial numbers of the changes are indicated in Arabic numerals;

Column 5 - numbers of sheets of the document, which are amended;

Column 6 - the content of the change in the form of a text description and / or graphic image;

Column 7 - the code of the reason for the change in accordance with Table L.1.

Table L.1

It is allowed not to indicate the change reason code. In this case, the column is crossed out;

Column 8 - additional information;

In columns 9 - 11 - the names of the persons signing the permit, their signatures and the date of signing;

Column 12 - the name of the design organization and the subdivision (department) that issued the permit;

In columns 13 - 16 - the name of the relevant divisions or organizations, the positions and names of the persons with whom the permission is coordinated in the prescribed manner, their signatures and the date of signing, as well as the signature of the controller;

Column 17 - serial number of the permit sheet. If the permit consists of one sheet, the column is not filled out;

Column 18 - the total number of permission sheets.

K.2 It is allowed to use Form 9 for subsequent sheets of permission.

Notes (edit)

1 It is allowed to supplement the form with columns for identification of the permit in electronic form. The design organization sets the location and size of the graphs independently.

2 In columns 11, 16, when indicating the calendar date on paper, the year is indicated with the last two digits.

Change registration tables

Form 10 - Table of registration of changes (text document)

M.1 The dimensions of the table columns in Form 10 are established by the developer of the document.

M.2 In the columns of the table of registration of changes indicate:

In the column "Change." - serial number of the document change;

In the columns "Numbers of sheets (pages) changed, replaced, new, canceled" - numbers of sheets (pages), respectively, changed, replaced, added and canceled under this permission.

When replacing all sheets of the original (with the next serial number of the change in the document), indicate “All” in the column “replaced”. The rest of the columns are dash;

In the column "Total sheets (pages) in the doc." - the number of sheets (pages) in the text document after making changes;

In the column "Doc. Number" - designation of permission;

M.3 When replacing all sheets of the original in the table of registration of changes in form 10, the numbers of changes and other data relating to all previously made changes to the document are not reproduced.

Form 11 - Change registration table (title page and cover)

M.4 In the columns of the table of registration of changes in form 11 indicate:

In the column "Change." - serial number of changes to a document or volume;

In the column "Doc." - designation of permission to make changes in accordance with the instructions in Appendix L;

In the column "Sign." - signature of the person responsible for the correctness of the amendment;

In the "Date" column - the date of the change.

M.5 If necessary, the number of lines can be increased.

M.6 When replacing a document or volume in the table of registration of changes in form 11, the numbers of changes and other data relating to all previously made changes are not reproduced.

Cover

H.1 The following details are given on the cover:

Field 5 - the name of the capital construction object and, if necessary, the type of construction. The name of the construction object on the cover must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);

Field 9 - volume number according to the list "Composition of design documentation" or "Composition of reporting documentation based on the results of engineering surveys" (if any);

Field 10 - year of issue of the document;

Field 11 - for placing the table of registration of changes in form 11 of Appendix M (if necessary).

H.2 The sizes of fields 1 - 11 are set arbitrarily; the lines of the fields indicated in the form are not applied; the numbers and names of the fields are not indicated.

H.3 It is allowed to include additional details and attributes on the cover in accordance with the requirements established in the organization's standards.

H.4 Cover sizes are taken depending on the format of the volume, folder or album to which it is executed.

Title page

P.1 The following details are given on the title page:

Field 1 - abbreviated, and in its absence - the full name of the parent organization (if any); indicate, as a rule, for government organizations;

Field 2 - logo (optional), full name of the organization that prepared the document;

Field 3 - number and date of issue of the certificate of admission to the relevant types of work (for the preparation of project documentation or for conducting surveys) that affect the safety of the capital construction facility;

Field 4 - short name of the ordering organization (if necessary). The name is indicated in the form: "Customer - the name of the customer organization";

Field 5 - the name of the capital construction object and, if necessary, the type of construction. The name of the construction object on the title page must correspond to the information provided

in columns 2 and 3 of the main inscription (see Appendix G);

Field 6 - type of documentation (if necessary);

Field 7 - name of the document;

Field 8 - document designation;

Field 9 - volume number according to the list "Composition of design documentation" or "Composition of reporting documentation on engineering surveys" (if any);

Field 10 - positions of persons responsible for the development of the document;

Field 11 - signatures of the persons indicated in field 10, performed in accordance with GOST R 6.30. In this field, a certifying seal of the organization that prepared the document is also affixed;

Field 12 - initials and surnames of the persons indicated in field 10;

Field 13 - year of issue of the document;

Field 14 - for placing the table of registration of changes in form 11 of Appendix M (if necessary);

Field 15 - for additional columns of the title block in accordance with Appendix G. It is allowed to provide information contained in these columns in a different form in accordance with the requirements established in the organization's standards.

P.2 The sizes of fields 1 - 14 are set arbitrarily; the lines of these fields indicated in the form are not applied, the numbers and names of the fields are not indicated.

P.3 It is allowed to draw up a title page without frames.

Clause 4 It is allowed to provide additional details and attributes on the title page in accordance with the requirements established in the organization's standards.

A.5 The dimensions of the title page are taken depending on the format of the volume, folder or album to which it is executed.

Appendix P
(reference)

Examples of execution of title pages *

* These examples are indicative only.

Figure R.1 - An example of the execution of the title page of a volume of design documentation

Figure R.2 - An example of the execution of the title page of a volume (folder) of working documentation

The composition of the project documentation.
The composition of the reporting documentation based on the results of engineering surveys

C.1 The statement indicates:

In the column “Volume number” - the serial number of the volume or the number of the volume, including the number of the section and, if available, the number of the subsection, part, book (see 4.1.1, 4.1.3), separated by dots.

Example - 1, 2.1, 2.2, 5.5.1, 5.5.2;

- in the column "Designation" - the designation of the document (volume) indicated on its title page, and, if necessary, the name or distinctive index of the organization that issued the document;

In the column "Name" - the name of the document (volume) in strict accordance with the name indicated on its title page;

In the column "Note" - additional information, including the changes made.

C.2 The sizes of the columns of the statement at the discretion of the developer, if necessary, can be changed.

C.3 When filling out the sheet in an automated way, horizontal lines delimiting the lines are allowed not to be drawn.

Bibliography

Key words: design documentation, working documentation, basic requirements, main set of working drawings, title block, amendments, title page

GOST R 21.1101-2013

Group Ж01

NATIONAL STANDARD OF THE RUSSIAN FEDERATION

System of design documents for construction

BASIC REQUIREMENTS FOR DESIGN AND WORKING DOCUMENTATION

System of design documents for construction. Main requirements for design and working documents

OKS 01.100.30

Introduction date 2014-01-01

Foreword

1 DEVELOPED by the Open Joint Stock Company Center for Methodology of Rationing and Standardization in Construction (OJSC TsNS)

2 INTRODUCED by the Technical Committee for Standardization TC 465 "Construction"

3 APPROVED AND PUT INTO EFFECT by the Order of the Federal Agency for Technical Regulation and Metrology of June 11, 2013 N 156-st

4 This standard implements the norms of the Town Planning Code of the Russian Federation of December 29, 2004 N 190-FZ

5 REPLACE GOST R 21.1101-2009

The rules for the application of this standard are set out in GOST R 1.0-2012 (section 8). Information on changes to this standard is published in the annual (as of January 1 of the current year) information index "National Standards", and the official text of changes and amendments is published in the monthly information index "National Standards". In case of revision (replacement) or cancellation of this standard, the corresponding notice will be published in the next issue of the monthly information index "National Standards". Relevant information, notice and texts are also posted in the public information system - on the official website of the Federal Agency for Technical Regulation and Metrology on the Internet (gost.ru)

Corrected by the manufacturer of the database

1 area of ​​use

This standard establishes the basic requirements for design and working documentation for the construction of objects for various purposes.

NOTE In this standard, the concept of "construction" includes new construction, reconstruction, technical re-equipment and major repairs of capital construction projects.

The general rules for the execution and completion of graphic and textual documentation established in 4.1 and in sections 5 and 8, and the rules for making changes established in section 7, also apply to reporting technical documentation based on the results of engineering surveys for construction.

2 Normative references

This standard uses normative references to the following standards:

GOST R 6.30-2003 Unified documentation systems. Unified system of organizational and administrative documentation. Requirements for paperwork

GOST R 21.1001-2009 System of design documentation for construction. General Provisions

GOST R 21.1002-2008 System of design documentation for construction. Norm control of design and working documentation

GOST R 21.1003-2009 System of design documentation for construction. Accounting and storage of project documentation

GOST R 21.1703-2000 System of design documentation for construction. Rules for the implementation of working documentation for wired communication

GOST 2.051-2006

GOST 2.052-2006

GOST 2.106-96 Unified system for design documentation. Text documents

GOST 2.109-73

GOST 2.305-2008

GOST 2.308-2011 Unified system for design documentation. Indication of tolerances for the shape and location of surfaces

GOST 2.309-73 Unified system for design documentation. Surface roughness symbols

GOST 2.312-72

GOST 2.314-68 Unified system for design documentation. Instructions on the drawings on marking and branding of products

GOST 2.317-2011 Unified system for design documentation. Axonometric projections

GOST 2.501-88 Unified system for design documentation. Accounting and storage rules

GOST 21.110-95 System of design documentation for construction. Rules for the implementation of the specification of equipment, products and materials

GOST 21.113-88 System of design documentation for construction. Accuracy characteristic designations

GOST 21.114-95 System of design documentation for construction. Rules for the execution of sketch drawings of general views of atypical products

GOST 21.302-96 System of design documentation for construction. Graphic symbols in the documentation for engineering and geological surveys

GOST 21.408-93 System of design documentation for construction. Rules for the implementation of working documentation for the automation of technological processes

GOST 21.501-2011 System of design documentation for construction. Rules for the implementation of working documentation for architectural and structural solutions

GOST 21.709-2011 System of design documentation for construction. Rules for the implementation of working documentation for linear structures of irrigation and drainage systems

Note - When using this standard, it is advisable to check the validity of reference standards in the public information system - on the official website of the Federal Agency for Technical Regulation and Metrology on the Internet or according to the annual information index "National Standards", which was published as of January 1 of the current year, and by the editions of the monthly information index "National Standards" for the current year. If the referenced standard to which an undated reference is given has been replaced, it is recommended that the current version of that standard be used, subject to any changes made to that version. If the referenced standard to which the dated reference is given is replaced, then it is recommended to use the version of that standard with the above year of approval (acceptance). If, after the approval of this standard, a change is made to the referenced standard to which the dated reference is given, affecting the provision to which the reference is made, then that provision is recommended to be applied without taking into account that change. If the reference standard is canceled without replacement, then the provision in which the reference to it is given is recommended to be applied in the part that does not affect this reference.

3 Terms, definitions and abbreviations

3.1 Terms and definitions

In this standard, the terms according to GOST R 21.1001, GOST R 21.1002, GOST R 21.1003 are used, as well as the following terms with the corresponding definitions:

3.1.1 main inscription: A set of information about the project document contained in the columns of the table of the established form, placed on the sheets of design and working documentation.

3.1.2 main set of working drawings: A graphic document containing the necessary and sufficient information in the form of drawings and diagrams, intended for the production of construction and installation work of a certain type (brand).

3.1.3 full set of working documentation: A set of basic sets of working drawings required for the construction of a building or structure, supplemented by attached and referenced documents.

3.1.4 Brand: An alphabetic or alphanumeric index included in the designation of working documentation and determining its relation to a certain type of construction and installation work, or designating the main distinctive features of building structures and their elements.

3.1.7 atypical product: A product (structure, device, mounting block) of technological systems, internal and external systems and networks of engineering and technical support of buildings and structures, first developed and manufactured, as a rule, at the installation site (in the procurement workshop of the installation organization).

3.1.12 equipment: Technological equipment (machines, apparatus, mechanisms, lifting and other technical means ensuring the appropriate technological process), as well as engineering equipment of buildings and structures, providing safe and favorable conditions for the life of people.

3.1.14 plan: Top view or horizontal section of a building or structure.

3.1.15 facade: Orthogonal projection of the outer wall of a building or structure onto a vertical plane.

Note - There are main, side, courtyard facades, etc.

3.1.20 designation: Attributes of the document, which is its identification (distinctive) index.

Note - Each document is assigned a designation, which is recorded in established places (in the main inscriptions, on title pages, etc.).

3.2 Abbreviations

The following abbreviations are used in this standard:

DE - electronic document;

ESKD - Unified system for design documentation;

CAD - computer-aided design system (s);

SPDS - System of design documentation for construction;

EDMS - system (systems) of electronic document management.

4 General requirements for the composition and completion of design and working documentation

4.1 Project documentation

4.1.1 The composition of the design documentation for capital construction projects and the requirements for its content are established by legislation approved by the Government of the Russian Federation by the Regulations and normative legal acts of federal executive bodies.

Design documentation is completed, as a rule, in separate sections and subsections established by the Regulations. The names and codes of sections of the design documentation are given in Tables A.1 and A.2 (Appendix A).

In paper form, project documentation is completed in volumes in accordance with 4.1.4, 4.1.5 and section 8.

With a large volume (in paper form) of a section or subsection, as well as, if necessary, in other cases (for example, when attracting subcontractors), it is allowed to divide it into parts, and parts, if necessary, into books. Each part and book is completed separately. All parts and books are given names that reflect the content of the parts or books. Subsections, parts and books are assigned sequential numbers in Arabic numerals within the section, subsection or part, respectively.

4.1.2 Each section, subsection, part and, if necessary, the book, complete in the volume, as well as each text and graphic document included in the volume, is assigned an independent designation, which is indicated on the cover, title page and / or in the title block, as well as in the headers and footers of text documents performed without title blocks.

4.1.3 The section designation includes the basic designation established according to the system operating in the design organization, and through a hyphen * - the code of the design documentation section. The basic designation includes, for example, the number of the agreement (contract) and / or the code of the construction object (digital, alphabetic or alphanumeric). It is allowed to include other codes used in CAD and EDMS in the basic designation.
_______________
* It is allowed to use other separators in the designation, for example, a dot, a slash, etc.

If a section is divided into parts, then the designation of the part is made up of the designation of the section to which the part number is added.

Examples of

1 2345-PZ - Section 1. Explanatory note.

2 2345-PZU1 - Section 2. Scheme of the planning organization of the land plot. Part 1. General information.

3 2345-PZU2 - Section 2. Scheme of the planning organization of the land plot. Part 2. Solutions for inland rail transport.

If a part is divided into books, then the designation of the book is made up of the designation of the part, to which the number of the book is added through a dot.

The subsection designation is made up of the section designation to which the subsection number is added.

If a subsection is divided into parts, then the designation of the part is made up of the designation of the subsection, to which the part number is added through a dot. If the part is divided into books, then the designation of the book (if necessary) is made up of the designation of the part, to which the book number is added through a dot.

Examples of

1 2345-IOS4.1.1 - Section 5. Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 1. Basic decisions.

2 2345-IOS4.1.2 - Section 5. Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 1. Heating, ventilation and air conditioning. Book 2. Automation systems for heating, ventilation and air conditioning.

3 2345-IOS4.2 - Section 5. Information about engineering equipment, networks of engineering and technical support, a list of engineering measures, the content of technological solutions. Subsection 4. Heating, ventilation and air conditioning, heating networks. Part 2. Heating networks.

Based on the provisions of 4.1.1-4.1.3, 4.2.3-4.2.7, standards of organizations can be developed for the designation of text and graphic documents that are part of the design and working documentation, taking into account the specifics of the designation depending on the volume of documentation, the conditions of document flow and used CAD and EDMS.

4.1.4 Text and graphic materials included in the general case are completed in the following order:

Cover;

Title page;

Statement "Composition of design documentation".

Note - It is allowed not to include the list "Composition of design documentation" in the composition of each volume, but to complete it with a separate volume;

Text part;

Graphic part (drawings and diagrams).

The rules for the design of the cover, title page, volume content and the list "Composition of project documentation" are given in section 8.

4.1.5 The number of sheets included in the volume is determined from the need to ensure the convenience of work, as a rule, no more than 300 sheets of A4 format in accordance with GOST 2.301 or an equivalent number of sheets of other formats.

4.1.6 General requirements for the implementation of graphic documentation are given in section 5.

4.1.7 Text documents containing mainly continuous text (including the text parts of sections and subsections of design documentation) are performed in accordance with GOST 2.105, taking into account 5.1, 5.2 of this standard.

4.1.8 It is allowed to execute text documents specified in 4.1.7, without main inscriptions, additional columns to them and frames. In this case:

On the first sheet, a list of performers is given, in which the positions, initials and surnames of the persons who took part in the development, control and approval of the text document are indicated, and provide places for signatures and dates of signing. On the second and, if necessary, on subsequent sheets, the content (table of contents) is placed, including the numbers (designations) and names of sections, subsections and applications of the text document, indicating the numbers of sheets (pages);

At the top (header) of each sheet, indicate the designation of the document: in the left corner (for single-sided printing) or the right corner of even-numbered pages and the left corner of odd-numbered pages (for double-sided printing);

At the bottom (footer) of each sheet indicate: the logo and name of the organization that prepared the document, the name of the document, the number of the sheet (page) of the document (in the lower right corner - for single-sided printing or in the left corner of even pages and the right corner of odd pages - for duplex) and, if necessary, the document version number, file identifier (name), and other information. It is allowed to show the logo and the name of the organization in the header;

Data on changes shall be indicated in accordance with 7.3.

4.1.9 Calculations of design and technological solutions, which are a mandatory element of the preparation of design documentation, are not included in the design documentation. They are drawn up in accordance with the requirements for text documents and stored in the archive of the design organization. Calculations are submitted to the customer or to the examination authorities at their request.

4.2 Working documentation

4.2.1 The composition of the working documentation handed over to the customer includes:

Working drawings, combined into the main sets of working drawings by brands. The brands of the main sets of working drawings are shown in Table B.1 (Appendix B);

Attached documents developed in addition to the working drawings of the main set.

4.2.2 The main sets of working drawings include general data on working drawings, drawings and diagrams provided for by the relevant SPDS standards.

4.2.3 The main set of working drawings of any brand can be divided into several basic sets of the same brand (with the addition of a serial number) in accordance with the process of organizing construction and installation work.

Example - AP1; AP2; KZh1; KZh2.

4.2.4 Each main set of working drawings is assigned a designation, which includes a basic designation, installed according to the system in force in the organization, and through a hyphen - the brand of the main set.

Example - 2345-12-AR,

where 2345-12 is the basic designation. The basic designation includes, for example, the number of the agreement (contract) and / or the code of the construction object (see 4.1.3), as well as the number of the building or structure according to the master plan *;
_______________
* For working drawings of linear structures, a general plan, external communications, this part of the basic designation is excluded or replaced with zeros.

AR - brand of the main set of working drawings.

4.2.5 It is allowed to design the main set of working drawings as separate documents with the assignment of a designation to them, consisting of a basic designation, a brand of the main set, and adding a serial number of the document through a dot in Arabic numerals.

Example - 2345-12-EO.1; 2345-12-EO.2,

where 2345-12 is the basic designation;

EO - brand of the main set of working drawings;

1, 2 - serial numbers of documents of the main set of working drawings.

The first document in such a design of the main set of working drawings should be general data on working drawings.

4.2.6 The attached documents include:

Working documentation for construction products;

Sketch drawings of general types of non-standard products, performed in accordance with GOST 21.114;

Specification of equipment, products and materials, carried out in accordance with GOST 21.110;

Questionnaires and dimensional drawings carried out in accordance with the data of manufacturers (suppliers) of equipment;

Local estimate;

Other documents stipulated by the relevant SPDS standards.

The specific composition of the attached documents and the need for their implementation are established by the relevant SPDS standards and design assignment.

The attached documents are transferred by the design organization to the customer simultaneously with the main set of working drawings in the amount set for working drawings.

4.2.7 Each attached document is assigned the designation of the basic set with the addition of the attached document through a cipher. The codes of the attached documents are given in Table B.1 (Appendix B).

Example - 2345-12-EO.C,

where 2345-12-EO - designation of the main set of working drawings;

C - code of the specification of equipment, products and materials.

If there are several attached documents of the same type, a serial number or, through a hyphen, a product brand (for product drawings) is added to their designation.

Example - 2345-12-VK.N1; 2345-12-VK.N2, 2345-12-KZh.I-B1, 2345-12-KZh.I-B2

4.2.8 In working drawings, it is allowed to use standard building structures, products and assemblies by reference to documents containing working drawings of these structures and products. Reference documents include:

Standards, which include drawings intended for the manufacture of products;

Drawings of typical structures, products and assemblies *.
_______________
* If necessary, drawings of typical structures, products and assemblies are recorded in the "Attached documents" section (as a rule, without changing the designation) and transferred to the customer in accordance with 4.2.6.

Reference documents are not included in the composition of the working documentation handed over to the customer. The project organization, if necessary, transfers them to the customer under a separate contract.

4.2.9 The form, rules of execution and designation of the document, which contains the composition of all working documentation, executed in accordance with the contract, are established in the standards of the organization.

4.3 General data on working drawings

4.3.1 On the first sheets of each main set of working drawings, general data on working drawings are given, which include:

List of working drawings of the main set, carried out in form 1;

List of reference and attached documents, executed in form 2;

List of the main sets of working drawings, carried out in form 2;

List of specifications (if there are several layouts in the main set), performed according to Form 1;

Symbols that are not established by national standards and whose values ​​are not indicated on other sheets of the main set of working drawings;

General instructions;

Other data stipulated by the relevant SPDS standards.

Forms 1 and 2 with instructions on how to fill them out are given in Appendix D.

4.3.2 The list of working drawings of the main set contains a sequential list of sheets of the main set.

When drawing up the main set of working drawings as separate documents (see 4.2.5), instead of the list of working drawings of the main set, the general data include a list of documents of the main set in form 2, and in each of the subsequent documents of the main set, references are made to general data on the working drawings ...

4.3.3 The list of reference and attached documents is divided into sections:

Reference documents;

Attached documents.

In the section "Reference documents" indicate the documents according to 4.2.8. At the same time, the designation and name of the series and the issue number of drawings of typical structures, products and assemblies or the designation and name of the standard are indicated in the corresponding columns of the statement.

In the section "Attached documents" indicate the documents in accordance with 4.2.6.

4.3.4 A list of the main sets of working drawings is given on the general data sheets of one of the main sets of working drawings of a building or structure (at the discretion of the person responsible for the development of working documentation). The statement contains a sequential list of the main sets of working drawings that are part of a complete set of working documents for a building or structure.

If there are several basic sets of working drawings of the same brand (see 4.2.3), a list of sets of this brand is drawn up in Form 2 (Appendix D), which is given, as a rule, in the general data of each of these sets.

4.3.5 The general instructions give:

Information about the documents on the basis of which the decision was made to develop working documentation (for example, design assignment, approved project documentation);

A record of the compliance of the working documentation with the design assignment, issued to the technical conditions, the requirements of the current technical regulations, standards, sets of rules, and other documents containing the established requirements;

The list of technical regulations and normative documents containing requirements for technical solutions and further production of work, references to which are given in the working drawings;

The absolute mark taken in the working drawings of a building or structure conditionally as zero (as a rule, it is given in the drawings of architectural and structural solutions);

A record of the results of checking for patentability and patent purity of technological processes, equipment, structures, products and materials used for the first time in project documentation, as well as the numbers of patents and applications for which decisions were made to issue patents for inventions used in the working documentation (if necessary);

The list of types of work that affect the safety of a building or structure and for which it is necessary to draw up certificates of inspection of hidden works, critical structures and sections of engineering and technical support networks;

Information about who owns this intellectual property (if necessary);

Operational requirements for the projected building or structure (if necessary);

Other necessary instructions.

The general instructions should not repeat the technical requirements placed on other sheets of the main set of working drawings, and give a description of the technical solutions adopted in the working drawings.

Items of general instructions should be consecutively numbered. Each item of the general instructions is written on a new line.

5 General rules for the execution of documentation

5.1 General

5.1.1 When executing design and working documentation, as well as reporting technical documentation for engineering surveys for construction, one should be guided by the provisions of the SPDS and ESKD standards.

The list of ESKD standards to be taken into account when performing graphic and textual documentation for construction is given in Table D.1 (Appendix D).

5.1.2 Documentation, as a rule, is performed in an automated way on paper (in paper form) and / or in the form of DE.

Documents of the same type and name, regardless of the method of execution, are equal and interchangeable. Mutual correspondence between documents in electronic and paper forms is ensured by the developer.

General requirements for electronic documents - in accordance with GOST 2.051.

5.1.3 In graphic documents, images and symbols are performed with lines according to GOST 2.303. It is allowed to use lines of other types, names, style, thickness and main purposes of which are set in the relevant SPDS standards.

5.1.4 In graphic documents, symbols should be performed mainly in black. Some symbols or their individual elements may be executed in other colors. Refer to the relevant SPDS standards for legend color guidance. If the colors of the symbols used in the drawings and diagrams are not established in the standards, their purpose is indicated on the drawings.

In originals intended for making black-and-white copies, color symbols and their elements should be used in black.

5.1.5 When executing graphic documents, fonts in accordance with GOST 2.304 are used, as well as other fonts used by computer technology, provided that the conditions for the availability of these fonts to document users are ensured.

5.1.6 Drawings are performed at the optimal scale in accordance with GOST 2.302, taking into account their complexity and richness of information.

The scale of images in the drawings is not indicated, with the exception of product drawings and other cases provided for in the relevant SPDS standards. In these cases, the scales are indicated in parentheses immediately after the names of the images in accordance with GOST 2.316 (paragraph 4.19).

5.1.7 Drawings on paper and electronic drawings (2D) can be made on the basis of an electronic model (3D) of a building or structure (GOST 2.052).

5.1.9 The structure and composition of the DE details must ensure its circulation within the software (displaying, making changes, printing, recording and storing in databases, as well as transferring to other automated systems) while observing the regulatory requirements for paperwork.

5.1.10 For consideration, agreement, expertise and approval, submit copies of design and working documentation documents, completed as specified in 4.1 and 4.2.

5.1.11 The form of submission of documents for design and working documentation (paper or electronic), if it is not indicated in the design assignment, is determined by the developer in agreement with the customer. It is allowed to include documents in various forms of presentation in the design and working documentation.

5.1.12 The rules for the transfer of documentation on electronic media, including the nomenclature and forms of the necessary accounting and reporting documents, are established in the organization's standards developed on the basis of GOST 2.051, GOST 2.511 and GOST 2.512.

5.1.13 The list of word abbreviations allowed in graphic documents is compiled in addition to GOST 2.316 and is shown in Table E.1 (Appendix E).

5.2 Title blocks

5.2.1 Each sheet of a graphic and text document, as a rule, is drawn up with a title block and additional columns to it. Forms of main inscriptions and instructions for filling them out are given in Appendix G.

Note - Basic inscriptions do not draw up text documents executed in accordance with 4.1.8, estimates, etc.

The main inscription is located in the lower right corner of the sheet.

On A4 sheets in accordance with GOST 2.301, the main inscription is placed along the short side of the sheet. For text documents in tabular form, it is allowed, if necessary, to place the title block along the long side of the sheet.

On the sheets of the main sets of working drawings and sheets of the graphic part of the project documentation - form 3;

On the first sheet of drawings of building products - form 4;

On the first or title * sheets of text documents and the first sheets of sketch drawings of general types of atypical products, issued in the form of an issue, - form 5;
_______________
* For text documents executed with a title page and drawn up with main inscriptions, the title page is the next page after the title page.

On the subsequent sheets of drawings of construction products, text documents and sketch drawings of general views - form 6.

It is allowed to draw up the first sheet of a drawing of a building product with a main inscription in form 5.

5.2.3 If some text documents (for example, the specification of equipment, products and materials) are issued without a title page, then in this case the first page of the document is drawn up with a title block according to Form 3, the subsequent ones - according to Form 6.

When registering the main set of working drawings as separate documents, documents containing solid text and / or in the form of tables (for example, general data, cable log, etc.) are drawn up as text documents. In this case, the first sheet of the document is drawn up with the main inscription in form 3, the subsequent ones - in form 6.

5.2.4 In the reporting technical documentation based on the results of engineering surveys, the main inscription is used:

On sheets of graphic documents used in design as a basis - according to form 3;

On the first sheets of other graphic and text documents - according to form 5, on subsequent sheets - according to form 6.

5.2.5 The main inscription, additional columns to it and frames are made with solid thick main and solid thin lines in accordance with GOST 2.303.

5.2.6 The table of changes in the title block (columns 14-19), if necessary, may be continued up or to the left of the title block. When the table of changes is located to the left of the title block, columns 14-19 are repeated.

5.2.7 The location of the main inscription and additional columns to it, as well as the sizes of the frames on the sheets are shown in Figures I.1 and I.2 (Appendix I).

5.2.8 The design organization shall independently establish the location and size of additional columns for the identification of DE.

5.2.9 It is allowed to additionally identify project documents using a barcode.

In this case, the document designation, version number and document format designation should be used as barcode details. Additionally, the country code, code of the developer organization and other details can be used.

5.3 Coordination axes

5.3.1 On the images of a building or structure, the coordination axes of its supporting structures are indicated, intended to determine the relative position of the elements of a building or structure and to tie the building or structure to a building geodetic grid or alignment base.

5.3.2 Each individual building or structure is assigned an independent designation system for the coordination axes.

Coordination axes are applied to images of a building or structure with thin dash-dotted lines with long strokes, denoted in circles with a diameter of 6-12 mm with Arabic numerals and capital letters of the Russian alphabet (except for letters: E, Z, Y, O, X, Ts, Ch, Shch , B, Ы, b) or, if necessary, letters of the Latin alphabet (except for the letters I and O).

Omissions in digital and alphabetic (except for those indicated) designations of the coordination axes are not allowed.

The numbers indicate the coordination axes on the side of the building and structure with a large number of axes. If there are not enough letters of the alphabet to designate the coordinate axes, the subsequent axes are designated by two letters.

Example - AA, BB, BB.

5.3.3 The sequence of designations of the coordination axes is taken according to the plan, as shown in Figure 1 a: numeric axes - from left to right, letter axes - from bottom to top or as shown in figure 1 b and 1 v.

Picture 1

5.3.4 The designation of the coordinate axes, as a rule, is applied to the left and lower sides of the building and structure plan.

If the coordination axes of the opposite sides of the plan do not coincide at the points of divergence, the designations of the indicated axes are additionally applied along the upper and / or right sides.

5.3.5 For individual elements located between the coordination axes of the main supporting structures, additional axes are applied, which are assigned a designation in the form of a fraction, in the numerator of which the designation of the previous coordination axis is indicated, and in the denominator - an additional serial number within the area between adjacent coordination axes in according to figure 1 G.

It is allowed to assign digital and letter designations to the coordination axes of half-timbered columns in the continuation of the designations of the axes of the main columns without an additional number.

5.3.6 On the image of a repeating element tied to several coordination axes, the coordination axes are designated in accordance with the figure:

2a- if their number is not more than 3;

2b- if their number is more than 3;

2v- for all alphabetic and digital coordination axes.

Picture 2

If necessary, the orientation of the coordination axis to which the element is attached with respect to the adjacent axis is indicated in accordance with Figure 2. G.

5.3.7 On the plans of residential buildings, composed of block sections, the extreme coordination axes of block sections are assigned designations in accordance with 5.3.1-5.3.3, which are indicated in accordance with Figure 3 a.

Figure 3

The coordination axes of the block sections, including the extreme ones, are assigned independent designations in accordance with 5.3.1-5.3.3 with the addition of the "c" index (see Figure 3 b). If necessary, on the plan of block sections, indicate the designations of the coordination axes of a building composed of block sections.

5.3.8 A three-dimensional (3D) electronic model of a building or structure is performed in a single horizontal-height coordinate system.

The coordinate system of a three-dimensional model of a building or structure is depicted by three mutually perpendicular lines with the origin located at the intersection of axes 1 and A at the zero mark of this building or structure in accordance with Figure 4.

Figure 4

Moreover, for a building rectangular in plan (see Figure 1 a) for the positive direction is taken: axes - in the direction of increasing the digital designations of the coordination axes, axes - in the direction of increasing the letter designations of the coordination axes, the Z-axis - vertically upward from the conditional zero mark of the building.

5.4 Dimensioning, slopes, marks and labels

5.4.1 Linear dimensions in the drawings are indicated without designation of units of length:

In meters with an accuracy of two decimal places - on the drawings of external networks and communications, the master plan and transport, except for the cases specified in the relevant SPDS standards;

In millimeters - in all other types of drawings.

5.4.2 The dimension line at its intersection with extension lines, contour lines or center lines is limited by serifs 2-4 mm long, applied with an inclination to the right at an angle of 45 ° to the dimension line, while the dimension lines continue beyond the extreme extension lines (or, respectively, beyond contour or axial) by 0-3 mm.

When drawing the dimension of the diameter or radius inside the circle, as well as the angular dimension, the dimension line is limited by arrows. Arrows are also used when dimensioning radii and internal fillets.

When applying dimensions on axonometric diagrams of technological pipelines and engineering systems, it is allowed to limit dimension lines with arrows.

5.4.3 The marks of the levels (height, depth) of structural elements, equipment, pipelines, air ducts, etc. from the reference level (conditional "zero" mark) are indicated in meters without designation of the unit of length with three decimal places separated from an integer by a comma, for except for the cases stipulated in the relevant SPDS standards.

Level marks on facades, sections and sections are placed on extension lines (or on contour lines) and denoted by the sign "", made by solid thin lines with a stroke length of 2-4 mm at an angle of 45 ° to the extension line or contour line, in accordance with the figure 5; on plans - in a rectangle in accordance with Figure 6, except for the cases specified in the relevant SPDS standards.

Figure 5

Figure 6

The "zero" mark, taken, as a rule, for the surface of any structural element of a building or structure located near the planned surface of the earth, is indicated without a sign; relative elevations above zero are indicated with a "+" sign, below zero - with a "-" sign.

Note - As a rule, the level of the finished floor of the first floor is taken as a zero mark for buildings.

5.4.4 On the plans, the direction of the slope of the planes is indicated by an arrow, over which, if necessary, the numerical value of the slope in percent is put down in accordance with Figure 7 a or as the ratio of the unit of height of the plane to the corresponding horizontal projection (for example, 1: 7).

Figure 7

It is allowed to indicate the numerical value of the slope in ppm or in the form of a decimal fraction with an accuracy of the third decimal place.

On cuts, sections and diagrams, in front of the dimensional number, which determines the numerical value of the slope, a sign "" is applied, the acute angle of which should be directed towards the slope (except for the steepness of the slopes of embankments and cuts). The slope designation is applied directly above the contour line or on the shelf of the leader line in accordance with Figure 7 b.

5.4.5 Position numbers or marks of elements are applied on the shelves of leader lines drawn from images of structural elements of buildings or structures, next to the image - without a leader line or within the contours of the displayed elements in accordance with Figure 8.

Figure 8

A leader line usually ends with a dot. If the leader line moves away from the surface line, then it ends with an arrow. For a small-scale image, leader lines end without an arrow and a point.

5.4.6 Callouts for multilayer structures are performed in accordance with Figure 9.

Note - The numbers conventionally designate the sequence of the arrangement of the layers of structures and inscriptions on the shelves of the leader lines.

Figure 9

5.4.7 The font size for designating the coordinate axes, positions (marks), names and designations of images should be 1.5-2 times larger than the size of the digits of the dimensional numbers used in the same graphic document.

5.5 Images (sections, sections, views, details)

5.5.1 Images in the drawings are performed in accordance with GOST 2.305, taking into account the requirements of this standard and other SPDS standards.

5.5.2 Sectional views of a building or structure are designated in Arabic numerals sequentially within the graphic document. Sections are designated in the same way.

Note - In the drawings of design and working documentation, a section is usually called a vertical section of a building or structure, i.e. a section made with a cutting plane perpendicular to the horizontal plane of the projections.

Self-numbering is allowed for sections and sections of individual sections of a building, structure or installations, all drawings of which are placed on one sheet or a group of sheets and if these drawings do not contain references to sections and sections located on other sheets of a graphic document.

It is allowed to designate cuts with uppercase letters of the Russian alphabet, and sections - with uppercase or lowercase letters of the Russian alphabet (with the exception of the letters specified in 5.3.2).

The position of the secant plane is indicated in the drawing with a section line (open line in accordance with GOST 2.303). With a complex section, strokes are also drawn at the intersection of the secant planes with each other. Arrows should be placed on the initial and final strokes, indicating the direction of the gaze; arrows should be drawn at a distance of 2-3 mm from the end of the line (Figure 10).

Figure 10

The direction of view for a section along the plan of a building and structure is taken, as a rule, from bottom to top and from right to left.

5.5.3 If individual parts of the view (facade), plan, section require a more detailed image, then in addition, local views and detailing elements - nodes and fragments - are performed.

5.5.4 On the image (plan, facade or section), from where the node is taken out, the corresponding place is marked with a closed solid thin line (circle, oval or rectangle with rounded corners) with the drawing on the shelf of the leader line of the node designation in Arabic numerals in accordance with Figures 11 a, 11b or a capital letter of the Russian alphabet in accordance with Figure 11 v.

Figure 11

If necessary, references to a unit placed in another graphic document (for example, the main set of working drawings), or to working drawings of a typical building unit indicate the designation and sheet number of the corresponding document in accordance with Figure 11 b or a series of working drawings of typical units and the issue number in accordance with Figure 11 v.

Figure 12

Above the image of the node, indicate in a circle its designation in accordance with Figure 13 a if the node is shown on the same sheet from where it was taken out, or 13 b if it is rendered on another sheet.

Figure 13

The node, which is a complete mirror image of another (main) performance, is assigned the same designation as the main performance, with the addition of the index "n".

5.5.5 Local views are designated in capital letters of the Russian alphabet, which are applied next to the arrow indicating the direction of sight. The same designations are applied over the images of the species.

5.5.6 For each type of images (sections and sections, nodes, fragments), an independent order of numbering or letter designations is used.

5.5.7 On the image (plan, facade or section), from where the fragment is taken out, the corresponding place is marked, as a rule, with a curly brace in accordance with Figure 14.

Figure 14

The name and serial number of the fragment are applied under the curly brace or on the shelf of the leader line, as well as above the corresponding fragment.

5.5.8 Images up to the axis of symmetry of symmetrical plans and facades of buildings and structures, layouts of structural elements, layouts of technological, power, sanitary and other equipment are not allowed.

5.5.9 If the image of a cut, section, node, view or fragment is placed on another sheet, then after the designation of the image, indicate in brackets the number of this sheet in accordance with Figures 10, 11 a, 12 and 14.

5.5.10 Images can be rotated. At the same time, in the names of the images in the drawings, the conventional graphic designation "rotated" according to GOST 2.305 is not given, if the position of the image is determined unambiguously, i.e. oriented by focal axes and / or elevation marks.

5.5.11 If an image (for example, a plan) does not fit on a sheet of an accepted format, then it is divided into several sections, placing them on separate sheets.

In this case, on each sheet, where an area of ​​the image is shown, a diagram of the whole image is given with the necessary coordination axes and a symbol (hatching) of the area of ​​the image shown on this sheet in accordance with Figure 15.

Note - If the drawings of the image areas are placed in different basic sets of working drawings, then the full designation of the corresponding basic set is indicated above the sheet number.

Figure 15

5.5.12 If the floor plans of a multi-storey building have slight differences from each other, then the plan of one of the floors is completely fulfilled; for other floors, only those parts of the plan are performed that are necessary to show the difference from the plan shown in full.

Under the name of the partially depicted plan, an entry is given: "The rest, see the plan (name of the fully depicted plan)".

5.5.13 In the names of plans of a building or structure indicate the word "Plan" and the elevation of the finished floor or the number of the floor, or the designation of the corresponding secant plane (when two or more plans are executed at different levels within the floor).

Examples of

1 Plan at elev. 0.000

2 Plan of the 2nd floor

When a part of the plan is executed, the name indicates the axes that limit this part of the plan.

Example - Plan at elev. 0.000 between axles 21-30 and A-D

It is allowed to indicate the purpose of the premises located on the floor in the name of the floor plan.

5.5.14 In the names of sections of the building (structure) indicate the word "Section" and the designation of the corresponding cutting plane according to 5.5.2.

Example - Section 1-1

Note - In the names of product sections, the word "Section" is not indicated.

Section names are numeric or alphabetic sectioning planes.

Example - 5-5, B-B, a-a

5.5.15 In the names of the facades of a building or structure indicate the word "Facade" and the designation of the extreme axes between which the facade is located.

Example - Facade 1-12, Facade 1-1, Facade A-G

It is allowed to indicate its location in the name of the facade, for example, "main", "yard", etc.

5.5.16 The names of the images in the drawings are not underlined.

6 Rules for the implementation of specifications on drawings

6.1 To the layouts of elements of prefabricated structures, monolithic reinforced concrete structures, to the drawings of the location of technological equipment and / or pipelines, installations (blocks) of technological, sanitary and other equipment, as well as to other drawings, specifications are drawn up in accordance with Form 7 (Appendix K).

When performing drawings by the group method, group specifications are made in accordance with Form 8 (Appendix K).

6.2 The specification is placed, as a rule, on a sheet of drawings, which shows diagrams, layouts of equipment and pipelines, plans of installations. It is allowed to carry out the specification on separate sheets as subsequent sheets of drawings.

6.3 In electronic models, if necessary, specifications and other tables in the drawings may be performed in the workspace of the electronic model, taking into account the provisions of GOST 2.052. In this case, it is recommended to perform them at a separate information level.

6.4 Specifications of building products are made in accordance with GOST 21.501.

7 Rules for amendments

7.1 General

7.1.1 Based on the provisions of section 7 of this standard, standards of organizations can be developed, taking into account the peculiarities of making changes to design documents, depending on the volume of documentation, document flow conditions and the CAD and EDMS used.

7.1.2 A change in a document previously transferred to the customer is any correction, deletion or addition to it of any data without changing the designation of this document.

The designation of a document may only be changed if the same designation has been erroneously assigned to different documents or an error has been made in the designation of the document.

Changes to calculations are not allowed.

7.1.3 If a change to a document is unacceptable, a new document should be issued with a new designation.

7.1.4 Any change in a document causing any changes in other documents must be simultaneously accompanied by the introduction of appropriate changes in all related documents.

7.1.5 Changes are made to the original document.

7.1.6 Information on the fact of a change in the document is indicated by:

In paper documents - in the title block of these documents and / or in the change registration tables;

In DE - in the requisite part of these documents;

In the "Note" column of documents and statements intended for accounting documents.

7.2 Permission to change

7.2.1 Amendment of a document (including its cancellation) is performed, as a rule, on the basis of a permission to amend (hereinafter - permission). The permit is carried out on paper according to Forms 9 and 9a (Appendix L) or as DE.

The permit is registered in accordance with GOST R 21.1003.

7.2.2 The permission is approved by the head of the organization - the developer of the document or another official authorized by him.

Permission is the basis for obtaining original documents and making changes to them.

7.2.3 Originals of permits on paper are stored in the archives of the organization.

7.2.4 Changes to each document (for example, the main set of working drawings, specification of equipment, products and materials) are made on the basis of a separate permit.

It is allowed to draw up one general permission for changes made simultaneously to several documents, if the changes are interrelated or the same for all the changed documents.

Changes to the documents of the main set of working drawings, drawn up in separate documents (see 4.2.5), as well as to the documents of the volume of design documentation, are made on the basis of one general permit.

7.2.5 When making changes to the DE, it is allowed not to issue a permit if the CAD and EDMS keep records and store versions of the document and provide access control that excludes the possibility of unauthorized changes.

7.3 Changes

7.3.1 Changes are indicated by serial numbers (1, 2, 3, etc.). One change serial number is assigned to all changes that are made to the document by one permission. It is indicated for the entire document, regardless of how many sheets it is made on.

7.3.2 When making changes to the original DE, any change is indexed as a new version of this document.

7.3.3 Changes to paper originals of documents are made by:

Strikethrough;

Cleaning (washing off);

Painting with white;

Introducing new data;

Replacing sheets or the entire document;

Introduction of new additional sheets and / or documents;

Exclusion of individual sheets of the document.

In this case, the physical condition of the original is taken into account.

7.3.4 Changes to documents are made by automated and handwritten methods.

7.3.5 Manuscript changes are made to paper originals of documents in accordance with 7.3.9-7.3.16.

After making changes, the originals should be suitable for making copies of documents of adequate quality using reprographic methods.

7.3.6 Changes to the DE are made by issuing a new version of the document with the changes introduced.

7.3.7 When making changes in an automated way, a new original is produced taking into account the changes introduced and its previous designation is retained.

A new original is also made if there is not enough space for handwriting changes or if the image clarity may be disturbed when correcting.

If one or more sheets of the original are replaced or added, then the inventory number assigned to the original is retained on them.

When replacing all sheets of the original, a new inventory number is assigned to it.

7.3.8 Changes to the estimate documentation are carried out in an automated way with the replacement of the entire document.

7.3.9 Variable sizes, words, signs, labels, etc. cross out with solid thin lines and add new data next to it.

7.3.10 When the image (part of the image) changes, it is encircled with a solid thin line, forming a closed contour, and crossed out crosswise with solid thin lines in accordance with Figure 16.

Figure 16

A new image of the changed area is performed on a free margin of the sheet or on another sheet without rotations.

7.3.11 Variable and additional sections of the image are assigned a designation consisting of the serial number of the next change in the document and through the dot of the serial number of the changed (additional) section of the image within this sheet. In this case, the designation of the change of the replaced image is assigned to the new image of the changed area.

If a new image of the changed area is placed on another sheet, then the change designation assigned to it is saved and is not taken into account in the change table of this sheet.

7.3.12 About each change, including around the place corrected by erasure (washing) or painting in white, outside the image or text, a change designation is applied in the parallelogram (see Figure 16) and a solid thin line is drawn from this parallelogram to the changed area ...

It is allowed not to draw a line from the parallelogram with the designation of the change to the changed section.

When making changes to text documents (in the text part of documents), the lines from the parallelogram with the designation of the change are not drawn.

7.3.13 Adjusted dimensions, words, signs, inscriptions, etc. that are closely spaced from each other. outlined with a solid thin line forming a closed contour, without striking through in accordance with Figure 17.

Figure 17

7.3.14 If a new image of the changed area is placed on another sheet, then the number of the sheet on which the new image is located is also indicated for the replaced image (see Figure 16).

7.3.15 Above the new image of the changed area, the designation of the change of the replaced image is placed in the parallelogram, and in the case of the parallelogram, indicate: "Instead of the crossed out one".

If a new image of the changed area is placed on another sheet, then with a parallelogram indicate: "Instead of the one crossed out on the sheet (the number of the sheet on which the replaced image is located)" in accordance with Figure 18.

Figure 18

7.3.16 If a new image of the changed area is placed near the replaced one, then they are connected by leader lines with a change designation in accordance with Figure 19.

Figure 19

Above the additional image, the designation of the change is placed in the parallelogram, and with the parallelogram, indicate: "Addition" in accordance with Figure 20.

Figure 20

7.3.17 When adding a new sheet of a text document, it is allowed to assign it the number of the previous sheet with the addition of the next lowercase letter of the Russian alphabet or through a dot of the Arabic numeral, for example 3a or 3.1.

In text documents containing mostly solid text, it is allowed, when adding a new item, to assign it the number of the previous item with the addition of the next lowercase letter of the Russian alphabet, and if the item is excluded, keep the numbers of subsequent items.

7.3.18 When changing the total number of sheets of a document on its first sheet in the title block, make appropriate corrections in the "Sheets" column.

7.3.19 Data on changes made to the original are indicated in the table of changes placed in the main inscription (if any), and if there is a lack of space, in an additional table to it (see 5.2.6).

In the new (modified) version of the DE in the table of changes, only data on the last change are indicated.

7.3.20 When making changes to documents, the table of changes is filled out on sheets (sheet):

The first (capital) of the new original, made as a whole to replace the old one;

Changed;

Released instead of replaced;

Added again.

7.3.21 The table of changes indicates:

a) in the column "Change." - serial number of the document change. When replacing the original with a new one, the next serial number is affixed based on the last change number indicated in the replaced original;

b) in the column "Number of accounts." - the number of changing areas of the image on a given sheet within the next change;

c) in the "Sheet" column:

1) on sheets issued instead of replaced ones - "Deputy";

2) on the sheets added again - "New";

3) when replacing all sheets of the original when manually making changes on the first (title) sheet - "All" (while the table of changes on other sheets of this original is not filled in), in an automated way - "Deputy." on all sheets.

In other cases, a dash shall be placed in the "Sheet" column;

d) in the column "N doc." - designation of permission;

e) in the column "Sign." - signature of the person responsible for the correctness of the amendment. When replacing all sheets of the original in an automated way, the signature is affixed only on the first (title) sheet. The signature of the supervisor is affixed on the field for filing the sheet (except for sheets issued instead of replaced and new ones);

f) in the "Date" column - the date of the amendment.

7.3.22 It is recommended to register changes in text documents in the table for registering changes in form 10 (Appendix M), which is placed on a separate last sheet of the document when the first and subsequent changes are made.

7.3.23 When replacing sheets of documents drawn up with main inscriptions in forms 3-5, sheets issued instead of replaced ones are signed in columns 10-13 of the main inscriptions in accordance with the procedure provided for newly developed sheets.

7.3.24 When canceling or replacing sheets of a document, all canceled and replaced original sheets are stamped "Canceled (replaced)" in the form given in GOST R 21.1003 (Appendix D), which is filled in according to the instructions given there.

7.4 Features of making changes to design documentation

7.4.1 Changes to the design documentation are made in accordance with 7.1-7.3, taking into account the provisions of 7.4.2-7.4.8.

7.4.2 Changes to the design documentation previously transferred to the customer, as a rule, are made in an automated way and are carried out:

Replacement, addition or exclusion of individual sheets of the volume;

Replacement (re-release) of the volume - when it is completely reworked;

Release of additional volumes.

7.4.3 When a section or subsection of the project documentation is completely revised, it is recommended to provide information about the changes made at the beginning of its text part: the basis for making changes, a brief description of the changes made.

7.4.4 If changes are made on the basis of a negative conclusion of the examination of the design documentation, then in the section "Explanatory note" as an attachment include a certificate describing the changes made to the design documentation. The certificate must be signed by the person responsible for the preparation of project documentation - the chief project engineer.

7.4.5 Registration of changes (versions) of the volume as a whole is carried out in the table of registration of changes in form 11 (Appendix M), which is placed when changes are made on its title page and cover. It is allowed to show the table only on the cover.

The changes registration table does not take into account the corrections made to the list "Composition of design documentation" due to changes in other volumes of design documentation.

7.4.6 Information about changes in sheets of graphic documents is indicated in the "Note" column of the volume content:

a) for the replaced sheets when the first change is made - "Amendment 1 (Replacement)", for subsequent changes - additionally the successive numbers of changes, separating them from the previous ones with a semicolon.

Example - Change. 1 (Deputy);

b) for deleted (canceled) sheets with the change number - "(Canceled)".

Example - Change. 1 (Annul.);

c) for additional sheets with the change number - "(New)"

Example - Change. 1 (New).

7.4.7 When performing additional volumes of design documentation, corrections are made to the list "Composition of design documentation".

Information about changes in the list "Composition of design documentation" in the content of the volume is not given.

7.4.8 Changes to the approved design documentation related to changes in the parameters of the construction object affecting its structural reliability and safety, and the need to re-approve the design documentation, are made at the customer's decision on the basis of a new design assignment or additions to a previously approved design assignment.

7.5 Features of making changes to working documentation

7.5.1 Changes to the working documentation are made in accordance with 7.1-7.3, taking into account the provisions of 7.5.2-7.5.9.

7.5.2 When making changes to the sheets of the main set of working drawings in the list of working drawings of this set in the column "Note" indicate:

For replaced, canceled and additional sheets - information in accordance with items a) -c) 7.4.6;

For the changed sheets (in handwritten method) when making the first change - "Change 1", subsequent changes - additionally the successive numbers of changes, separating them from the previous ones with a semicolon.

Example - Change. 1; 2; 3.

In case of replacement of general data sheets in the list of working drawings of this set, it is allowed to provide information only about the last change of sheets of the main set.

7.5.3 If additional sheets are included in the main set of working drawings, then they are assigned successive serial numbers and recorded in the continuation of the list of working drawings of the corresponding main set.

If there is not enough space in the list of working drawings for recording additional sheets, the continuation of the list is transferred to the first of the additional sheets. At the same time, at the end of the list of working drawings, placed in the "General data", they make an entry: "For the continuation of the list, see sheet (sheet number)", and above the list on an additional sheet, place the title: "List of working drawings of the main set (Continued)" ...

When changing the names of sheets, make the appropriate corrections in the column "Name".

When making changes in a handwritten method, the numbers and names of the canceled sheets in the list of working drawings are crossed out, in an automated way - the column "Name" for the canceled sheets is not filled in.

7.5.4 When making changes to the documents of the main set, drawn up in separate documents, make the appropriate corrections to the list of documents of the main set of working drawings.

7.5.5 When performing additional and cancellation of previously executed attached documents, make corrections in the "Attached documents" section of the list of reference and attached documents of the corresponding main set of working drawings.

When replacing reference documents in working drawings (see 4.2.8), corrections are made to the appropriate section of the list of reference and attached documents.

7.5.6 When completing additional and cancellation of previously completed main sets of working drawings, corrections are made to the list of main sets of working drawings.

7.5.7 In the tables of changes on the general data sheets, corrections made in the general data sheet in connection with the introduction of changes to the sheets of the main set and the attached documents are not taken into account as sections of changes in accordance with 7.3.11.

7.5.8 Registration of changes in documents of working documentation, drawn up with title pages, is also carried out in the table for registration of changes in form 11 (Appendix M), which is placed on the title page when changes are made.

7.5.9 Copies of sheets (modified, additional and issued instead of replaced sheets) of working documentation on paper are sent to organizations to which copies of documents were previously sent, simultaneously with copies of general data of the corresponding main set of working drawings, updated in accordance with 7.5.2-7.5 .6.

New versions of the amended documents are sent to organizations electronically (see 7.3.6).

8 Rules for registration of bound documentation

8.1 Copies of text and graphic materials of design documentation and reporting technical documentation for engineering surveys are brochured in volumes folded into A4 format GOST 2.301.

Note - Binding means the placement of materials of project documentation on paper in bindings or in hard folders with easily detachable fasteners (locks).

8.2 Copies of documents of working documentation are completed into folders, sheet by sheet, folded in A4 format, as a rule, separately according to the main sets of working drawings.

It is allowed to bind copies of working documents in volumes in accordance with 8.1 or in albums folded in A3 format.

The number of sheets included in a folder or album must comply with 4.1.5.

8.3 Each document, volume or album intended for stitching, as well as a folder with documents folded into it, is designed with a cover in form 12 (Appendix H). The cover is not numbered and is not included in the total number of sheets.

8.4 The first page of a bound document, as well as a volume consisting of several documents, an album or a folder with working documents, is the title page.

The title page is made in accordance with Form 13 (Appendix P). Examples of the execution of title pages are shown in Figures P.1 and P.2 (Appendix P).

In the volume of design documentation, which consists of several independent documents, including the text part, the title page to the text part, as a rule, is not performed.

8.5 All pages of a bound volume (album) are recommended to be numbered sequentially, starting with the title page. In this case, the title page is not numbered. The sheet number is indicated in the upper right corner of the sheet working field (see Appendix I).

In addition, text and graphic documents included in the volume (album) and having an independent designation must have sequential numbering of sheets within the document with one designation in the title block or in the header (in accordance with 4.1.8).

8.6 When collecting several documents in the form of a volume, album, as well as in a folder after the title page, the contents of the volume (album, folder) are given, which is a list of documents included in the volume (album, folder). The content is performed according to Form 2 (Appendix D) on A4 sheets.

The documents in the content are recorded in the sequence of their acquisition, in an album or a folder. Graphic documents of design and reporting technical documentation for engineering surveys are written down sheet by sheet. The cover and title page are not recorded in the table of contents.

In the column "Name" - the name of the document in full accordance with the name indicated in the title block or on the title page;

In the "Note" column - information about the changes made to the recorded documents, as well as the number of the volume sheet according to the sequential numbering of the volume sheets in accordance with 8.5, from which the document begins.

If sequential numbering is not performed, then the total number of sheets of each document is given in the "Note" column. At the end of the content, the total number of sheets included in the volume (album, folder) is given.

The first page of the volume (album, folder) content is drawn up with the main inscription according to Form 5 (Appendix G), the subsequent ones - according to Form 6 (Appendix G). The content is assigned a designation consisting of a volume designation (album, folder) and a hyphenated cipher "C".

Example - 2345-ROM2-C; 2345-11-KZh.I-S; 2345-11-OV.OL-S; 2345-11-TX.H-S

Column 5 of the main inscription indicates "Volume Contents" or, respectively, "Album Contents" and "Folder Contents" and then - the number of the corresponding volume, album or folder (if any).

8.7 Title pages of volumes of design documentation are drawn up with signatures:

The head or chief engineer of the organization;

The person responsible for the preparation of project documentation, for example, the chief engineer (architect) of the project.

The title pages of working documents are signed by the person responsible for the preparation of working documents - the chief engineer (architect) of the project.

The title page of the technical report based on the results of engineering surveys is signed by the head of the organization or his deputy and, if necessary, other officials.

The title pages of copies of the documentation handed over to the customer are certified by the stamp of the organization that prepared this documentation.

8.8 The composition of the project documentation, as well as the composition of the reporting technical documentation based on the results of engineering surveys, is given in a statement executed in accordance with Form 14 (Appendix C) on A4 sheets.

The statement contains a sequential list of volumes of design or reporting technical documentation for engineering surveys.

The first sheet of the statement is drawn up with the main inscription in form 5 (Appendix G), the subsequent ones - in form 6 (Appendix G).

The composition of the design documentation is assigned a designation consisting of the basic designation of the design documentation and through the hyphen cipher "SP".

Example - 2345-SP

When stitching a statement into a separate volume, it is drawn up with a cover and a title page in accordance with 8.3 and 8.4. The volume number on the cover and title page is not indicated.

The composition of the reporting technical documentation based on the results of engineering surveys is assigned a designation consisting of the basic designation of the documentation and a hyphen of the cipher "SD".

Example - 2344-SD

A.1 The codes of the sections of the design documentation for capital construction facilities for production and non-production purposes are given in Table A.1.

Table A.1

Section number

Section code

Explanatory note

Planning organization of the land plot

Architectural solutions

Constructive and space-planning solutions

Information about engineering equipment, networks of engineering and technical support, a list of engineering and technical measures, the content of technological solutions

Project for the organization of work on the demolition or dismantling of capital construction objects

List of measures for environmental protection

Measures to ensure access for people with disabilities

10

Requirements for ensuring the safe operation of a capital construction facility

Estimates for the construction of capital construction projects

Measures to ensure compliance with energy efficiency requirements and the requirements for equipping buildings, structures and structures with metering devices for used energy resources

Other documentation established by legislative acts of the Russian Federation

Note - It is allowed to give the numbers of sections 10 and 11 in the form of 10 (1), 11 (1) or 10-1, 11-1.

A.2 The codes of sections of the design documentation for linear objects are given in Table A.2.

Table A.2

Section number

Name of the section of the project documentation

Section code

Explanatory note

Right of way project

Technological and constructive solutions for a linear object. Artificial constructions

Buildings, structures and structures included in the infrastructure of a linear object *

Construction organization project

Project for the organization of work on the demolition (dismantling) of a linear facility

Environmental protection measures

Fire safety measures

Construction estimate

Other documentation in cases stipulated by federal laws, including:

The list of civil defense measures, measures to prevent natural and man-made emergencies, measures to counter terrorism

Industrial Safety Declaration of Hazardous Production Facilities

Declaration of safety of hydraulic structures

* The design documentation of buildings, structures and structures is developed in accordance with the composition of the documentation according to Table A.1.

Note - If necessary, the codes of sections of the project documentation may be designated by letters of the Latin alphabet in accordance with the rules established in the standards of organizations.

Table B.1

Name of the main set of working drawings

Note

General layout and transport facilities

When combining working drawings of the master plan and transport structures

General plan

Car roads

Railways

Transport structures

When combining working drawings of roads, railways and other roads

Architectural and construction solutions

When combining working drawings of architectural and structural solutions (except for KM)

Architectural solutions

Interiors

Working drawings can be combined with the main set of the AR or AC brand

Reinforced concrete structures

Metal structures

Metal detailing structures

Wooden structures

Hydraulic solutions

Anti-corrosion protection of buildings and structures

Power supply

Outdoor electric lighting

Power equipment

Electric lighting (interior)

External water supply networks

External sewerage networks

External water supply and sewerage networks

When combining working drawings of external water supply and sewerage networks

Internal water supply and sewerage systems

Firefighting

Heating, ventilation and air conditioning

Air supply

Dust extraction

Cold supply

Thermal mechanical solutions

Boiler houses, thermal power plants, etc.

Thermal mechanical solutions for heating networks

Wired communications *

The names of the main sets and designations of brands are taken according to Appendix A of GOST R 21.1703

Radio communication, radio broadcasting and television

Fire alarm

Security and burglar-fire alarms

Outdoor gas pipelines

Gas supply (internal devices)

Production technology

Technological communications

When combining working drawings of all technological communications

Corrosion protection of technological devices, gas ducts and pipelines

Thermal insulation of equipment and pipelines

Integrated automation

When combining working drawings for the automation of various technological processes and engineering systems

Automation + (**)

The names of the main sets and designations of brands are taken according to Appendix A of GOST 21.408

Irrigation and drainage linear structures *

The names of the main sets and designations of brands are taken according to Appendix A GOST 21.709

* General names of objects are given.

Notes (edit)

1 If necessary, additional marks of the main sets of working drawings can be assigned. At the same time, it is recommended to include no more than three capital letters of the Russian alphabet in the stamp, corresponding, as a rule, to the initial letters of the name of the main set of working drawings.

2 If necessary, the marks of the main sets of working drawings may be designated by letters of the Latin alphabet or digital codes in accordance with the rules established in the standards of organizations.

________________
** The text corresponds to the original. - Note from the manufacturer of the database.

Table B.1

Name of the attached document

Specification of equipment, products and materials

General sketch drawing of a non-standard product

Working drawing of a construction product

Questionnaire, dimensional drawing

Local estimates

* Calculations, as a rule, are not included in the working documentation, unless otherwise specified in the agreement (contract) and design assignment.

Notes (edit)

1 Codes for other types of attached documents are given in the relevant SPDS standards or standards of organizations.

2 It is allowed, if necessary, to designate the ciphers of the attached documents with letters of the Latin alphabet in accordance with the rules established in the standards of organizations.

Appendix D (mandatory). General data sheet for working drawings

Appendix D
(required)

Form 1 - List of working drawings of the main set

Specification Sheet

D.1 In the list of working drawings of the main set indicate:

In the "Sheet" column - the serial number of the sheet of the main set of working drawings;

In the column "Name" - the name of the images placed on the sheet, in accordance with the names given in the title block of the sheet;

In the "Note" column - additional information, for example, about the changes made to the working drawings of the main set.

D.2 The specification sheet indicates:

In the "Sheet" column - the number of the sheet of the main set of working drawings, on which the specification is placed;

In the column "Name" - the name of the specification in strict accordance with its name indicated on the drawing;

In the "Note" column - additional information, including about changes to the specifications.

Form 2 - List of main sets of working drawings

List of reference and attached documents

List of documents for the main set of working drawings

D.3 In the list of the main sets of working drawings indicate:

In the column "Designation" - the designation of the main set of working drawings and, if necessary, the name or distinctive index of the organization that issued the document;

In the column "Name" - the name of the main set of working drawings;

In the "Note" column - additional information, including about changes in the composition of the main sets of working drawings.

D.4 The list of reference and attached documents indicate:

In the column "Designation" - the designation of the document and, if necessary, the name or distinctive index of the organization that issued the document;

In the column "Name" - the name of the document in strict accordance with the name indicated on the title page or in the title block;

In the "Note" column - additional information, including about the changes made to the recorded documents that are part of the working documentation. For documents in electronic form, indicate, if necessary, the identifier of the file (files).

D.5 In the list of documents of the main set of working drawings indicate:

In the column "Designation" - the designation of the document;

In the column "Name" - the name of the document in accordance with the name indicated in the title block. For graphic documents consisting of several sheets, the names of the images placed on each sheet are also given, in accordance with the names given in the title block of the sheet;

In the "Note" column - additional information, including about the changes made to the recorded documents, and, if necessary, the total number of sheets of the document. For documents in electronic form, indicate, if necessary, the identifier of the file (files).

D.6 The sizes of the columns of statements, if necessary, can be changed at the discretion of the developer.

D.7 It is allowed, if necessary, to include additional columns (columns) in the statement, for example, "Number of sheets", etc.

D.8 When filling out the sheets in an automated way, horizontal lines delimiting the lines are allowed not to be drawn. In this case, it is necessary to observe an interval of at least one printing bit between the texts of adjacent lines.

Appendix D (mandatory). The list of ESKD standards to be taken into account when performing graphic and textual documentation for construction

Appendix D
(required)

Table E.1

Designation and title of the standard

Conditions of application of the standard

GOST 2.004-88 Unified system for design documentation. General requirements for the implementation of design and technological documents on printing and graphic devices for computer output

GOST 2.051-2006 Unified system for design documentation. Electronic documents. General Provisions

GOST 2.052-2006 Unified system for design documentation. Electronic model of the product. General Provisions

GOST 2.101-68 Unified system for design documentation. Types of products

GOST 2.102-68 Unified system for design documentation. Types and completeness of design documents

Taking into account the provisions of GOST 21.501 related to the implementation of drawings of building products

GOST 2.105-95 Unified system for design documentation. General requirements for text documents

Subject to the provisions of clauses 4, 5 and 8 of this standard

GOST 2.109-73 Unified system for design documentation. Basic requirements for drawings

GOST 2.113-75 Unified system for design documentation. Group and basic design documents

Taking into account the provisions of GOST 21.501

GOST 2.114-95 Unified system for design documentation. Technical conditions

Subject to the provisions of 5.2.1, 5.2.2, 5.2.5-5.2.7 and section 8 of this standard. The provisions of 3.7.1 and 3.8 of GOST 2.114 do not take into account

GOST 2.301-68 Unified system for design documentation. Formats

Taking into account the requirements of the relevant SPDS standards

GOST 2.302-68 Unified system for design documentation. The scale

Subject to the provisions of 5.1.6 of this standard

GOST 2.303-68 Unified system for design documentation. Lines

Subject to the provisions of 5.1.3 of this standard

GOST 2.304-81 Unified system for design documentation. Drawing fonts

Subject to the provisions of 5.1.5 of this standard

GOST 2.305-2008 Unified system for design documentation. Images - views, sections, sections

Subject to the provisions of 5.5 of this standard

GOST 2.306-68 Unified system for design documentation. Designations of graphic materials and rules for their application in drawings

Taking into account the provisions of GOST 21.302, tables 4 and 5

GOST 2.307-2011 Unified system for design documentation. Dimensioning and limit deviations

Subject to the provisions of 5.4.1-5.4.4 of this standard

GOST 2.308-2011 Unified system for design documentation. Specifying Tolerances of the Shape and Location of Surfaces

Taking into account the provisions of GOST 21.113

GOST 2.309-73 Unified system for design documentation. Surface roughness designation

GOST 2.310-68 Unified system for design documentation. Application on drawings of designations of coatings, thermal and other types of processing

GOST 2.311-68 Unified system for design documentation. Thread Image

GOST 2.312-72 Unified system for design documentation. Conditional images and symbols of welded joints

GOST 2.313-82 Unified system for design documentation. Conditional images and designations of permanent connections

GOST 2.314-68 Unified system for design documentation. Instructions on the drawings on marking and branding of products

GOST 2.315-68 Unified system for design documentation. Simplified and schematic illustrations of fasteners

GOST 2.316-2008 Unified system for design documentation. Rules for applying inscriptions, technical requirements and tables on graphic documents. General Provisions

Subject to the provisions of 5.4.5-5.4.7 of this standard

GOST 2.317-2011 ESKD. Axonometric projections

GOST 2.501-88 ESKD. Accounting and storage rules

In the part of the form of the inventory book, subscriber card and instructions for folding drawings

GOST 2.511-2011 Unified system for design documentation. Rules for the transfer of electronic design documents. General Provisions

GOST 2.512-2011 Unified system for design documentation. Rules for the execution of a data package for the transfer of electronic design documents. General Provisions

Note - The conditions for the application of the ESKD standards of classification group 7 are determined by the SPDS standards, which provide references to these standards.

Appendix E (recommended). List of allowed abbreviations of words used in graphic documents (addition to GOST 2.316)

Table E.1

Full name

Reduction

Highway

Canceled

Anti-seismic seam

Architect

Asphalt concrete

Concrete, concrete

Ventilation chamber

ventilation chamber

Capacity

Roomy (c, t)

Chief Engineer

Ch. Ing. (O)

Chief engineer (architect) of the project

ISU (GAP) (o)

Chief Specialist

Ch. specialist. (O)

Expansion joint

Director

Document

doc. (then)

Admissible

Railway

Railway

Reinforced concrete, reinforced concrete

Manager

Insulation, insulating

Institute

Design

Coefficient

Efficiency

Staircase, staircase

Workshop (in design organizations)

Materials (edit)

materials (t)

Mounting

norm. load

Equipment

calc. load

Sanitary-technical

dignity tech.

Toilet

dignity node.

Well

Snow

Expansion joint

Technological

Rail head level

lvl. r. (and)

Ground (ground) water level

Ground level

Clean floor level

Fundamental

Cement, cement

Cement concrete

Plaster

Crushed stone, crushed stone

Electric

el-t (and, t)

Notes (edit)

1 Abbreviations marked with a (o) are used only in the title block; (t) - in tables; (c) - with numbers or codes; (and) - in graphic images.

2 Abbreviations of words indicated in this table and GOST 2.316 may be indicated in text documents, divided into columns.

Appendix G (mandatory). Title blocks and additional columns to them

Appendix G
(required)

Form 3 - For sheets of the main sets of working drawings, graphic documents of project documentation and graphic documents for engineering surveys

Note - For graphic documents on engineering surveys, the entry "N. cont." ("Normocontrol") in the title block is allowed not to be performed.

Form 4 - For drawings of building products (first sheet)

(Amendment. IUS N 1-2015).

Form 5 - For sketch drawings of general views of atypical products, all types of text documents (first or title page)

Note - The main inscription in form 5 is allowed to be used for graphic documents on engineering surveys that are not used in design as a graphic basis.

Form 6 - For drawings of building products, sketch drawings of general types of atypical products and all types of text documents (subsequent sheets)

Note - The main inscription in form 6 is allowed to be used for subsequent sheets of graphic documents on engineering surveys that are not used in design as a graphic basis.

In the columns of the main inscription and additional columns to it (column numbers are indicated in brackets), the following is given:

Column 1 - designation of a document, including a text or graphic document of a section, a subsection of project documentation, a main set of working drawings, a product drawing, etc.;

In column 2 - the name of the enterprise and, if necessary, its part (complex), housing and civil complex or other construction object, which includes the building (structure), or the name of the microdistrict;

Column 3 - the name of the building (structure) and, if necessary, the type of construction (reconstruction, technical re-equipment, overhaul);

Column 4 - the name of the images placed on this sheet, in accordance with their name in the drawing. If one image is placed on a sheet, it is allowed to give its name only in column 4.

The names of specifications and other tables, as well as textual instructions relating to images, are not indicated in column 4 (except for cases when specifications or tables are made on separate sheets).

On the sheet (s) of general data on working drawings in column 4 write "General data".

In the case provided for in 5.2.3, in column 4, the name of the document or atypical product is given;

Column 5 - the name of the product and / or the name of the document;

Column 6 - symbolic designation of the type of documentation: P - for project documentation, R - for working documentation.

For other types of documentation, the column is not filled out or the conventions established in the organization's standards are given;

Column 7 is the ordinal number of the sheet of the document. On documents consisting of one sheet, the column is not filled;

Column 8 - the total number of sheets of the document. The column is filled out only on the first sheet;

In column 9 - the name or distinctive index of the organization that developed the document;

Column 10 - the nature of the work performed by the person signing the document, in accordance with Forms 3-5. In free lines, at the discretion of the design organization, the positions of specialists and managers responsible for the development and verification of the document are given. In the line under the entry "Developed" instead of the position, it is allowed to include the entry "Checked".

The signatures of the person who developed this document and the supervisor are required.

The bottom line contains the position of the person who approved the document, for example, the chief engineer (architect) of the project, the head of the department, or another official responsible for this document (sheet).

Signatures of the person responsible for the preparation of design or working documentation (chief engineer (architect) of the project) are mandatory on the general data sheets for working drawings, the most significant sheets of the graphic part of the project documentation and working drawings;

In columns 11-13 - the names and signatures of the persons indicated in column 10, and the date of signing.

Signatures of other officials and approving signatures are placed on the sheet filing field;

In columns 14-19 - information about the changes that are filled in in accordance with 7.3.21;

In column 20 - the inventory number of the original;

In column 21 - the signature of the person who accepted the original for storage, and the date of acceptance;

In column 22 - the inventory number of the original of the document, instead of which a new original was issued;

In column 23 - designation of the material of the part (the column is filled only in the drawings of the parts);

In column 24 - the mass of the product shown in the drawing, in kilograms without indicating the unit of mass. The mass of the product in other units of mass is given with the indication of the unit of mass.

Example - 2.4 t;

Column 25 - scale (put down in accordance with GOST 2.302);

Column 26 - designation of the sheet format in accordance with GOST 2.301. For an electronic document, indicate the sheet size on which the image will correspond to the established scale;

Column 27 - the short name of the customer organization.

Notes (edit)

1 In columns 13, 19, 21, when indicating the calendar date on paper, the year is indicated with the last two digits, for example 06.02.12.

2 Column 27, indicated by a dashed line, is entered if necessary.

3 Columns "Agreed" (10-13), located on the filing field, are allowed to be given only on those sheets where it is necessary. Repeat them if necessary.

4 It is allowed, if necessary, to change the location and size of additional columns placed on the filing field, in accordance with GOST 2.004.

Appendix I (required). The location of the title block, additional columns to it and the size of the frames on the sheets

Appendix I
(required)

Notes (edit)

1 The size of the lower frame is indicated in brackets.

2 The box indicated by the dashed line is entered if necessary.

Figure I.1 - Location of the title block, additional columns and frame sizes

Figure I.2 - Allowed location of the main inscription on an A4 sheet

Appendix K (mandatory). Specifications

Appendix K
(required)

Form 7 - Specification

Form 8 - Group Specification

K.1 The specifications indicate:

In the column "Pos." - positions (brands) of structural elements, installations;

In the column "Designation" - the designation of the main documents for the elements of structures, equipment, products or standards (technical conditions) for them recorded in the specification;

In the column "Name" - the name of structural elements, equipment, products, materials and their designations (brands), as well as, if necessary, the technical characteristics of equipment and products. It is allowed to indicate the name once and underline it for a group of elements of the same name.

The specification records materials that are directly included in the specified design, product, etc.

In the specification, executed in electronic form, the horizontal bar included in the designation of materials (rolled products, pipes, etc.) may be replaced with a forward slash (/);

In the column "Count." form 7 - the number of elements.

In the column "Count." Form 8 - instead of ellipsis, write "according to the scheme", "on the floor", etc., and below - the ordinal numbers of the layouts or floors;

In the column "Unit weight, kg" - weight in kilograms. It is allowed to give the mass in tons, but with the indication of the unit of mass;

In the "Note" column - additional information, for example, the unit of mass.

K.2 The dimensions of the graphs of the specification at the discretion of the developer, if necessary, can be changed.

K.3 When filling out the specifications in an automated way, the lines delimiting the horizontal lines may not be drawn.

Form 9 - Permission to amend (first sheet)

Form 9a - Permission to amend (subsequent sheets)

L.1 In the columns of permission indicate:

In column 1 - the designation of the permit, consisting of the serial number of the permit according to the permit registration book in accordance with GOST R 21.1003 and, separated by a separating character (hyphen, slash, etc.) - the last two digits of the year.

Example - 15-12; 15/12;

Column 2 - designation of the document to which the change is made;

Column 3 - the name of the construction object;

Column 4 is the next serial number assigned to the changes that are made to the document by one permit. It is indicated for the entire document, regardless of how many sheets it is made on. The serial numbers of the changes are indicated in Arabic numerals;

Column 5 - numbers of sheets of the document, which are amended;

Column 6 - the content of the change in the form of a text description and / or graphic image;

Column 7 - the code of the reason for the change in accordance with Table L.1.

Table L.1

It is allowed not to indicate the change reason code. In this case, the column is crossed out;

Column 8 - additional information;

In columns 9-11 - the names of the persons signing the permit, their signatures and the date of signing;

Column 12 - the name of the design organization and the subdivision (department) that issued the permit;

In columns 13-16 - the name of the relevant divisions or organizations, the positions and names of the persons with whom the permission is coordinated in the prescribed manner, their signatures and dates of signing, as well as the signature of the controller;

Column 17 - serial number of the permit sheet. If the permit consists of one sheet, the column is not filled out;

Column 18 - the total number of permission sheets.

K.2 It is allowed to use Form 9 for subsequent sheets of permission.

Notes (edit)

1 It is allowed to supplement the form with columns for identification of the permit in electronic form. The design organization sets the location and size of the graphs independently.

2 In columns 11, 16, when indicating the calendar date on paper, the year is indicated with the last two digits.

Form 10 - Table of registration of changes (text document)

Change registration table

Sheet (page) numbers

Total sheets (pages) in doc.

Doc no.

modified

replaced

canceled

M.1 The dimensions of the table columns in Form 10 are established by the developer of the document.

M.2 In the columns of the table of registration of changes indicate:

In the column "Change." - serial number of the document change;

In the columns "Numbers of sheets (pages) changed, replaced, new, canceled" - numbers of sheets (pages), respectively, changed, replaced, added and canceled under this permission.

When replacing all sheets of the original (with the next serial number of the document change), indicate "All" in the "replaced" column. The rest of the columns are dash;

In the column "Total sheets (pages) in the doc." - the number of sheets (pages) in the text document after making changes;

In the column "Doc. Number" - designation of permission;

M.3 When replacing all sheets of the original in the table of registration of changes in form 10, the numbers of changes and other data relating to all previously made changes to the document are not reproduced.

Form 11 - Change registration table (title page and cover)

M.4 In the columns of the table of registration of changes in form 11 indicate:

In the column "Change." - serial number of changes to a document or volume;

In the column "N doc." - designation of permission to make changes in accordance with the instructions in Appendix L;

In the column "Sign." - signature of the person responsible for the correctness of the amendment;

In the "Date" column - the date of the change.

M.5 If necessary, the number of lines can be increased.

M.6 When replacing a document or volume in the table of registration of changes in form 11, the numbers of changes and other data relating to all previously made changes are not reproduced.

H.1 The following details are given on the cover:

The name of the construction object on the cover must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);

Field 9 - volume number according to the list "Composition of design documentation" or "Composition of reporting documentation based on the results of engineering surveys" (if any);

Field 10 - year of issue of the document;

Field 11 - for placing the table of registration of changes in form 11 of Appendix M (if necessary).

H.2 The sizes of fields 1-11 are set arbitrarily; the lines of the fields indicated in the form are not applied; the numbers and names of the fields are not indicated.

H.3 It is allowed to provide additional details and attributes on the cover in accordance with the requirements established in the standards of the organization.

H.4 Cover sizes are taken depending on the format of the volume, folder or album to which it is executed.

P.1 The following details are given on the title page:

Field 1 - abbreviated, and in its absence - the full name of the parent organization (if any); indicate, as a rule, for government organizations;

Field 2 - logo (optional), full name of the organization that prepared the document;

Field 3 - number and date of issue of the certificate of admission to the relevant types of work (for the preparation of project documentation or for conducting surveys) that affect the safety of the capital construction facility;

Field 4 - short name of the ordering organization (if necessary). The name is indicated in the form: "Customer - the name of the customer organization";

Field 5 - the name of the capital construction object and, if necessary, the type of construction.

The name of the construction object on the title page must correspond to the information given in columns 2 and 3 of the main inscription (see Appendix G);

Field 6 - type of documentation (if necessary);

Field 7 - name of the document;

Field 8 - document designation;

Field 9 - volume number according to the list "Composition of project documentation" or "Composition of reporting documentation on engineering surveys" (if any);

Field 10 - positions of persons responsible for the development of the document;

Field 11 - signatures of the persons indicated in field 10, performed in accordance with GOST R 6.30. In this field, a certifying seal of the organization that prepared the document is also affixed;

Field 12 - initials and surnames of the persons indicated in field 10;

Field 13 - year of issue of the document;

Field 14 - for placing the table of registration of changes in form 11 of Appendix M (if necessary);

Field 15 - for additional columns of the title block in accordance with Appendix G. It is allowed to provide information contained in these columns in a different form in accordance with the requirements established in the organization's standards.

P.2 The sizes of fields 1-14 are set arbitrarily; the lines of these fields indicated in the form are not applied, the numbers and names of the fields are not indicated.

P.3 It is allowed to draw up a title page without frames.

Clause 4 It is allowed to provide additional details and attributes on the title page in accordance with the requirements established in the organization's standards.

A.5 The dimensions of the title page are taken depending on the format of the volume, folder or album to which it is executed.

Appendix P (reference). Examples of the execution of title pages

Appendix P
(reference)

_______________
* These examples are indicative only.

Figure R.1 - An example of the execution of the title page of a volume of design documentation

Figure R.2 - An example of the execution of the title page of a volume (folder) of working documentation

Appendix C (recommended). The composition of the project documentation. The composition of the reporting documentation based on the results of engineering surveys

C.1 The statement indicates:

In the column "Volume number" - the sequential number of the volume or the number of the volume, including the number of the section and, if available, the number of the subsection, part, book (see 4.1.1, 4.1.3), separated by dots.

Example - 1, 2.1, 2.2, 5.5.1, 5.5.2;

In the column "Designation" - the designation of the document (volume) indicated on its title page, and, if necessary, the name or distinctive index of the organization that issued the document;

In the column "Name" - the name of the document (volume) in strict accordance with the name indicated on its title page;

In the "Note" column - additional information, including the changes made.

C.2 The sizes of the columns of the statement at the discretion of the developer, if necessary, can be changed.

C.3 When filling out the sheet in an automated way, horizontal lines delimiting the lines are allowed not to be drawn.

GOST 21.101-97

UDC 691: 002: 006.354

INTERSTATE STANDARD

System of design documents for construction

BASIC REQUIREMENTS FOR DESIGN AND WORKING DOCUMENTATION

System of design documents for construction.

MAIN REQUIREMENTS FOR DESIGN AND WORKING DOCUMENTS

OKS 01.100.30

Date of introduction 1998-04-01

Foreword

1 DEVELOPED by the State Enterprise - the Center for Methodology, Regulation and Standardization in Construction (SE TsNS) of the Gosstroy of Russia

INTRODUCED by the Department for the Development of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia

2 ACCEPTED by the Interstate Scientific and Technical Commission for Standardization, Technical Regulation and Certification in Construction on December 10, 1997

3 PUT INTO EFFECT from April 1, 1998 as a state standard of the Russian Federation by the Decree of the Gosstroy of Russia dated December 29, 1997 No. 18-75

4 REPLACE GOST 21.101-93

1 area of ​​use

This standard establishes the basic requirements for design and working documentation for the construction of enterprises, buildings and structures for various purposes.

The general rules for the implementation of graphic and textual documentation established in section 5 of this standard also apply to reporting technical documentation on engineering surveys for construction.

GOST 2.004-88 ESKD. General requirements for the implementation of design and technological documents on printing and graphic devices for computer output

GOST 2.101-68 ESKD. Types of products

GOST 2.102-68 ESKD. Types and completeness of design documents

GOST 2.105-95 ESKD. General requirements for text documents

GOST 2.108-68 ESKD. Specification

GOST 2.109-73 ESKD. Basic requirements for drawings

GOST 2.113-75 ESKD. Group and basic design documents

GOST 2.114-95 ESKD. Technical conditions

GOST 2.301-68 ESKD. Formats

GOST 2.302-68 ESKD. The scale

GOST 2.303-68 ESKD. Lines

GOST 2.304-81 ESKD. Drawing fonts

GOST 2.305-68 ESKD. Images - views, sections, sections

GOST 2.306-68 ESKD. Designations of graphic materials and rules for their application in drawings

GOST 2.307-68 ESKD. Dimensioning and limit deviations

GOST 2.308-79 ESKD. Indication in the drawings of the tolerances of the shapes and arrangement of surfaces

GOST 2.309-73 ESKD. Surface roughness designation

GOST 2.310-68 ESKD. Application on drawings of designations of coatings, thermal and other types of processing

GOST 2.311-68 ESKD. Thread Image

GOST 2.312-72 ESKD. Conditional images and symbols of welded joints

GOST 2.313-82 ESKD. Conditional images and designations of permanent connections

GOST 2.314-68 ESKD. Instructions on the drawings on marking and branding of products

GOST 2.316-68 ESKD. Rules for drawing inscriptions, technical requirements and tables on drawings

GOST 2.317-69 ESKD. Axonometric projections

GOST 2.410-68 ESKD. Rules for the execution of drawings of metal structures

GOST 2.501-88 ESKD. Accounting and storage rules

GOST 21.110-95 SPDS. Specification of equipment, products and materials

GOST 21.113-88 SPDS. Accuracy characteristic designations

GOST 21.114-95 SPDS. Rules for the execution of sketch drawings of general views of atypical products

GOST 21.203-78 SPDS. Rules for accounting and storage of originals of project documentation

GOST 21.501-93 SPDS. Rules for the implementation of architectural and construction working drawings.

3 General requirements for the composition of the documentation

3.1 The composition and content of design documentation for the construction of enterprises, buildings and structures are established by the current building codes and regulations.

3.2 The composition of the working documentation for the construction of a building or structure generally includes:

a) working drawings intended for the production of construction and installation work;

b) working documentation for construction products in accordance with GOST 21.501;

c) sketch drawings of general types of non-standard products in accordance with GOST 21.114 *;

d) specifications of equipment, products and materials in accordance with GOST 21.110;

e) other attached documentation provided for by the relevant standards of the System of Design Documentation for Construction (SPDS);

f) estimate documentation in accordance with established forms.

4 General requirements for completing documentation

4.1 Project documentation

4.1.1 The project documentation intended for approval (stage-project, an approved part of the working project) is completed in volumes, as a rule, in separate sections provided for by building codes and regulations. Each volume is numbered with Arabic numerals.

Example - Volume 1 - General Explanatory Note

Volume 2 - General layout and transport

If necessary, the volumes are divided into parts. In this case, volumes are numbered by type: Volume 1.1, Volume 1.2.

4.1.2 Text and graphic materials included in the volume are completed, as a rule, in the following order:

Cover;

Title page;

Composition of the project;

Explanatory note;

Basic drawings provided by building codes and regulations.

The rules for the design of the cover, title page, content and composition of the project are given in section 9.

4.1.3 Each text and graphic document included in the volume is assigned a designation, which is indicated on the title page and in the main inscriptions.

The designation includes the basic designation established according to the system operating in the organization, and through a hyphen - the brand and / or code of the project section. The marks of the sections of the project are taken by analogy with the marks of the main sets of working drawings given in Appendix A.

Examples of

1.2345-ПЗ Section "General explanatory note"

2.2345-GT Section "General plan and transport"

3.2345-12-АС Section "Architectural and construction solutions",

ПЗ - code of the project section;

ГТ and АС - marks of sections of the project.

________________

4.1.4 Text and graphic materials, as a rule, include volume on sheets folded in A4 format GOST 2.301.

Each volume includes a maximum of 250 A4 sheets, 150 A3 sheets, 75 A2 sheets, and 50 A1 sheets.

4.1.5 General requirements for the implementation of graphic documentation are given in section 5.

Text documents are performed in accordance with GOST 2.105, taking into account the requirements of section 5 of this standard.

4.2 Shop drawings

1 Working drawings intended for the production of construction and installation work are combined into sets (hereinafter referred to as the main sets) by brands in accordance with Appendix A.

4.2.2 The main set of working drawings of any brand can be divided into several basic sets of the same brand (with the addition of a serial number to it) in accordance with the process of organizing construction and installation work.

Example - AC1; AC2; KZh1; KZh2

4.2.3 Each main set of working drawings is assigned a designation, which includes a basic designation, installed according to the system in force in the organization, and through a hyphen - the brand of the main set.

Example - 2345-12-AR,

where 2345 is the number of the agreement (contract) or the code of the construction object;

12 - number of the building or structure according to the general plan *;

2345-12 - basic designation;

AR - brand of the main set of working drawings.

________________

* For sections of the project related to the construction object as a whole (general explanatory note, master plan and transport, etc.), as well as for working drawings of linear structures, master plan, external communications, this part of the basic designation is usually excluded.

4.2.4 The main sets of working drawings include general data on working drawings, as well as drawings and diagrams provided for by SPDS standards.

General data on working drawings

4.2.5 On the first sheets of each main set of working drawings, general data on working drawings are given, including:

a) a list of working drawings of the main set according to Form 1;

b) a list of reference and attached documents in form 2;

c) a list of the main sets of working drawings in form 2;

d) a list of specifications (if there are several layouts in the main set), performed in accordance with Form 1.

e) symbols not established by state standards, and the values ​​of which are not indicated on other sheets of the main set of working drawings;

f) general instructions;

g) other data provided for by the relevant SPDS standards.

Forms 1 and 2 with instructions for filling them out are given in Appendix B.

4.2.6 The list of working drawings of the main set contains a sequential list of sheets of the main set.

4.2.7 The list of reference and attached documents is divided into sections:

a) referenced documents;

b) attached documents.

The section "Referenced Documents" indicates the documents that are referenced in the working drawings, including:

a) drawings of typical structures, products and assemblies indicating the name and designation of the series and the issue number;

b) standards, which include drawings intended for the manufacture of products, indicating their name and designation.

The project organization issues reference documents to the customer only under a separate agreement.

In the section "Attached documents" indicate the documents developed in addition to the working drawings of the main set, including:

Working documentation for construction products;

Sketch drawings of general types of atypical products *;

Specification of equipment, products and materials;

Local estimate;

Other documentation provided by the relevant SPDS standards.

The design organization issues the attached documents to the customer simultaneously with the main set of working drawings.

4.2.8 The list of the main sets of working drawings is given on the general data sheets of the main set of the leading brand **.

If there are several basic sets of working drawings of the same brand, they make up a list of sets of this brand in form 2 of Appendix B, which is given on the general data sheet for each of these sets.

* Perform as needed.

** The main set of working drawings as the leading brand is appointed by the general designer.

4.2.9 The general instructions give:

a) the basis for the development of working documentation (design assignment, approved project);

b) the mark taken in the working drawings of a building or structure conditionally as zero (as a rule, it is given on architectural and construction drawings);

c) a record of the results of checking for patentability and patent purity of technological processes, equipment, devices, structures, materials and products first used or developed in the project, as well as the numbers of copyright certificates and applications for which decisions were made to issue copyright certificates for those used in the work documentation of the invention;

d) a record that the working drawings are developed in accordance with applicable rules, regulations and standards;

e) a list of types of work for which it is necessary to draw up certificates of inspection of hidden work;

f) information about who owns this intellectual property (if necessary);

g) other necessary instructions.

The general instructions should not repeat the technical requirements placed on other sheets of the main set of working drawings, and give a description of the technical solutions adopted in the working drawings.

5. General rules for the implementation of documentation

5.1 When performing design, working and other technical documentation intended for the construction of enterprises, buildings and structures, one should be guided by the requirements of the relevant SPDS standards, as well as the standards of the Unified System for Design Documentation (ESKD).

The list of ESKD standards to be taken into account when performing graphic and textual documentation for construction is given in Appendix B.

Documentation intended for microfilming must comply with the requirements of the "Reprography" system of standards.

5.2 Drawings are performed at the optimal scale, taking into account their complexity and richness of information.

The scale on the drawings is not indicated, with the exception of product drawings and other cases provided for in the relevant SPDS standards.

5.3 The list of abbreviations of words allowed in the main inscriptions, technical requirements, tables, drawings and specifications drawn up in addition to GOST 2.316 and is given in Appendix D.

Coordination axes

5.4 On the image of each building or structure, coordinate axes are indicated and assigned an independent designation system.

Coordination axes are applied to images of a building or structure with thin dash-dotted lines with long strokes, denoted by Arabic numerals and capital letters of the Russian alphabet (except for letters: E, 3, Y, O, X, Ts, Ch, Shch, b, Y, b) in circles with a diameter of 6-12 mm.

Omissions in digital and alphabetic (except for those indicated) designations of the coordination axes are not allowed.

5.5 Figures indicate coordination axes on the side of a building and structure with a large number of axes. If there are not enough letters of the alphabet to designate the coordinate axes, the subsequent axes are designated by two letters.

Example -AA; BB; BB.

5.6 The sequence of digital and letter designations of the coordination axes is taken according to the plan from left to right and from bottom to top (Figure 1 a) or as shown in pictures 1 b, v.

5.7 The designation of the coordinate axes, as a rule, is applied to the left and lower sides of the building and structure plan.

If the coordination axes of the opposite sides of the plan do not coincide, the designations of these axes at the points of divergence are additionally applied on the upper and / or right sides.

5.8 For individual elements located between the coordination axes of the main supporting structures, additional axes are applied and denoted as a fraction:

above the line indicate the designation of the previous coordination axis;

under the line - an additional serial number within the area between adjacent coordination axes in accordance with Figure 1 G.

Picture 1

It is allowed to assign digital and letter designations to the coordination axes of half-timbered columns in the continuation of the designations of the axes of the main columns without an additional number.

5.9 In the image of a repeating element tied to several coordination axes, the coordination axes are designated in accordance with Figure 2:

« a"- when the number of coordination axes is not more than 3;

« b"-" "" "more than 3;

« v»- for all alphabetic and digital coordination axes.

If necessary, the orientation of the coordination axis to which the element is attached with respect to the adjacent axis is indicated in accordance with Figure 2. G.

Picture 2

5.10 To designate the coordination axes of the block-sections of residential buildings, the index "c" is used.

Example - 1s, 2s, Ac, Bs.

On the plans of residential buildings, composed of block sections, the designations of the extreme coordination axes of the block sections are indicated without an index in accordance with Figure 3.

Figure 3

Dimensioning, slopes, marks, inscriptions

5.11The dimension line at its intersection with extension lines, contour lines or center lines is limited by serifs in the form of thick main lines 2-4 mm long, drawn with an inclination to the right at an angle of 45 ° to the dimension line, while the dimension lines should protrude beyond the extreme extension lines by 1-3 mm.

When drawing the dimension of the diameter or radius inside the circle, as well as the angular dimension, the dimension line is limited by arrows. Arrows are also used when dimensioning radii and internal fillets.

5.12 Level marks (heights, depths) of structural elements, equipment, pipelines, air ducts, etc. from the reference level (conditional "zero" mark) are designated by a conventional sign in accordance with Figure 4 and indicated in meters with three decimal places separated from an integer comma.

Figure 4

The "zero" mark, taken, as a rule, for the surface of any structural element of a building or structure located near the planned surface of the earth, is indicated without a sign; marks above zero - with a "+" sign; below zero - with a "-" sign.

On views (facades), sections and sections, the marks are indicated on extension lines or contour lines in accordance with Figure 5, on plans - in a rectangle in accordance with Figure 6, except for the cases specified in the relevant SPDS standards.

5.13 On the plans, the direction of the slope of the planes is indicated by an arrow, above which, if necessary, the slope is put down in percent in accordance with Figure 7 or in the form of the ratio of height and length (for example, 1: 7).

It is allowed, if necessary, to indicate the slope in ppm, in the form of a decimal fraction with an accuracy of the third decimal place. In the drawings and diagrams, in front of the dimension number that determines the value of the slope, the sign "Ð" is applied, the acute angle of which should be directed towards the slope.

The slope designation is applied directly above the contour line or on the shelf of the leader line.

Figure 5

Figure 6

Figure 7

5.14 Callouts for multi-layer structures should be performed in accordance with Figure 8.

5.15 Position numbers (element marks) are applied on the shelves of leader lines drawn from the images of the component parts of the object, next to the image without the leader line or within the contours of the depicted parts of the object in accordance with Figure 9.

For a small-scale image, leader lines end without an arrow and a point.

5.16 The font size for the designation of the coordinate axes and positions (marks) should be one or two numbers larger than the font size adopted for dimension numbers in the same drawing.

Images (sections, sections, views, fragments)

5.17 Cross-sections of a building or structure are designated in Arabic numerals sequentially within the main set of working drawings.

Self-numbering is allowed only for sections of individual sections of a building, structure or installations, all drawings of which are placed on one sheet or a group of sheets and if these drawings do not contain references to sections located on other sheets of the main set of working drawings.

It is allowed to designate cuts with capital letters of the Russian alphabet.

The direction of view for a section along the plan of a building and structure is taken, as a rule, from bottom to top and from right to left.

5.18 If individual parts of the view (facade), plan, section require a more detailed image, then in addition, the detail elements - nodes and fragments - are performed.

5.19 When depicting a node, the corresponding place is marked on the view (facade), plan or section with a closed solid thin line (as a rule, a circle or an oval) with the designation on the leader line of the serial number of the node in Arabic numerals in accordance with Figure 10.

If the node is placed on another sheet, then the sheet number is indicated under the shelf of the leader line (Figure 10 a) or on the shelf of the leader line next to it, in brackets, in accordance with Figure 10 b.

If necessary, references to a unit placed in another main set of working drawings, or to a typical unit, indicate the designation and sheet number of the corresponding main set of working drawings in accordance with Figure 10 v or a series of working drawings of typical units and the issue number in accordance with Figure 10 G.

Figure 10

Above the image of the node, indicate in a circle its ordinal number in accordance with Figure 12 a or 12 b.

Figure 11

Figure 12

The node, which is a complete mirror image of another (main) performance, is assigned the same serial number as the main performance, with the addition of the "n" index.

5.20 Fragments of plans, sections, facades, as a rule, are marked with curly braces in accordance with Figure 13.

Figure 13

Under the curly brace, as well as above the corresponding fragment, the name and serial number of the fragment are applied. If the fragment is placed on another sheet, then give a link to this sheet.

5.21 Images up to the axis of symmetry of symmetrical plans and facades of buildings and structures, layouts of structural elements, layouts of technological, energy, sanitary and other equipment are not allowed.

5.22 If an image (for example, a plan) does not fit on a sheet of an accepted format, then it is divided into several sections, placing them on separate sheets.

In this case, on each sheet, where the area of ​​the image is shown, a diagram of the whole image is given with the necessary coordination axes and the conventional designation (hatching) of the area of ​​the image shown on this sheet in accordance with Figure 14.

Note - If the drawings of the image areas are placed in different basic sets of working drawings, then the designation of the corresponding basic set is indicated above the sheet number (according to 4.2.2)

Figure 14

5.23 If the floor plans of a multi-storey building have slight differences from each other, then the plan of one of the floors is completely fulfilled, for other floors only those parts of the plan are performed that are necessary to show the difference from the plan shown in full.

Under the name of the partially depicted plan, an entry is given:

"For the rest, see the plan (name of the fully depicted plan)."

5.24 The names of the floor plans of the building and structure indicate the elevation of the finished floor or the floor number, or the designation of the corresponding cutting plane.

Examples of

1. Elevation plan 0.000

2. Plan 2 - 9 floors

3. Plan 3 - 3

When executing a part of the plan, the title indicates the axes that limit this part of the plan.

Example -Elevation plan 0.000 between axes 1 - 8 and A - D

It is allowed in the name of the floor plan to indicate the purpose of the premises located on the floor.

5.25 The names of sections of the building (structure) indicate the designation of the corresponding cutting plane.

Example -Section 1 - 1

5.26 The names of the facades of a building and structure indicate the extreme axes between which the facade is located.

Example -Facade 1 - 12

Basic inscriptions

5.27 Each sheet of a graphic and text document must have a title block and additional columns to it. Forms of main inscriptions and instructions for filling them out are given in Appendix D.

5.28 In the design and working documentation, the main inscription is drawn up:

a) on the sheets of the main sets of working drawings and the main drawings of project documentation - according to Form 3;

b) on the first sheet of drawings of building products - according to Form 4;

c) on the first sheets of text documents and sketch drawings of general types of atypical products - according to Form 5;

d) on the subsequent sheets of drawings of construction products, text documents and sketch drawings of general views - in accordance with Form 6.

It is allowed on the first sheet of the drawing of a building product to carry out the main inscription according to Form 5.

5.29 In the reporting technical documentation based on the results of engineering surveys, the main inscription is drawn up:

a) on sheets of graphic documents used in design as a background - according to Form 3;

b) on the first sheets of other graphic and text documents - according to Form 5, on subsequent sheets - according to Form 6.

5.30 The location of the title block and additional columns to it, as well as the dimensional frames on the sheets are given in Appendix E.

5.31 Main inscriptions, additional columns to them and frames are performed with solid thick main and solid thin lines in accordance with GOST 2.303 in accordance with Appendix D.

5.32 Graphic and text documents, brochured in the form of a volume, album, issue or in another publishing form, are issued with a title page.

The rules for the execution of the title page are given in section 9.

5.33 It is allowed not to carry out the title page and not to brochure text working documents of a small volume. In this case, the first sheet of the document is drawn up with the main inscription in form 3, the subsequent ones - in form 6.

6 Rules for the implementation of specifications on drawings

6.1 To the layout of the elements of the prefabricated structure, monolithic reinforced concrete structure, to the drawings of installations (blocks) of technological, sanitary and other equipment, a specification is drawn up in accordance with Form 7 of Appendix G.

When making drawings by the group method, group specifications are made in accordance with Form 8 of Appendix G.

6.2 Specifications of building products are in accordance with GOST 21.501.

7 Rulesmaking changes to the working documentation issued to the customer

7.1 A change to a working document previously issued to the customer is any correction, deletion or addition to it of any data without changing the designation of this document. The designation of a document may only be changed if the same designation has been erroneously assigned to different documents or an error has been made in the designation of the document.

7.2 Changes are made to the original document. Changes to calculations are not allowed.

7.3 Copies of sheets (modified, additional and issued instead of replaced sheets) of working documentation are sent to organizations to which copies of documents were previously sent, simultaneously with copies of general data of the corresponding main set of working drawings, updated in accordance with clause 7.5.

7.4

7.4.1 Amendment of a document is carried out on the basis of a permission to amend (hereinafter - permission), drawn up in accordance with Form 9 of Appendix I.

The permission is approved by the head of the organization-developer of the document or, on his behalf, by another official.

7.4.2 Permission serves as the basis for obtaining original documents for making changes to them.

7.4.3 Changes for each document (for example, the main set of working drawings, specification of equipment for products and materials) are issued with a separate permit.

It is allowed to draw up one general permission for changes made simultaneously to several documents, if the changes are interrelated or the same for all the changed documents.

7.5 Alteration

7.5.1 Changes to the originals of documents are made by strikethrough or erasure (washing off). In this case, the physical condition of the original is taken into account.

7.5.2 After making changes, the images, letters, numbers, signs must be clear, the thickness of the lines, the size of the gaps, etc. must be performed according to the rules stipulated by the relevant standards of ESKD and the system of standards "Reprography".

7.5.3 Resizable sizes, words, signs, inscriptions, etc. are crossed out with solid thin lines and new data are added next.

7.5.4 When the image (part of the image) is changed, it is encircled with a solid thin line, forming a closed contour, and crossed out crosswise with solid thin lines.

A new image of the changed area is performed on a free margin of the sheet or on another sheet without rotations.

7.5.5 Modified, canceled and additional areas of the image are assigned a designation consisting of the serial number of the next change in the document and through the dot of the serial number of the changed (canceled, additional) image area within this sheet. In this case, the designation of the change of the replaced image is assigned to the new image of the changed area.

If a new image of the changed area is placed on another sheet, then the change designation assigned to it is saved and is not taken into account in the change table of this sheet.

7.5.6 About each change, including about a change corrected by erasure (washout), outside the image, a change designation is applied in a parallelogram in accordance with Figure 15.

Figure 15

A solid thin line is drawn from the parallelogram to the changed area.

7.5.7 Modified sizes, words, signs, inscriptions, etc. that are closely spaced from each other, are enclosed with a solid thin line forming a closed contour, without striking through in accordance with Figure 16.

7.5.8 If a new image of the changed area is placed on another sheet, then the number of the sheet on which the new image is located in accordance with Figure 17 is also indicated for the replaced image.

Figure 16

Figure 17

7.5.9 Above the new image of the changed area, the designation of the change of the replaced image is placed in the parallelogram, and in the case of the parallelogram, indicate: "Instead of the crossed out".

If a new image of the changed area is placed on another sheet, then with a parallelogram indicate: "Instead of the one crossed out on the sheet (the number of the sheet on which the replaced image is located)" in accordance with Figure 18.

Figure 18

7.5.10 If a new image of the changed area is placed near the replaced one, then they are connected by leader lines with a change designation in accordance with Figure 19.

Figure 19

Above the additional image, the designation of the change is placed in the parallelogram, and with the parallelogram, indicate: "Addition" in accordance with Figure 20.

Figure 20

7.5.11 When the image (part of the image) is canceled, when the change is indicated, indicate: "Canceled".

7.5.12 If there is not enough space for making changes or a violation of the clarity of the image during correction is possible, then a new original is made taking into account the changes introduced and its previous designation is retained.

If one or more sheets of the original are replaced or added, then the inventory number assigned to the original is retained on them.

When replacing all sheets of the original, a new inventory number is assigned to it.

7.5.13 When making changes to the sheets of the main set of working drawings in the list of working drawings of this set on the general data sheets in the column "Note" indicate:

a) when making the first change - "Amendment 1".

When making subsequent changes - additionally the successive numbers of changes, separating them from the previous ones with a semicolon.

Example -Rev. 1; 2; 3

b) on the replaced sheets with the change number - "(Zam.)".

Example -Rev. 1 (Deputy)

c) on canceled sheets with the change number - "Canceled".

Example -Rev. 1 (Canceled)

d) on additional sheets with the change number - "(New)".

Example -Rev. 1 (New)

7.5.14 If additional sheets are included in the main set of working drawings, then they are assigned successive serial numbers and recorded in the continuation of the list of working drawings of the corresponding main set.

If there is not enough space in the list of working drawings for recording additional sheets, the continuation of the list is transferred to the first of the additional sheets. At the same time, at the end of the list of working drawings, placed in the "General data", an entry is made:

"Continuation of the list, see the sheet (sheet number)", and above the list on an additional sheet, place the heading: "List of working drawings of the main set (Continued)".

The numbers and names of the canceled sheets in the list of working drawings are crossed out.

When changing the names of sheets, make the appropriate changes in the column "Name".

7.5.15 When changing the total number of sheets of the document on its first sheet in the title block, make the appropriate changes in the column "Sheets".

7.5.16 When completing additional and cancellation of previously executed attached documents, corrections are made to the list of reference and attached documents of the corresponding main set of working drawings.

7.5.17 When completing additional and cancellation of previously completed main sets of working drawings, corrections are made to the list of main sets of working drawings.

7.5.18 Changes made to the original are indicated in the table of changes placed in the title block.

It is allowed to place a table of changes outside the title block (above it or to the left of it) in the same form.

7.5.19 The table of changes indicates:

a) in the column "Change." - serial number of the document change;

b) in the column "Number of accounts." - the number of changing areas of the image on a given sheet within the next change;

c) in the column "Sheet" - on the sheets issued instead of the replaced ones - "Deputy", on the sheets added again - "New".

When replacing all sheets of the original (with the next number of document changes) on the first sheet in the "Sheet" column indicate "All". In this case, the table of changes on other sheets of this original is not filled out.

In other cases, a dash shall be placed in the "Sheet" column;

d) in the column "Doc. No." - designation of permission;

e) in the column "Sign." - the signature of the person responsible for the correctness of the amendment (the signature of the person responsible for regulatory control is affixed to the field for filing the sheet);

f) in the "Date" column - the date of the amendment.

7.5.20 The table of changes does not take into account the corrections made to the statement of the general data sheet in connection with the introduction of changes to the sheets of the main set and the attached documents.

7.5.21 When making changes to text documents, it is recommended to follow the table for registering changes in form 10 of the provision K. The table for registering changes is placed on the title page of the text document.

7.5.22 Significant changes in text documents are made in one of the following ways:

a) replacement of all or individual sheets of the document;

b) the release of new additional sheets.

When changing the originals of text documents, it is allowed, when adding a new sheet, to assign it the number of the previous sheet with the addition of the next Arabic numeral, separating it from the previous point.

Example - 3.1

In this case, the total number of sheets is changed on the first sheet.

In text documents containing mostly solid text, it is allowed, when adding a new paragraph, to assign it the number of the previous paragraph with the addition of the next lowercase letter of the Russian alphabet, and when canceling the paragraph, keep the numbers of subsequent paragraphs.

7.5.23 When canceling or replacing a document, all canceled and replaced sheets of the original are crossed crosswise with solid thin lines and a stamp is affixed in accordance with Form 11 of Appendix L.

8 Rules for linking working documents

8.1. Working documentation - typical projects, standard design solutions (intended for binding) and working documentation for reuse are subject to binding to a specific construction site. Each sheet of the linked documentation is stamped in accordance with Appendix M:

a) on the first sheet - according to form 12;

b) on subsequent sheets - according to Form 13.

8.2 Covers and title pages of the main sets of working drawings of standard projects (standard design solutions), published in the form of albums and issues, are not tied and sent to the customer.

8.3 The anchor stamp is applied on a free margin of the sheet, preferably above or to the left of the title block.

8.4 It is allowed not to apply a binding stamp on permanent working drawings of structures, products and assemblies in the event of their repeated use by the organization that developed and approved these drawings. These working drawings are recorded in the section of the attached documents without changing the designation.

8.5 Changes when binding are made in accordance with paragraphs. 7.5.1- 7.5.4, 7.5.14-7.5.17 and subject to the following additional requirements:

a) if there are two or more variable areas of the image, then they are assigned serial numbers, which are affixed in Roman numerals on the leader line shelf in accordance with Figure 21;

b) above the changed area indicate the ordinal number of the changed area of ​​the image and the inscription "Instead of the crossed out" in Roman numerals in accordance with Figure 22.

If a new image (part of an image) is placed on another sheet, then the number of the sheet on which the new image is located is also indicated for the replaced image.

Figure 21

Figure 22

8.6 The main inscriptions on the sheets of the linked documentation, published in the form of albums and issues, are left unchanged.

8.8 Canceled sheets are excluded from the attached documentation without changing the general numbering of sheets.

9 Rules for registration of bound documentation

9.1 Each bound document is drawn up with a cover according to Form 14, given in Appendix H. The cover is not numbered and is not included in the total number of pages.

9.2 The first sheet of a text (graphic) document or several bound documents is the title page. The title page is performed in accordance with Form 15 of Appendix P. An example of filling out the title page is given in the same place.

9.3 All pages of a bound document, starting with the title document, must have continuous pagination. In this case, the title page is not numbered.

The page number on sheets of text and graphic documents is indicated in the upper right corner of the working field of the sheet.

In addition, in the title block of text and graphic documents included in a volume, album or issue and having an independent designation, indicate the sequential numbering of sheets within the document with one designation.

9.4 When completing several documents in the form of a volume, album or issue, after the title page, "Contents" is given, which is performed in accordance with Form 2 of Appendix B.

The first sheet of the "Contents" is drawn up with the main inscription according to Form 5 of Appendix D, the subsequent ones - according to Form 6 of Appendix D. "Contents" are assigned a designation consisting of the designation of the document and the cipher "C".

Example -2345-GT.S, 2345-11-KZh.IS, 2345-11-TX.NS

9.5 Title pages of project documents are drawn up with signatures:

the head or chief engineer of the organization;

chief engineer (architect) of the project.

The title pages of working documents are signed by the person in charge - the chief engineer (architect) of the project.

The title page of the reporting survey documentation is drawn up taking into account the additional requirements of the relevant building codes and regulations.

9.6 The composition of the project, according to 4.1.2, is given in a statement executed in form 16 of Appendix R.

The statement provides a sequential list of volumes of project documentation.

The first sheet of the statement is drawn up with the main inscription in form 5 of Appendix D, the subsequent ones - in form 6 of Appendix D.

The statements are assigned a designation consisting of the basic designation of the document and, through a hyphen, the cipher "SP".

Example - 2345-SP

Stamps of the main sets of working drawings

Table A.1

Name of the main set of working drawings

Note

Production technology

Technological communications

When combining working drawings of all technological communications

General layout and transport facilities

When combining working drawings of the master plan and transport structures

General plan

Architectural solutions

Interiors

Working drawings can be combined with the main set of brands AR and AC

Reinforced concrete structures

Wooden structures

Architectural and construction solutions

When combining working drawings of architectural solutions and building structures

Metal detailing structures

Plumbing and sewerage

Heating, ventilation and air conditioning

Thermal mechanical solutions for boiler rooms

Air supply

Dust extraction

Cold supply

Gas supply (internal devices)

Power equipment

Electric lighting (interior)

Communication systems

Radio communication, radio broadcasting and television

Firefighting

Fire alarm

Security and burglar-fire alarms

Hydraulic solutions

Automation ...

Many replace the name and brand of the corresponding main set of working drawings

Integrated automation

When combining working drawings of various technological processes and engineering systems

Anti-corrosion protection of structures, structures

Corrosion protection of technological devices, gas ducts and pipelines

Thermal insulation of equipment and pipelines

Car roads

Railways

Vehicle structures

When combining working drawings of roads, railways and other roads

External water supply networks

External sewerage networks

External water supply and sewerage networks

When combining working drawings of external water supply and sewerage networks

Thermal mechanical solutions for heating networks

Outdoor gas pipelines

Outdoor electric lighting

Power supply

Note ¾ If necessary, additional marks of the main sets of working drawings can be assigned. In this case, for stamps, capital letters (not less than three) of the Russian alphabet are used, corresponding, as a rule, to the initial letters of the names of the main set of working drawings.

APPENDIX B

(required)

General data sheet for working drawings

Form 1 - List of working drawings of the main set

Specification Sheet

Instructions for filling out the list of working drawings of the main set

In the list of working drawings of the main set indicate:

a) in the column "Sheet" - the serial number of the sheet of the main set of working drawings;

b) in the column "Name" - the name of the images placed on the sheet, in strict accordance with the names given in the title block of the sheet;

c) in the "Note" column - additional information, for example, about the changes made to the working drawings of the main set.

Guidelines for Completing the Specification Sheet

The specification sheet indicates:

a) in the "Sheet" column - the number of the sheet of the main set of working drawings, on which the specification is placed;

b) in the column "Name" - the name of the specification in strict accordance with its name indicated on the drawing;

c) in the "Note" column - additional information, including about changes to the specifications.

Form 2 - List of main sets of working drawings

List of reference and attached documents

Instructions for filling out the list of the main sets of working drawings

In the list of the main sets of working drawings indicate:

a) in the column "Designation" - the designation of the main set of working drawings and, if necessary, the name or distinctive index of the organization that issued the document;

b) in the column "Name" - the name of the main set of working drawings;

c) in the "Note" column - additional information, including about changes in the composition of the main sets of working drawings.

Instructions for completing the list of reference and attached documents

The list of reference and attached documents indicate:

a) in the column "Designation" - the designation of the document and, if necessary, the name or distinctive index of the organization that issued the document;

b) in the column "Name" - the name of the document in full accordance with the name indicated on the title page or in the title block;

c) in the "Note" column - additional information, including about the changes made to the recorded documents that are part of the working documentation.

APPENDIX B

Mandatory

The list of ESKD standards to be taken into account when performing graphic and textual documentation for construction

Table B.1

Designation and title of the standard

Conditions of application of the standard

GOST 2.004-88

ESKD. General requirements for the implementation of design and technological documents on printing and graphic devices for computer output

GOST 2.101-68

ESKD. Types of products

GOST 2.102-68

ESKD. Types and completeness of design documents

Taking into account the requirements of GOST 21.501 related to the implementation of drawings of building products

GOST 2.105-95

ESKD. General requirements for text documents

Taking into account the requirements of Sections 4, 5 and 9 of this standard

GOST 2.108-68

ESKD. Specification

Taking into account the requirements of section 6 of this standard and GOST 21.501

GOST 2.109-73

ESKD. Basic requirements for drawings

GOST 2.113-75

ESKD. Group and basic design documents

Taking into account the requirements of GOST 21.501

GOST 2.114-95

ESKD. Technical conditions

Taking into account the requirement 5.27, 5.28, 5.30-5.32 section 5 and section 9 of this standard. 3.7.1 and 3.8 GOST 2.114 are not taken into account

GOST 2.301-68

ESKD. Formats

Taking into account the requirements of the relevant SPDS standards

GOST 2.302-68

ESKD. The scale

GOST 2.303-68

ESKD. Lines

GOST 2.304-81

ESKD. Drawing fonts

GOST 2.305-68

ESKD. Images - views, sections, sections

Taking into account the requirements of 5.17-5.26 of this standard

GOST 2.306-68

ESKD. Designations of graphic materials and rules for their application in drawings

Taking into account the requirements of GOST 21.302, tables 4 and 5

GOST 2.307-68

ESKD. Dimensioning and limit deviations

Taking into account the requirements of 5.11-5.13 of this standard

GOST 2.308-79

ESKD. Indication in the drawings of the tolerances of the shapes and arrangement of surfaces

Taking into account the requirements of GOST 21.113

GOST 2.309-73

ESKD. Surface roughness symbols

GOST 2.310-68

ESKD. Application on drawings of designations of coatings, thermal and other types of processing

GOST 2.311-68

ESKD. Thread Image

GOST 2.312-72

ESKD. Conditional images and symbols of welded joints

GOST 2.313-82

ESKD. Conditional images and designations of permanent connections

GOST 2.314-68

ESKD. Instructions on the drawings on marking and branding of products

GOST 2.315-68

ESKD. Simplified and schematic illustrations of fasteners

GOST 2.316-68

ESKD. Rules for drawing inscriptions, technical requirements and tables on drawings

Taking into account the requirements of 5.14-5.16 of this standard

GOST 2.317-69

ESKD. Axonometric projections

GOST 2.410-68

ESKD. Rules for the execution of drawings of metal structures

GOST 2.501-88 ESKD. Accounting and storage rules

In the part of the form of the inventory book, subscriber card and instructions for folding drawings

Note - The conditions for the application of ESKD standards of classification group 7 are determined by the corresponding SPDS standards.

List of allowed abbreviations of words (addition to GOST 2.316)

Table D.1

Full name

Reduction

Highway

Anti-seismic seam

Architect

Asphalt concrete

Concrete, concrete

Ventilation chamber

ventilation chamber

Chief Engineer

Ch. Ing. (*)

Chief engineer (architect) of the project

GUI (HAP) (*)

Chief Specialist

Ch. specialist. (*)

Expansion joint

Director

Document

Admissible

unit of measurement

Unit rev. (T)

Cap. (c, t)

Railway

Reinforced concrete, reinforced concrete

Manager

Insulation, insulating

Institute

Design

Coefficient

Efficiency

Staircase, staircase

Workshop (in design organizations)

Materials (edit)

materials (t)

Mounting

norm. load

Equipment

Checked

calc. load

Sanitary-technical

dignity tech.

Toilet

dignity knot

Well

Snow

Expansion joint

Technological

Rail head level

lvl. r. (and)

Ground level

Clean floor level

lvl. p.p. (and)

Fundamental

Cement, cement

Cement concrete

Plaster

Crushed stone, crushed stone

Electric

e-t (etc. t)

Note - Abbreviations marked with (*) are used only in the title block; (t) - in tables; (c) - with numbers or codes; (and) - on graphic images

APPENDIX E

(required)

Title blocks and additional columns to it

Form 3 - For sheets:

basic sets of working drawings;

main drawings of sections of project documentation;

graphic documents for engineering surveys


Form 4 - Dli drawings of building products (first sheet)


Form 5 - Forall types of text documents (first sheets)


Note - The main inscription in form 5 is allowed to be used for graphic documents on engineering surveys that are not used as a background

Form 6 - For drawings of building products and all types of text documents (subsequent sheets)

Note - The main inscription in form 6 is allowed to be used for graphic documents on engineering surveys that are not used as a background

Instructions for filling in the title block and additional columns to it

In the columns of the main inscription and additional columns to it (column numbers are indicated in brackets), the following is given:

a) in column 1 - designation of the document, including the project section, the main set of working drawings, product drawing, text document, etc.;

b) in column 2 - the name of the enterprise, housing and civil complex or other construction object, which includes the building (structure), or the name of the microdistrict;

c) in column 3 - the name of the building (structure) and, if necessary, the type of construction (reconstruction, expansion, technical re-equipment, overhaul);

d) in column 4 - the name of the images placed on this sheet, in strict accordance with the name in the drawing.

The names of specifications and other tables, as well as textual indications related to images, are not indicated in the column;

e) in column 5 - the name of the product and / or the name of the document;

f) in column 6 - designation of the design stage:

1) P - for project documentation, including the approved part of the working project;

2) R - for working documentation;

g) in column 7 - the serial number of the sheet or page of the text document for double-sided printing. On documents consisting of one sheet, the column is not filled;

i) in column 8 - the total number of sheets of the document. The column is filled out only on the first sheet.

On the first sheet of a text document in duplex printing, indicate the total number of pages;

j) in column 9 - the name or distinctive index of the organization that developed the document;

k) in column 10 - the nature of the work performed (developed, checked, normative control).

Depending on the design stage, complexity and significance of the document, it is allowed to fill in free lines at the discretion of the organization's management (indicate the positions of the persons responsible for the development of the document (drawing);

l) in columns 11-13 - the names and signatures of the persons indicated in column 10, and the date of signing.

Signatures of other officials and approving signatures are placed on the sheet filing field;

m) in columns 14-19 - columns of the table of changes, which are filled in in accordance with clause 7.5.19;

o) in column 20 - the inventory number of the original;

p) in column 21 - the signature of the person who accepted the original for storage and the date of acceptance (date, month, year);

c) in column 22 - the inventory number of the original of the document, which was replaced by the original;

r) in column 23 - designation of the material of the part (the column is filled in only on the drawings of the parts);

y) in column 24 - the mass of the product shown in the drawing, in kilograms without indicating the unit of measurement. The mass of the product in other units of measurement is given with the indication of the unit of measurement.

Example - 2,4 T;

t) in column 25 - scale (put down in accordance with GOST 2.302);

w) in column 26 - the signature of the person who copied the drawing (if necessary).

APPENDIX E

(required)

Location of the title block, additional columns to it

and dimensional frames on sheets

Note - Dimensions in brackets are for the scope of typical project documentation.

APPENDIX G

(required)

Form 7 - WITHspecification

Form 8 - GRupp specification

Instructions for completing BOM and group BOM

The specifications indicate:

a) in the column "Pos." - positions (brands) of structural elements, installations;

b) in the column "Designation" - the designation of the main documents for the elements of structures, equipment and products recorded in the specification, or standards (technical conditions) for them;

c) in the column "Name" - the names of structural elements, equipment and products and their brands. It is allowed to indicate the name once and underline a group of elements of the same name;

d) in the column "Qty." form 7 - the number of elements. In the column “Number ...” of form 8, instead of ellipsis, write “according to the scheme”, “on the floor”, etc., and below - the ordinal numbers of the layouts or floors;

e) in the column "Mass, unit kg" - the mass in kilograms. It is allowed to give the mass in tons, but with the indication of the unit of measurement;

f) in the column "Note" - additional information, for example, the unit of measurement of mass.

APPENDIX AND

(required)

Form 9 - Permission to make changes

Instructions for filling out a change authorization

In the columns of permission indicate:

a) in column 1 - the designation of the permit, consisting of the serial number of the permit according to the permit registration book in accordance with GOST 21.203 and hyphenated by the last two digits of the year.

Example - 15-97;

b) in column 2 - designation of the document to which the change is made;

c) in column 3 - the name of the enterprise under construction, building (structure);

d) in column 4 - the next serial number assigned to the changes that are made to the document with one permit. It is indicated for the entire document, regardless of how many sheets it is made on. The serial numbers of the changes are indicated in Arabic numerals;

e) in column 5 - the numbers of the sheets of the document, which are amended;

f) in column 6 - the content of the change in the form of a text description and / or graphic image;

g) in column 7 - the code of the reason for the change in accordance with the table

i) in column 8 - additional information;

j) in columns 9-11 - the names of the persons signing the permit, their signatures and the date of signing;

k) in column 12 - the name of the design organization and the subdivision (department) that issued the permit;

l) in columns 13-16 - the name of the relevant divisions or organizations, the positions and names of the persons with whom the permission is coordinated in the prescribed manner, their signatures and dates of signing, as well as the signature of the controller;

m) in column 17 - the serial number of the permit sheet. If the permit consists of one sheet, the column is not filled out;

o) in column 18 - the total number of permission sheets.

Form 10 - Change registration table

Instructions for filling out the change registration table

In the columns of the table of registration of changes indicate:

a) in the columns "Change", "Doc. number", "Subn." and "Date" - similar to filling in the corresponding columns of the table of changes;

b) in the columns "Numbers of sheets (pages) changed, replaced, new, canceled" - numbers of sheets (pages) respectively changed, replaced, added and canceled under this permission.

When replacing the entire document in the column "Numbers of sheets (pages) replaced" indicate "All";

c) in the column "Total sheets (pages) in the doc." - the number of sheets (pages) in the document. The column is filled in if the columns "Numbers of sheets (pages), new" and / or "Numbers of sheets (pages), canceled" are filled in.

APPENDIX L

(required)

Form 11 - Cancellation (replacement) stamp of original document sheets

Instructions for filling in the cancellation (replacement) stamp of the original document sheets

The stamp indicates:

a) in line 1 - the serial number of the next change in the document, according to which the sheet was canceled or replaced (for example, "Amendment 3"). When canceling a sheet, the word "Replaced" in the stamp shall be crossed out;

b) in columns 2-5 - position, surname, signature of the person responsible for making the changes, and the date of signing.

APPENDIX M

(required)

Form 12 - Anchor stamp (first sheet)


Form 13 - Binding Stamp (Subsequent Sheets)

Guidelines for filling out anchor stamps

When filling in the stamps, the bindings indicate:

a) in column 1 - the new designation of the linked document;

b) in column 2 - the name of the organization that performed the link;

c) in column 3 - the name of the enterprise under construction, building or structure for which the link is made;

d) in columns 4-7 - the positions and surnames of the persons responsible for the binding, as well as the person who carried out the standard control, their signatures and the date of signing;

e) in column 8 - the inventory number assigned to the linked document;

f) in column 9 - the number of sheets of the attached document;

g) in columns 10, 11 - the signature of the person who accepted the attached document for storage, and the date of signing.

APPENDIX H

(required)

Form 14 - Cover

Note - The name of the governing body is indicated for state organizations.

APPENDIX P

(required)

Form 15 - Title page

Notes (edit)

1 The name of the governing body is indicated for state organizations.

2 The field for signing the document is filled in in accordance with the instructions in section 9.

An example of a title page

APPENDIX P

(required)

Form 16 - The composition of the project

Instructions for completing the statement

The statement indicates:

In the column “Volume number” - the number of the volume or its part;

In the column "Designation" - the designation of the document indicated on the title page, and, if necessary, the name or distinctive index of the organization that issued the document;

In the column "Name" - the name of the document in strict accordance with the name indicated on the title page;

In the column "Note" - additional information.

Key words: working documentation, working drawings, general data on working drawings, composition, basic sets, specifications, amendments, binding, project documentation, graphic and text documents, title page, title blocks, signatures.

1 area of ​​use

3 General requirements for the composition of the documentation

4 General requirements for completing documentation

4.1 Project documentation

4.2 Shop drawings

General data on working drawings

5 General rules for the execution of documentation

Coordination axes

Dimensioning, slopes, marks, inscriptions

Images (sections, sections, views , fragments)

Basic inscriptions

6 Rules for the implementation of specifications on drawings

7 Rules for making changes to the working documentation issued to the customer

7.4 Permission to change

7.5 Changes

8 Rules for linking working documents

9 Rules for registration of bound documentation

Appendix A Marks of the main sets of working drawings

Appendix B Forms 1 and 2 - Sheets of general data for working drawings

Appendix B List of ESKD standards to be taken into account when performing graphic and textual documentation for construction

Appendix D List of allowed abbreviations of words (addition to GOST 2.316)

Appendix E of Forms 3-6 - Title blocks and additional columns to it

Appendix E Location of the title block, additional columns to it and dimension frames on sheets

Appendix G Forms 7 and 8 - Specifications

Appendix I Form 9 - Authorization to Change

Appendix K Form 10 - Table of registration of changes

Appendix L Form 11 - Stamp of cancellation (replacement) of sheets of the original document

Appendix M Forms 12 and 13 - Anchor stamps (first and subsequent sheets)

Appendix H Form 14 - Cover

Appendix P Form 15 - Title page. An example of a title page

Appendix P Form 16 - Project Composition

GOST R 21.1101-2013 Basic requirements for design and working documentation

The goals and principles of standardization in the Russian Federation are established by the Federal Law of December 27, 2002 No. 184-FZ "On technical regulation", and the rules for the application of national standards of the Russian Federation - GOST R 1.0-2004 "Standardization in the Russian Federation. Basic provisions "

Information about the standard GOST R 21.1101-2013

  • DEVELOPED by the Open Joint Stock Company Center for Methodology of Rationing and Standardization in Construction (OJSC TsNS)
  • SUBMITTED by the Technical Committee TC 465 "Construction"
  • APPROVED AND PUT INTO EFFECT by the Order of the Federal Agency for Technical Regulation and Metrology dated June 11, 2013 No. 156-ST from 01.01.2014.
  • This standard implements the norms of the Town Planning Code of the Russian Federation dated December 29, 2004, No. 190-FZ
  • REPLACE GOST R 21 .1101-2009

3. TERMS, DEFINITIONS AND ABBREVIATIONS

3.1 Terms and definitions

In GOST R 21.1101-2013 "Basic requirements for design and working documentation", the terms according to GOST R 21.1001, GOST R 21.1002, GOST R 21.1 003 are used, as well as the following terms with the corresponding definitions:

3.1.1 title block- a set of information about the project document contained in the columns of the table of the established form, placed on the sheets of the design and working documentation.

3.1.2 basic set of working drawings- a graphic document containing the necessary and sufficient information in the form of drawings and diagrams, intended for the production of construction and installation work of a certain type (brand).

3.1.3 complete set of working documentation- a set of basic sets of working drawings required for the construction of a building or structure, supplemented by the attached and referenced documents.

4 brand- an alphabetic or alphanumeric index included in the designation of working documentation and determining its relation to a certain type of construction and installation work, or designating the main distinctive features of building structures and their elements.

5 specification of equipment, products and materials- a text design document that defines the composition of equipment, products and materials, intended for the acquisition, preparation and implementation of construction.

3.1.6 General sketch drawing of a non-standard product- a document defining the initial design of a non-standard product, containing a simplified image, basic parameters and technical requirements for the product in the amount of initial data (tasks) required for the development of design documentation.

3.1.7 atypical product- a product (structure, device, mounting block) of technological systems, internal and external systems and networks of engineering and technical support of buildings and structures, first developed and manufactured, as a rule, at the installation site (in the procurement workshop of the installation organization).

3.1.8 building structure- a part of a building or structure that performs certain load-bearing, enclosing and (or) aesthetic functions.

3.1.9 product of construction- a product intended for use as an element of buildings, structures and building structures.

3.1.10 structural element- an integral part of a prefabricated or monolithic structure.

3.1.11 building material- material, including piece, intended for the manufacture of building products and the construction of building structures of buildings and structures.

3.1.12 equipment- technological equipment (machines, apparatus, mechanisms, lifting and other technical means ensuring the appropriate technological process), as well as engineering equipment of buildings and structures, providing safe and favorable conditions for the life of people.

3.1.13 coordination axis- one of the coordination lines that determine the division of a building or structure into modular steps and floor heights.

3.1.14 plan- top view or horizontal section of a building or structure.

3.1.15 facade- orthogonal projection of the outer wall of a building or structure onto a vertical plane.
Note... There are main, side, courtyard facades, etc. 3.1.16

3.1.16 document details- a document design element containing information about it.
Note. Typically, a props are made up of attributes (compound props).

3.1.15 document attribute- identified (named) characteristic of a part of a props.

3.1.18 document design- affixing the necessary details and attributes established by the documentation rules.

3.1.19 signature- the requisite of the document, which is the handwritten signature of the authorized official.
Note. For electronic documents, an analogue of a handwritten signature is used - an electronic digital signature.

3.1.20 designation- the requisite of the document, which is its identification (distinctive) index.
Note. Each document is assigned a designation, which is recorded in established places (in the main inscriptions, on title pages, etc.).

and GOST 21.101-97.

Explanations of the most important changes in GOST R 21.1101-2013

(compared to GOST R 21.1101-2009)


Section 3 "Terms and definitions"

The terms “basic set of working drawings”, “plan”, “facade”, “equipment”, “building material” have been introduced.
Because some terms are included in the interstate standard GOST 21.501-2011, then in this national standard (GOST R) they are given as borrowed (within the framework, with references to GOST 21.501).
The section is supplemented with terms from GOST 2.102 (props, attribute, etc.), which are necessary to understand the rules for filling in title blocks, covers and title pages.

Subsection 4.1 "Design documentation"

Clause 4.1.1
Section 5 is usually the largest section. For large projects, as it turned out, the division of this section into "parts (they are subsections) - books" is often not enough. Therefore, for section 5, it is stipulated that the subsections of this section are divided into parts and books.
In accordance with this major change, the corresponding changes have been made to clauses 4.1.2 and 4.1.3.
It is determined that the words about "large volume" of documentation refer to paper documentation. Based on this volume, the section (or subsection) is divided into parts and books.
In addition, a new provision has appeared that a section and a subsection can be divided into parts and books not only depending on the amount of documentation, but also on other grounds (for example, when some part of the project documentation is completed by subcontractors).

Clause 4.1.3
This paragraph has been revised due to the fact that both sections and subsections are divided into parts and books. For section 5, one more degree of division appeared.
“The designation of a subsection, assembled in the form of a separate volume (see 4.1.1), is formed from the designation of the section to which the number of the subsection is added.
If a subsection is divided into parts, then the designation of the part is made up of the designation of the subsection, to which the part number is added through a dot. If the part is divided into books, then the designation of the book (if necessary) is made up of the designation of the part, to which the number of the book is added through a dot. "
Due to this, the examples have been changed.
At this point, the following paragraph appeared:
"Based on the provisions of 4.1.1 - 4.1.3, 4.2.3 - 4.2.7, standards of organizations can be developed for the designation of text and graphic documents that are part of the design and working documentation, taking into account the specifics of designation, depending on the volume of documentation, the conditions of document flow and used CAD and EDMS. "

Clause 4.1.4
Added to this clause the words “generally assembled in the following order”.
This means that a volume may not necessarily include all of the following documents.
For very large projects, numbering dozens or even hundreds of volumes, it is possible that the document "Composition of design documentation" is not included in each volume - it is completed as a separate volume.
Naturally, this assumption should be applied when the number of volumes is much larger (several times) than the number of sections of design documentation (now there are 14 of them).

Subsection 4.2 "Working documentation"

Clause 4.2.1. The first listing is abbreviated because everything is already written in the definition of the term "Basic set".

Clause 4.2.5
According to the new edition of the standard, it is allowed to design the main sets of working drawings as separate documents for any brand, and not just electrical brands.
Clauses 4.2.6 and 4.2.7
This paragraph lists only the most general accompanying documents that can be included in any brand.
By “others” we mean, for example, “list of pipelines” in GOST 21.401-88, “specification of rolled metal products” in accordance with GOST 21.502-2007.
The general principles of designation of the attached documents are given in more detail.
In the example for the specification of equipment, products and materials, the code "C" is given - according to the current GOST 21.110-95. In the draft of the new GOST 21.110, this code was changed to "SO".

Clause 4.2.8
Due to the uncertainty of the status of "typical building structures (" series ") (they have not been canceled, but currently there is no valid regulatory document establishing the procedure for the development and application of these drawings), a footnote is given to this paragraph:
"If necessary, drawings of standard structures, products and assemblies are recorded without changing the designation in the section" Attached documents "and transferred to the customer in accordance with 4.2.6".

Clause 4.2.9
"4.2.9 The form, rules of execution and designation of the document, which provides the composition of all working documentation, executed in accordance with the contract, are established in the standards of the organization."

Clause 4.3.5
Some requirements for general guidelines have been clarified, in particular for the list of normative documents.
Added a paragraph on the need for numbering of paragraphs of general instructions.

Subsection 5.1 "General Provisions"

This subsection is substantially supplemented, mainly, by references to ESKD standards for electronic documents and rules for their circulation, which, with certain assumptions, can be used for project documentation.
A clause has been introduced on the possibility of using line types that are absent in GOST 2.303:
“5.1.3 In graphic documents, images and symbols are performed with lines in accordance with GOST 2.303. It is allowed to use lines of other types, names, style, thickness and main purposes of which are set in the relevant SPDS standards. " (This refers to GOST 21.501-93 (clause 2.5.1), GOST 21.204-93, GOST 21.302. They have established line types that are absent in GOST 2.303).

The subsection is supplemented with requirements for the execution of drawings in color:
“5.1.4 In graphic documents, legend should be done in mostly black. Some symbols or their individual elements may be executed in other colors. Refer to the relevant SPDS standards for legend color guidance. If the colors of the symbols used in the drawings and diagrams are not established in the standards, their purpose is indicated on the drawings.
In originals intended for making black-and-white copies, color symbols and their elements should be used in black. "

It should be noted that GOST 21.302 has long established requirements for the colors of symbols. Therefore, this point is just a statement of fact.

Clause 5.1.6
The rules for scaling images in drawings have been clarified.
The second paragraph of this paragraph is supplemented by the following sentence:
"In these cases, the scales are indicated in parentheses immediately after the names of the images in accordance with GOST 2.316 (paragraph 4.19)."

Clause 5.1.10
"5.1.10 For consideration, agreement, examination and approval, submit copies of design and working documentation documents, completed as specified in 4.1 and 4.2."
This clause establishes (or rather reminds) what exactly is passed on to customers. The definition of the term "copy" is given in GOST R 21.1003.
Subsection 5.2 "Main inscriptions"
Clause 5.2.1
This paragraph provides an updated answer to a very long-standing and frequently asked question: "Is it possible to place the title block on the long side of A4 format?"
Now the answer is “you can”, but in certain cases:
"For text documents in tabular form, it is allowed, if necessary, to place the title block along the long side of the sheet."
Appendix I gives the corresponding figure I.2.
Clause 5.2.2
The concept of "title page" has been introduced for documents with title pages - this is the next after the title page of a text document, which is drawn up with a title block in form 5. This page can not be called the first one, because the first page of the document drawn up as the title page, according to clause 8.5, is the title page. Indeed, in this case, the number 2 is put in the “Sheet” column of the main inscription in form 5!
This term is not something new, it is used in the ESKD standards (GOST 2.104 and GOST 2.106) and was in SN 460-74 (part 1).
Accordingly, the name of Form 5 in Appendix G. has been corrected.

Clause 5.2.3
Added the word "text" to the first paragraph: "If some text documents ...".
A note to form 6 from Appendix G has been moved and supplemented to this paragraph:
“When the main set of working drawings is drawn up as separate documents, documents containing solid text and / or in the form of tables (for example, general data, cable log, etc.) are drawn up as text documents. In this case, the first sheet of the document is drawn up with the main inscription according to form 3, the subsequent ones - according to form 6 ".

New clause 5.2.9
“5.2.9 It is allowed to additionally identify project documents using a barcode.
In this case, the country code, the code of the developer organization, the document designation and the document format designation should be used as the barcode details. Additionally, other details can be used.
It is recommended to place the barcode in the lower right corner of the document format field above the title block. "
The barcode makes it possible to quickly search for documents using a hand-held scanner installed at the user's workplace. The barcode is also used for identification in streaming scanning.
The barcode is calculated automatically when filling in the details of the title block and is recorded in a special field.
The recommended location for the barcode is taken from the ESKD standard.
This provision is given in subsection 5.2, since the barcode contains for the most part the same data as the title block.
Subsection 5.2 "Coordination axes
Clause 5.3.1
In this new paragraph, the main purpose of the coordination axes is formulated:
- to determine the relative position of elements of a building or structure;
- to tie a building or structure to a construction geodetic grid or alignment base.

Clause 5.3.2
The possibility of designating coordination axes with letters of the Latin alphabet has been introduced.

Clause 5.3.3
The paragraph is given in a refined form: "The sequence of designations of the coordination axes is taken according to the plan as shown in Figure 1a: digital axes - from left to right, letter axes - from bottom to top, or as shown in Figures 1b and 1c".

Clause 5.3.7 is given in a new edition. Instead of an example with the designation of the coordination axes of the sections, a more understandable Figure 3b is shown, which was in the 1980 standard.

Clause 5.3.8
This paragraph contains the most general provisions related to the coordination axes in the 3D model.

Subsection 5.2 "Application of dimensions, slopes, marks and inscriptions"

Clause 5.4.3
The dimension line protrusion has been resized. It is proposed to change the minimum value to 0, i.e. "... in this case, the dimension lines continue beyond the extreme extension lines (or, respectively, beyond the contour or axial) by 0 3 mm."
Those. the serif can be the same as in the example from MS ISO 4066: 1994 (see on the right).

For example, in GOST 28984-2011 there are only such serifs. See also SP 63.13330.2012.

The last paragraph of this paragraph has been restored, which establishes the rules for applying dimensions with arrows in construction drawings.
There is also the following additional paragraph:
"When applying dimensions on axonometric diagrams of technological pipelines and engineering systems, it is allowed to limit dimension lines with arrows."
If you carefully read the first paragraph of clause 5.4.2, then its requirement cannot be met, for example, for an oblique isometric projection (at an angle of 45 °).

Clause 5.4.3
The word "relative" has been added to the last sentence, i.e. it turned out "relative marks above zero are indicated with a" + "sign, below zero - with a" - "sign."
In accordance with the current standards, absolute marks are indicated without a "+" sign - on the drawings of the general plan, roads and railways, irrigation and drainage and other structures.
A note is provided to clarify the concept of "ground zero" for buildings:
"As a rule, the level of the finished floor of the first floor is taken as the zero mark for buildings."

Clause 5.4.4
An additional figure 7b is shown, which explains the rule for applying slopes.

Clause 5.4.6
A new figure 8 is presented, which sets the order of the callouts for all cases, in particular, when the arrow is from below. In GOST 21.701 and GOST 21.702 (instead of GOST R 21.1701-97 and GOST R 21.1702-96) examples are corrected that do not correspond to this requirement.
Subsection 5.5 "Images (sections, sections, views, details)"
Clause 5.5.2
This paragraph contains a note explaining the features of the use of the term "section" in construction drawings - as opposed to design documentation.
All terms for images are given in GOST 2.305-2008, and in this standard only terms are given that define certain types of images, used only in construction documentation (plan, facade), and which are absent in GOST 2.305.

Clause 5.5.15
The new last paragraph is quoted:
"It is allowed to indicate its location in the name of the facade, for example," main "," yard ", etc."

Section 6 Rules for the implementation of specifications on drawings
Clause 6.1
Added the words "as well as other drawings", since specifications for forms 7 and 8 are used for product drawings (in accordance with GOST 21.501-2011) and for sketch drawings of non-standard products.

Clause 6.3
This paragraph contains the most general requirements (from GOST 2.316) for the implementation of specifications and tables in a 3D model of a building or structure.
What should be noted here.
From this clause, as well as clause 4.1 of GOST 2.316-2008, it follows that specifications and other tables in electronic models are allowed (in GOST 2.316 it is even recommended) to be performed in separate documents, and in clause 4.2.5 of this standard it is shown how this can be done in relation to working documentation.

Section 7 "Rules for Changes"
This section has been substantially revised. First, general provisions are given (7.1 - 7.3, and then subsections are given with the features of making changes to the design and working documentation.

Clause 7.1.1
This paragraph states that on the basis of the provisions of Section 7, standards of organizations can be developed, taking into account the peculiarities of making changes in these organizations.

Subsection 7.2 "Permission to Change"

Clause 7.2.4
Added new paragraph:
"Changes to the documents of the main set of working drawings, drawn up in separate documents (see 4.2.5), as well as to the documents of the volume of design documentation, are made on the basis of one general permission."

New clause 7.2.5
"7.2.5 When making changes to the DE, it is allowed not to issue a permit if the CAD and EDMS keep records and store versions of the document, and access control is provided, excluding the possibility of unauthorized changes."
A necessary clarification to this point. It is allowed not to issue a permit if the documents are signed by electronic signatures in the design organization - only this excludes the possibility of unauthorized changes to CAD and EDMS.

Subsection 7.3 "Changes"

This subsection provides general requirements for design and working documentation. (The numbering of the corresponding clauses in GOST R 21.1101-2009 is given in brackets)

Clause 7.3.5
You should pay attention to this point:
"7.3.5 Manuscript changes are made to paper originals of documents in accordance with 7.3.9 - 7.3.16."

Clause 7.3.11 (7.1.3.8)
The words about "canceled" sites have been removed here, since in relation to the images in the drawing, this word has not been used anywhere before and is not used further.
There is no need to specially mark this - even if it is crossed out: if it is not indicated where to look at the new image (as indicated in clause 7.3.14), then this means that the site has been deleted without replacement.
If the site is simply removed (which was allowed even if the changes were made manually - with a wash), then this number is simply nowhere to be given.

Clause 7.3.12 (7.1.3.9)
Added two new paragraphs:
“It is allowed not to draw a line from the parallelogram with the designation of the change to the changed area.
When making changes to text documents (in the text part of documents), the lines from the parallelogram with the designation of the change are not drawn. "

Clause 7.3.19 (7.1.3.20)
Here it is necessary to clarify the words about the additional table for making changes (see 5.2.6). This continuation of the table is only needed when making changes in a handwritten way.
Added paragraph:
"In the new (modified) version of the DE in the table of changes, only data on the last change are indicated."

Clause 7.3.21 (7.1.3.21)
Changed the rules for filling in the "Sheet" column in the table of changes
3) when replacing all sheets of the original when manually making changes on the first (title) sheet - "All" (while the table of changes on other sheets of this original is not filled in), in an automated way - "Deputy." on all sheets.
In the opinion of many, the number of the current version of the sheet (document) should be on all sheets of the document. By the way, this is exactly what is given in GOST 2.503-90.
Those. when replacing all sheets of a document in an automated way, the table of changes is filled in on all sheets: columns "Change", "Doc." and "Date" (these columns on text documents are usually filled in automatically on all sheets).
Column "Number of teachers." not filled in, because areas are not highlighted when the document is completely replaced.
About the column "Sign." see below.
(If text documents are performed without title blocks, then the version number of this document is given in the header and footer on all sheets).

List e) is given in the new edition:
"E) in the column" Sign. " - signature of the person responsible for the correctness of the amendment. When replacing all sheets of the original in an automated way, the signature is affixed only on the first (title) sheet. The signature of the supervisor is affixed in additional columns on the field for sheet filing (except for sheets issued instead of replaced and new ones); "
When replacing all sheets of the original with manual changes, the table of changes (hence, the column "Subn.") Is filled in only on the first (title) sheet.
If you do not bring this underlined provision, then it turns out that with the automated introduction of changes in the column "Sub." change tables need to be signed even where it is not envisaged to sign when manually making changes, for example, in the main inscriptions in form 6 on all subsequent sheets of a text document, and the number of sheets can reach several hundred!
It is simply absurd to force someone to sign in this column on all sheets of the replaced document, tk. when replacing sheets, all performers are re-signed in columns 12 of the main inscription (according to clause 7.3.23).

Clause 7.3.23 (new)
"7.3.23 When replacing sheets of documents drawn up with basic inscriptions in forms 3 - 5, the sheets issued instead of the replaced ones are signed in columns 10 - 13 of the main inscriptions in accordance with the procedure provided for the newly developed sheets."

Subsection 7.4 "Features of making changes to design documentation"

Clause 7.4.5
In this paragraph, as well as in Appendices M, H and P, the rules for applying the table of registration of changes in form 10 on the covers and title pages have been clarified.
Added new paragraph:
"The changes registration table does not take into account the corrections made to the list" Composition of design documentation "in connection with changes in other volumes of design documentation."

Clause 7.4.7
This is the new position:
"7.4.7 When completing additional volumes of design documentation, corrections are made to the list" Composition of design documentation ".
Information about changes in the list "Composition of design documentation" in the content of the volume is not given. "

Clause 7.4.8
Added underlined words:
"7.4.8 Changes to the approved design documentation related to changes in the parameters of the construction object affecting its structural reliability and safety, and the need to re-approve the design documentation, are made at the customer's decision on the basis of a new design assignment or additions to a previously approved design assignment.

Subsection 7.4 "Features of making changes to the working documentation"

Clause 7.5.3 (7.1.3.16)
The paragraph is supplemented with a paragraph:
"When making changes in a handwritten method, the numbers and names of the canceled sheets in the list of working drawings are crossed out, in an automated way - the column" Name "for the canceled sheets is not filled in."

Clause 7.5.4 (new)
"7.5.4 When making changes to the documents of the main set, drawn up in separate documents, make the appropriate corrections in the list of documents of the main set of working drawings."

Clause 7.5.5 (7.1.3.18)
Fixed bug. The point is given in the wording of GOST 21.101-97:
"7.5.5 When performing additional and cancellation of previously executed attached documents, make corrections in the" Attached documents "section of the list of reference and attached documents of the corresponding main set of working drawings."
This sheet is not intended to track changes in the documents recorded in it!
Otherwise, it turns out that a new version of the main set is being created, when we did not make any changes to it at all, and the changes were only in documents that were not included in the main set!
The versions of the accompanying documents are not linked to the versions of the core set.
The same is in clause 7.5.6 (7.1.3.19). The list of main sets does not reflect information about the versions of the main sets recorded in this list - information is provided only on the implementation of additional and cancellation of previously completed main sets of working drawings!

Clause 7.5.7 (7.1.3.22)
The paragraph is supplemented with underlined words:
"7.5.7 In the tables of changes on the general data sheets, the corrections made in the general data sheet in connection with the introduction of changes to the sheets of the main set and the attached documents are not taken into account as sections of changes in accordance with 7.3.11."

Section 8 "Rules for registration of bound documentation"

Clause 8.5
The provisions of this clause have become "recommended". At the same time, the standard now contains (in clause 8.6) how to fill in the content in the absence of additional continuous numbering of sheets.

Clause 8.6
This paragraph says:
"Graphic documents of design and reporting technical documentation based on the results of engineering surveys are written down sheet by sheet."

The rules for filling out the content are given:
“In the columns of content indicate:
- in the column "Designation" - designation of the document;
- in the column "Name" - the name of the document in full accordance with the name indicated in the title block or on the title page;
- in the "Note" column - information about the changes made to the recorded documents, as well as the number of the volume sheet according to the sequential numbering of the volume sheets in accordance with 8.5, from which the document begins.
If sequential numbering is not performed, then the total number of sheets of each document is given in the "Note" column. At the end of the content, the total number of sheets included in the volume (album, folder) is given. "

It should also be noted here that in Appendix B it is now written that in Form 2 “It is allowed, if necessary, to include additional columns (columns) in the statement, for example,“ No. sheets ", etc.".

Clause 8.7. With the introduction of the last paragraph of this paragraph, questions and disputes about the need for seals on title pages should stop. For some reason, this was necessary for the survey documentation and was not needed (more precisely, it was not established) for the design and work documentation.

Section 9 of GOST R 21.1101-2009 is not included in the draft of the new standard. It is proposed to develop a separate national standard or set of rules. This section was not a requirement for design documentation - it contained provisions (rules) for the reuse of already developed documentation.
It was impossible to leave it as it was, since it doesn't match anything.
In addition, there is a bill on the re-use of foreign design documentation, which should also be taken into account in the new document on re-use documentation.

Appendix A

A note has been added about the possibility of denoting section ciphers with letters of the Latin alphabet.
Section numbers 101 and 111 are given for the draft amendment to Government Decree No. 87.
Recommendations are given on the acceptable spelling of these strange section numbers:
"It is allowed to give section numbers 101 and 111 in the form of 10 (1), 11 (1) or 10-1, 11-1".
Those. any option is possible, but there should not be an option with a dot, because according to clause 4.1.3, it turns out that this will be the designation of part 1 of section 10 or 11, and not the number of an independent section.

Appendix B
The marks of the working documentation are given (tried to give) in the sequence corresponding to the sections and subsections of the project documentation.
A note has been added about the possibility of marking the stamps of the main sets with the letters of the Latin alphabet.
The designation of the brands of the main sets in the Latin alphabet is possible in two ways:
1) when stamps use letters that coincide in the Russian and Latin alphabets (for example, AR, VK, NVK, TS, etc.), then transliteration of the Russian designation is not performed. New stamps in Latin letters are assigned only in cases where the stamp includes Russian letters that are absent in the Latin alphabet (B, D, D, F, Z, P, E, etc.);
2) when all brands are designated in Latin letters without taking into account the coincidences of letters, but, for example, based on the English translation of the brand name.
All this is allowed to be established at the discretion of the design organization in the standards of the organizations.

Appendix D

In the instructions for filling out the general data sheets, provisions are given that allow the resizing of the columns of the forms of these sheets, as well as the possibility of bringing additional columns (columns).
The explanation for filling out the list of documents of the main set (clause D.5) contains the following:
"For graphic documents consisting of several sheets, the names of the images placed on each sheet are also given, in accordance with the names given in the title block of the sheet."
This means that on the first sheet of the document of the main set, it is not necessary to provide a list of working drawings of the document, as it was provided for in GOST 21.607-82. Not all documents in the main set are graphical. For text documents, it is enough to give the number of sheets of this document in the "Note" column.

Appendix E

Two new abbreviations have been introduced:
Canceled - Annul.
Ground (ground) water level - GWL.

There was a proposal to shorten “canceled” to “Ann.”, But this does not correspond to clause 6.5 of GOST R 7.0.12-2011 “System of standards for information, library and publishing. Bibliographic record. Reduction of words and phrases in Russian. General requirements and rules ".
Accepted abbreviation, similar to the abbreviation of the word "annotation" - "annot."
Abbreviations changed:
Coefficient "- coefficient; (6.5 If the cut-off part of the word is preceded by a doubled consonant, one of the consonants should be retained during the reduction).
Efficiency - efficiency.
Clean floor level - UCHP.
The following note is provided:
"Abbreviations of words indicated in this table and GOST 2.316 may be used in text documents containing text broken down into columns."

Appendix G

It should be noted that the number of lines in the columns "agreed" on the left margin of the sheet has been reduced to three, since it has been reported that the word "agreed" does not print on some types of printers. It should be noted that the same was done in a similar Ukrainian standard in 2009.
Underlined words have been added to the instructions for completing column 2:
"- in column 2 - the name of the enterprise and, if necessary, its part (complex).". Further - in the text.
The instructions for filling out column 4 were supplemented by three provisions, which are practically all followed, but were not described in the standard:
“If there is one image on a sheet, it is allowed to give its name only in column 4.
On the sheet (sheets) of general data on working drawings, "General data" is written in the column.
In the case provided for in 5.2.3, in column 4, give the name of the document or non-standard product. "
The instructions for completing column 10 have been substantially revised. In the last paragraph, the order of the "most significant sheets" has been changed, since For some reason, it was concluded from the previous edition that GUIs sign all sheets of the graphic part of the design and documentation:
“The bottom line contains the position of the person who approved the document, for example, the chief engineer (architect) of the project, the head of the department or another official responsible for this document (sheet).
Signatures of the person responsible for the preparation of design or working documentation (chief engineer (architect) of the project) are mandatory on the general data sheets for working drawings, the most significant sheets of the graphic part of the project documentation and working drawings. "
In the note to the explanations for filling in the main inscriptions, "for example, 06/02/12" was added. This should clarify what a "calendar date" is and the format for filling in the "Date" column.
It is possible to execute ("if necessary") in the title block of additional column 27 (above column 1) to give the name of the customer organization. Now, in many cases, column 2 is used for this.
This column is by no means obligatory - it is entered "if necessary", which is set for itself by the design organization.
A similar column is provided in the design GOST 2.104-2006 - and also "if necessary".

Appendix I

Figure I.2 has been added, which shows the permissible variant of the location of the main inscription for the A.4 format (see 5.2.1). Please note that the filing margin still remains on the long side of the sheet.

Appendix K

The instructions for filling in the "Name" column have been substantially supplemented.

Appendix L

Forms 9 and 9a have been slightly changed - the size and location of columns 2 and 3 have changed. They have become more convenient to fill out.

Appendices N and P

The new edition of the standard provides separate forms for the cover and title page.
The forms of the title page and cover were supplemented with fields for recording data on the SRO certificate and, if necessary, the name of the ordering organization.
(By "customer" here we mean not necessarily a "technical customer" (according to the GRK), but also a general designer) - for a subcontractor.
In the instructions for filling out the title page and cover, the enumeration related to filling in the “Volume number” field has been corrected. It is now shown as follows:
"- the number of the volume according to the list" Composition of design documentation "or" Composition of reporting documentation based on the results of engineering surveys "(if any)".
Instructions for completing the cover and title page are supplemented with the following explanation: