Order 620 dated 12/29/09

MINISTRY OF REGIONAL DEVELOPMENT
RUSSIAN FEDERATION

ORDER

On approval of the Guidelines for the use of reference books base prices for design work in construction

In accordance with the Regulations on the Ministry regional development Russian Federation, approved by Decree of the Government of the Russian Federation of January 26, 2005 No. 40 (Collected Legislation of the Russian Federation, 2005, No. 5, Art. 390; No. 13, Art. 1169; 2006, No. 6, Art. 712; No. 18, Art. 2002; 2007, No. 45, item 5488; 2008, No. 22, item 2582, No. 42, item 4825, No. 46, item 5337; 2009, No. 3, item 378, No. 6, item 738; No. 14, item 1669; No. 38, item 4497), by order of the Ministry of Regional Development of the Russian Federation of April 11, 2008 No. 44 "On approval of the Procedure for the development and approval of standards in the field of estimated regulation and pricing in the field of urban planning" (registered Ministry of Justice of the Russian Federation on May 12, 2008, registration No. 11661, Bulletin of Normative Acts of Federal Executive Authorities, 2008, No. 22) and Order of the Ministry of Regional Development of the Russian Federation of August 20, 2009 No. 353 “On Approval of Qualifications estimated standards to be used in determining estimated cost objects capital construction the construction of which is financed with the involvement of federal budget funds” (registered by the Ministry of Justice of the Russian Federation on October 2, 2009, registration No. 14940, Bulletin of Normative Acts of Federal Executive Authorities, 2009, No. 42) order:

1. Approve the attached Guidelines on the use of reference books of basic prices for design work in construction.

2. To the Department for Regulation of Urban Development (I.V. Ponomarev), within 10 days from the date of signing, send this Order to state registration to the Ministry of Justice of the Russian Federation.

3. To impose control over the execution of this order on the Deputy Minister of Regional Development of the Russian Federation S.I. Kruglik.

And about. Minister V.A. Tokarev

METHODOLOGICAL INSTRUCTIONS

ON THE APPLICATION OF DIRECTORIES OF BASIC PRICES FOR DESIGN WORKS IN CONSTRUCTION

I. GENERAL PROVISIONS

1.1. Guidelines for the use of reference books of basic prices for design work in construction (hereinafter referred to as the Guidelines) are intended to determine the cost of developing a design and working documentation for the construction of new buildings and structures, their reconstruction, expansion and technical re-equipment (hereinafter referred to as the construction of facilities), determined using Reference books of basic prices for design work in construction.

1.2. The provisions given in the Guidelines apply to all Reference books of basic prices for design work in construction (hereinafter referred to as the Reference books) entered in the federal register of estimated standards to be used when determining the estimated cost of capital construction objects as state estimated standards.

1.3. When using the Handbooks, the following should be taken into account:

1.3.1. The base prices of the Reference books are set depending on the natural indicators of design objects (capacity, length, capacity, area, etc.) or on total cost construction.

1.3.2. The prices given in the Handbooks are set in accordance with the composition and requirements for the content of sections of project documentation for the construction of enterprises, buildings, structures, provided for by Decree of the Government of the Russian Federation dated February 16, 2008 No. 87 “On the composition of sections of project documentation and requirements for their content ”(Collected Legislation of the Russian Federation, 2008, No. 8, Art. 744).

1.3.3. The directories show prices for individual design objects of capital construction of buildings and structures using for individual elements building structures drawings of typical (reusable) products and assemblies.

1.3.4. The prices in the Handbooks take into account the costs of developing design and working documentation, attributable without value added tax.

1.3.5. The prices of the Handbooks include the following works and services:

1.3.5.1. Production of demonstration materials (except for demonstration layouts).

1.3.5.2. Participation of the design organization together with the customer in the coordination of the finished project documentation with government bodies and local governments.

1.3.5.3. Protection of project documentation in expert and approving instances.

1.3.6. The prices of the Handbooks for the development of design and working documentation do not include the costs of:

1.3.6.1. Development of the design solutions specified in the design assignment in several versions, with the exception of variant studies to select the optimal design solutions.

1.3.6.2. Development of solutions for the monumental and decorative design of enterprises, buildings and structures.

1.3.6.3. Making changes to the design and working documentation (with the exception of correcting errors made by the design organization).

1.3.6.4. Development of detailed drawings metal structures(KMD) and technological pipelines factory made.

1.3.6.5. Carrying out surveys and measuring work at facilities subject to reconstruction, expansion and technical re-equipment.

1.3.6.6. Development design documentation for custom-made equipment, except for the preparation of initial requirements for the design of this equipment.

1.3.6.7. Business trips. The base prices of the Handbooks do not take into account the costs of business trips, including the costs of administrative personnel, if the business trips of this personnel are directly related to the design of the facility.

1.3.6.8. Development of projects for the production of works (R&D).

1.3.6.9. Development of working documentation for the construction of temporary buildings and structures for the needs of construction organizations.

1.3.6.11. Research and experimental work.

1.3.6.12. Development automated systems enterprise management (APCS) and automated process control systems (APCS).

1.3.6.13. Development of the section "Measures for civil defense and measures to prevent natural and man-made emergencies." The base price for the development of the specified section is determined by the relevant Directory.

1.3.6.14. Performing work on assessing the impact of a capital construction facility on environment(EIA).

1.4. The distribution of the base price for the development of design and working documentation is carried out, as a rule, in accordance with the indicators given in Table 1, and can be specified by agreement between the contractor and the customer.

Table 1

Types of documentation

Percentage of base price

Project documentation

working documentation

TOTAL

1.5. If the design assignment provides for the simultaneous development of design documentation and partial development of working documentation, then the total percentage of the base price is determined by agreement between the construction customer and the design organization, depending on the architectural, functional, technological, structural and engineering solutions contained in the design documentation , as well as their level of detail.

1.6. When performing design work, in abbreviated form against those provided for by the current normative documents composition of sections and volumes of work, their price, regardless of the methods of its calculation, is determined by the prices for the development of design and working documentation using a reduction factor, the size of which is set by the contractor in agreement with the customer, in accordance with the complexity of the work and the relative cost of developing sections of the design and working documentation.

1.7. When determining the initial (maximum) price of the contract for the performance of design work to their value determined at the time of the competition (auction), it is recommended to use the deflator index established by the Ministry of Economic Development of Russia in accordance with paragraph 5 of the Rules for the development of a forecast for the socio-economic development of the Russian Federation, approved by Decree of the Government of the Russian Federation of July 22, 2009 No. 596 (Collection of Legislation of the Russian Federation of July 27, 2009, No. 30, Article 3833), effective in the middle normative term design.

1.8. When applying the Handbooks, it should be taken into account that the Handbooks present the recommended relative costs for the development of sections of design and working documentation (as a percentage of the base price), which can be specified for subdivisions (departments) of the design organization, when designing a specific object, within a certain total design cost , depending on the complexity of the work performed.

II. PROCEDURE FOR APPLICATION OF DIRECTORIES WHEN DETERMINING BASE PRICES FOR PROJECT WORKS

2.1. The procedure for determining the base price depending on the natural indicators of design objects.

2.1.1. The base price for the development of design and working documentation is determined by the formula:

FROM = (a + in x ) × K i ,

where

" but " And " in " - constant values ​​for a certain interval of the main indicator of the designed object, in thousand rubles;

X - the main indicator of the designed object;

K i - coefficient reflecting inflationary processes in the design at the time of determining the price of design work for the construction of the facility.

2.1.2. When applying the Handbooks, it should be taken into account that the prices of the Handbooks for the development of design and working documentation for enterprises, workshops, buildings and structures take into account the cost of designing all on-site engineering networks, communications, structures and devices (electricity supply, water supply, sewerage, heat supply, etc.), including connection workshops, buildings and structures for them, as well as planning organization schemes land plot (master plan and landscaping) within the construction site.

If the price in the Directory is set for the development of design and working documentation for the main production (excluding auxiliary, as well as site engineering networks and structures), the total design cost is determined by a set of cost indicators for the design of the main and auxiliary facilities.

The cost of designing capital construction projects does not take into account the cost of designing engineering networks and communications outside the construction site.

2.1.3. If the projected object has a value of the main indicator less than the minimum or more than the maximum indicators given in the price tables of the Handbooks, the price for the development of design and working documentation is determined by extrapolation in accordance with the formula given in the appendices and to these Guidelines. This provision also applies to positions where in the price table before the minimum and after the maximum are the words “before” and “above”, respectively. In cases where the accepted indicator is less than half of the minimum or more than twice the maximum indicator given in the table, the base price of design work is determined in the manner prescribed by paragraph 2.1.4 of these Guidelines.

2.1.4. The price for the development of design and working documentation for the construction of facilities for which prices are not given in the Handbooks and cannot be accepted by analogy is determined by the calculation of the cost in accordance with the cost calculation (Form 3P).

2.2. The procedure for determining the base price of the total cost of construction.

2.2.1. The base price for the development of design and working documentation is determined from the total cost of construction of the entire complex of buildings (structures) or an object, determined according to the consolidated budget calculation the cost of construction, depending on the categories of complexity of design objects.

2.2.2. The cost of construction can be determined:

With the use of analogue objects, taking into account their comparability;

According to the aggregated indicators of the estimated cost per 1 sq.m total area, 1 cubic meter of building volume, 1 m (km) of track, 1 ha of building, per unit of power, productivity, etc.

By type or complex of works.

2.2.3. The price for the development of design and working documentation is determined according to the tables of the Handbooks corresponding to the functional purpose of capital construction projects.

2.2.4. The base price of project documentation is determined by the formula:

where FROM- base price of design and working documentation in current prices;

FROM 01 - base price of design and working documentation as of 01.01.2001;

FROM c tr .01 - construction cost as of 01.01.2001;

a - percentage of the base price of the total cost of construction in 2001 prices. (Directory table);

K i - coefficient reflecting inflationary processes in the design at the time of determining the price of design work.

To recalculate the cost of construction of objects from the price level as of 01/01/2000 to the price level as of 01/01/2001, a coefficient equal to 1.25 is taken.

2.2.5. When the projected object has a construction cost value that is between the indicators given in the table, the base price for the development of project documentation is determined by interpolation. If the cost of building an object is less or more than the extreme cost indicators given in the price table, the base price of design work is accepted in the amounts established for the extreme indicators without extrapolation towards decrease or increase.

2.2.6. In the event that the volume of construction and installation work on the construction site is less than 60% of the total cost of construction, the following coefficients are applied to the prices for design work:

up to 50% - 0.95;

up to 40% - 0.9;

up to 30% - 0.8;

up to 20% - 0.7.

2.2.7. If the contract for the performance of design work provides for the possibility of clarifying the cost of design, then such clarification is recommended to be carried out based on the cost of construction determined as a result of the design.

2.2.8. When determining the base price, coefficients that take into account complicating factors (paragraphs , and of these Guidelines) are not applied.

III. PROCEDURE FOR DETERMINING THE COST OF DESIGN WORKS, TAKING INTO ACCOUNT ADDITIONAL FACTORS AFFECTING THE LABOR OUTPUT OF DESIGN

3.1. The price for the development of design and working documentation using the mock-up design method is determined at the prices of the Handbooks using multiplying factors. If there are no established multiplying factors in the Handbooks, the price for the development of project documentation by the specified method is determined by applying the coefficients to the base price: project documentation - 1.05; working documentation - 1.1.

3.2. The price of binding a standard or reusable project documentation, without making changes to above-ground part buildings, is determined by the prices of the Directories using coefficients from 0.2 to 0.35. Wherein minimum size coefficient is taken when linking the object without making any changes to the aboveground and underground parts of the building. The price for binding standard or reusable project documentation with changes to it in the underground and aboveground parts is determined at the prices of the Reference Books using a general coefficient of up to 0.8, depending on the complexity of the work. The approximate scope of work on the development of individual elements of buildings and structures as a percentage of the design cost is given in the appendix to these Guidelines.

3.3. The price for the development of design and working documentation for the construction of unique objects is determined at the prices of the Directories using a multiplying factor of up to 1.5, with the exception of the Directories, which establish a special procedure for calculating the price of these objects.

3.4. The price for the development of design and working documentation for the reconstruction of existing enterprises, workshops, buildings and structures is determined at the prices of Reference books of basic prices for design work for construction.

At the same time, when determining the cost of design work based on the value of the main natural indicator projected object, which should be achieved as a result of its reconstruction, technical re-equipment - using a coefficient of up to 1.5 to the prices of the Reference books. When determining the cost of design work from the cost of reconstruction - up to 1.3.

For especially dangerous, technically complex and unique capital construction projects - up to 2.0 and 1.7, respectively.

The size of the coefficient is set by the design organization in agreement with the customer.

3.5. The price for the development of design (working) documentation for the overhaul of facilities is determined according to the relevant reference books of basic prices.

3.6. When compiling local estimates using the resource method, in the absence of a centralized data bank on the current cost of resources in the construction region, a multiplying factor of 1.1 is applied to the cost of developing estimate documentation.

3.7. The price for the development of design and working documentation for the construction of enterprises, buildings and structures in difficult conditions is determined at the prices of the Handbooks, applied to the cost of design work, for the development of which the relevant regulatory documents establish special requirements, the following coefficients:

Complicating factors
design

Odds

Permafrost, subsidence, swelling soils; karst and landslide phenomena; location of the construction site above mine workings, in flooded areas

1,15

and etc.

Seismicity 7 points

1,15

Seismicity 8 points

1,20

Seismicity 9 points

1,30

If there are two or more complicating factors, coefficients are applied for each factor.

3.8. The price of designing enterprises, buildings and structures with the installation of imported basic technological equipment used by the design organization for the first time is determined by the prices of the Reference Books; at the same time, a coefficient of up to 1.3 is applied to the cost of types of design work, the development of which is complicated due to the use of the specified equipment, as agreed with the customer.

3.9. The costs of design organizations related to their performance of the functions of the general designer and supervision of design work transferred to subcontracting are determined in the amount of up to 2% of the development pricedesign and working documentation transferred to subcontractor design organizations and are paid additionally.

3.10. The prices of the Handbooks take into account the cost of 4 copies of design and working documentation transferred to the customer. The cost of copies of design products issued at the request of the customer in excess of the specified quantity is determined in addition to the base price.

3.11. When determining the base price of design according to the Reference books of basic prices for design work for construction, in the event of a reduction, at the request of the customer, established in the design assignment, design time compared to the standard ones, it is recommended to apply the following multiplying factors:

with a reduction in terms of 1.2 times - up to 1.1;

1.4 times - up to 1.2;

2 or more times - up to 1.4.

3.12. Price application guidelines and correction factors given in one Handbook are not allowed to be used when determining the cost of design work according to other Handbooks.

3.13. The price for the development of design and working documentation for the construction of facilities abroad is determined taking into account complicating factors:


p/p

Complicating factors

Ratios to development cost

Project documentation

working documentation

Translation of text materials of technical documentation, inscriptions on drawings into foreign language

1,05

Translation of materials of a foreign customer into Russian

1,03

1,03

Double check of calculations, drawings and specifications, estimates of volumes of works, budget documentation and other project materials, making duplicates of cripples, increased requirements for the design and packaging of project documentation

Other factors affecting the increase in the complexity of design work:

Current frequency and voltage, the difference in the permissible fluctuations in current frequency, different from the Russian Federation (to the cost of designing electrical equipment, power supply, low currents, and, if necessary, other sections)

1,05

Dry or humid tropical climate

1,15

When the design organization uses for the first time equipment and materials purchased in the customer's countries or supplied from other countries (according to clause 3.8 of these Guidelines)

Application of foreign norms and standards for materials and equipment, performance of structural calculations on them, etc., specified by the customer in the design assignment

1,15

Additional requirements for design and working documentation for the construction of facilities on a contract basis, including the preparation of specifications for equipment and materials for temporary import

Note - Increasing coefficients are applied to the cost of sections of project documentation or parts thereof, the development of which becomes more complicated.

3.14. When determining the cost of design work at the prices of the Reference Books, in the presence of several complicating factors and, in connection with this, several coefficients greater than one are used, the total multiplying coefficient is determined by summing their fractional parts and one. When determining the cost of design work using several coefficients less than one, the total reduction coefficient is determined by multiplying them.

When determining the cost of design work at the prices of the Reference Books, the pricing coefficients are multiplied. The pricing factors include the distribution coefficients of the base price for the development of design and working documentation, types of capital construction objects, reconstruction, as well as the coefficients established in the Reference books of basic prices for design work for construction.

3.15. The costs of design organizations located in areas where, in accordance with current legislation payments are made due to the regional regulation of wages, incl. payments to regional coefficients, as well as bonuses to wages behind continuous experience work and other benefits provided for by law in the regions of the Far North and areas equivalent to them are additionally determined by introducing multiplying coefficients to the base price total,established on the basis of the relevant justifying calculations performed by the design organization itself.

Application No. 1

EXTRAPOLATION AND INTERPOLATION IN CALCULATION OF THE PRICE OF DESIGN WORKS

In the case when the projected object has a value of the main indicator less than the minimum or more than the maximum indicator given in the table of the Base Price Directory, the base price of the design is determined by extrapolation; at the same time, the value of the correction to the price is reduced by 40%, i.e. when calculating the indicator of the designed object x ass accepted with a coefficient of 0.6.

If the power indicator of the object is less than the tabular indicator, the base price of its design is determined by the formula:

C = but + in ´ (0,4 ´ X min + 0,6 ´ x ass),

where

but , in - constant values ​​taken according to the table minimum value indicator;

X min -

x ass - indicator of the designed object.

If the power indicator of the object is greater than the tabular indicator, the base price of its design is determined by the formula:

C = but + in ´ (0,4 ´ X max + 0,6 ´ x ass),

where

but , in - constant values ​​taken according to the table of the maximum value of the indicator;

X max - the maximum figure given in the table;

x ass - indicator of the designed object.

In the case when the table shows only the value "but ", and the projected object has an indicator value that does not match those given in the table, the base price of its design is determined by interpolation or extrapolation; when extrapolating downward or upward, the price adjustment value is reduced by 40% (when calculating the adjustment amount, a reduction factor is introducedK = 0,6).

Application No. 2

EXAMPLES OF DETERMINING THE BASIC PRICE FOR DESIGNING OBJECTS WHERE THE INDICATORS ARE HIGHER, LOWER OR ARE BETWEEN THE INDICATORS GIVEN IN THE DIRECTORY TABLES *)

Example 1. In the case when the values ​​"a" and "c" are given in the table of the Base Price Reference.

p/p

Constant values ​​of the base price for the development of design and working documentation, thousand rubles.

but

in

Sludge incineration facilities Wastewater productivity, thousand m 3 / year:

from 25 to 60

1 thousand m 3 / year

66,5

1.1. It is required to determine the base price for the design of sewage sludge incineration facilities with a capacity of 15 thousand m 3 /year. The base price is determined by the formula:

FROM = but + in ´ (0,4 ´ X min + 0,6 ´ x ass),

where

but And in - constant values ​​taken according to the table of the minimum value of the indicator;

X min - the minimum figure given in the table;

x ass - given indicator of the designed object.

Calculation example:

66,5 + 1,2 ´ (0,4 ´ 25 + 0,6 ´ 15) = 89.3 thousand rubles.

*) The indicators of the tables are accepted conditionally

1.2. It is required to determine the base price for the design of sewage sludge incineration facilities with a capacity of 80 thousand m 3 /year. The base price is determined by the formula:

FROM = but + in ´ (0,4 ´ X max + 0,6 ´ x ass),

where

but And in - constant values ​​taken according to the table of the maximum value of the indicator;

X max - maximum rate given in the table;

x ass - a given indicator of the designed object.

Calculation example:

66,5 + 1,2 ´ (0,4 ´ 60 + 0,6 ´ 80) = 152.9 thousand rubles.

Example 2. In the case when only the value "a" is given in the table of the Base Price Reference.

In the Reference book of basic prices for design work, a table is given:

p/p

Name of the design object

Unit of measurement of the main indicator of the object

Constant values ​​of the base price for the development of design and working documentation, thousand rubles.

but

in

Rinsing water treatment facilities, capacity, m 3 /day.

1 m 3 / day

- « -

……………….

……….

……….

……………….

……….

……….

40000

- « -

219,4

80000

- « -

369,1

2.1. It is required to determine the base price for the design of a wash water treatment plant with a capacity of 100 m 3 /day.

Calculation example:

2.2. It is required to determine the base price for designing a wash water treatment plant with a capacity of 300 m 3 /day.

Calculation example:

2.3. It is required to determine the base price for designing a wash water treatment plant with a capacity of 90,000 m 3 /day.

Foundations, other than pile foundations, with resizing

Foundations, except for pile foundations, with a change in type

Pile foundations

II. Aboveground part

Facades without processing of the heating project

12,5

Walls with a change in material or thickness or design

Floors with a change in the design, type or layout of panels

Redevelopment of premises

Floors with redesign

Interior decoration

Registered with the Ministry of Justice of the Russian Federation
Registration number 16686

On approval of the Guidelines for the use of reference books of basic prices for design work in construction

In accordance with the Regulations on the Ministry of Regional Development of the Russian Federation, approved by Decree of the Government of the Russian Federation dated January 26, 2005 No. 40 (Collected Legislation of the Russian Federation, 2005, No. 5, Art. 390; No. 13, Art. 1169; 2006, No. 6 2007, No. 45, Art. 5488; 2008, No. 22, Art. 2582, No. 42, Art. 4825, No. 4b! Art. 5337; 2009, No. 3, Art. 378, No. 6, item 738; No. 14, item 1669; No. 38, item 4497)! by order of the Ministry of Regional Development of the Russian Federation of April 11, 2008 No. 44 "On approval of the Procedure for the development and approval of standards in the field of estimated regulation and pricing in the field of urban planning" (registered by the Ministry of Justice of the Russian Federation on May 12, 2008, registration No. 11661, Bulletin of regulatory acts federal executive bodies, 2008, No. 22) and the order of the Ministry of Regional Development of the Russian Federation dated August 20, 2009 No. 353 “On approval of the qualification of estimated standards to be applied when determining the estimated cost of capital construction projects, the construction of which is financed with the attraction of funds federal budget» (registered by the Ministry of Justice of the Russian Federation on October 2, 2009, registration No. 14940, Bulletin of Normative Acts of Federal Executive Authorities, 2009, No. 42) I order:

1. Approve as a state estimate standard the attached Guidelines for the use of reference books of basic prices for design work in construction.

2. The Department for Regulation of Urban Development (I.V. Ponomarev), within 10 days from the date of signing, send this Order for state registration to the Ministry of Justice of the Russian Federation.

3. To impose control over the execution of this order on the Deputy Minister of Regional Development of the Russian Federation S.I. Kruglik.

And about. Minister
V.A. Tokarev

Approved by order of the Ministry of Regional
development of the Russian Federation

METHODOLOGICAL INSTRUCTIONS FOR THE APPLICATION OF DIRECTORIES OF BASIC PRICES FOR DESIGN WORKS IN CONSTRUCTION
I. GENERAL PROVISIONS

1.1. Guidelines for the use of reference books of basic prices for design work in construction (hereinafter referred to as the Guidelines) are intended to determine the cost of developing design and working documentation for the construction of new buildings and structures, their reconstruction, expansion and technical re-equipment (hereinafter referred to as the construction of facilities), determined from application of reference books of basic prices for design work in construction.

1.2. The provisions given in the Guidelines apply to all Reference books of basic prices for design work in construction (hereinafter referred to as the Reference Books) entered in the federal register of estimated standards to be used when determining the estimated cost of capital construction projects as state estimated standards.

1.3. When using the Handbooks, the following should be taken into account:

1.3.1. The base prices of the Reference books are set depending on the natural indicators of the design objects (capacity, length, capacity, area, etc.) or on the total cost of construction.

1.3.2. The prices given in the Handbooks are set in accordance with the composition and requirements for the content of sections of project documentation for the construction of enterprises, buildings, structures, provided for by Decree of the Government of the Russian Federation dated February 16, 2008 No. 87 “On the composition of sections of project documentation and requirements for their content ”(Collected Legislation of the Russian Federation, 2008, No. 8, Art. 744).

1.3.3. The Handbooks provide prices for individual design of capital construction objects of buildings and structures using drawings of standard (reusable) products and assemblies for individual elements of building structures.

1.3.4. The prices in the Handbooks take into account the costs of developing design and working documentation, attributable without value added tax.

1.3.5. The prices of the Handbooks include the following works and services:

1.3.5.1. Production of demonstration materials (except for demonstration layouts).

1.3.5.2. Participation of the design organization together with the customer in coordinating the finished project documentation with state bodies and local governments.

1.3.5.3. Protection of project documentation in expert and approving instances.

1.3.6. The prices of the Handbooks for the development of design and working documentation do not include the costs of:

1.3.6.1. Development of the design solutions specified in the design assignment in several versions, with the exception of variant studies to select the optimal design solutions.

1.3.6.2. Development of solutions for the monumental and decorative design of enterprises, buildings and structures.

1.3.6.3. Making changes to the design and working documentation (with the exception of correcting errors made by the design organization).

1.3.6.4. Development of detailed drawings of metal structures (KMD) and industrial pipelines of factory production.

1.3.6.5. Carrying out surveys and measuring work at facilities subject to reconstruction, expansion and technical re-equipment.

1.3.6.6. Development of design documentation for custom-made equipment, in addition to the preparation of initial requirements for the design of this equipment.

1.3.6.7. Business trips. The base prices of the Guides do not take into account the costs of business trips, including the costs of administrative personnel, if the business trips of this personnel are directly related to the design of the facility.

1.3.6.8. Development of projects for the production of works (R&D).

1.3.6.9. Development of working documentation for the construction of temporary buildings and structures for the needs of construction organizations.

1.3.6.11. Research and experimental work.

1.3.6.12. Development of automated enterprise management systems (APCS) and automated process control systems (APCS).

1.3.6.13. Development of the section "Measures for civil defense and measures to prevent natural and man-made emergencies." The base price for the development of the specified section is determined by the relevant Directory.

1.3.6.14. Performance of work on the assessment of the impact of the capital construction object on the environment (EIA).

1.4. The distribution of the base price for the development of design and working documentation is carried out, as a rule, in accordance with the indicators given in Table 1, and can be specified by agreement between the contractor and the customer.

Table 1

Types of documentation Percentage of base price
Project documentation Working documentation 40 60
TOTAL 100

1.5. If the design assignment provides for the simultaneous development of design documentation and partial development of working documentation, then the total percentage of the base price is determined by agreement between the construction customer and the design organization, depending on the architectural, functional, technological, structural and engineering solutions contained in the design documentation , as well as their level of detail.

1.6. When performing design work, in a reduced composition of sections and volumes of work as provided for by the current regulatory documents, their price, regardless of the methods of its calculation, is determined by the prices for the development of design and working documentation using a reduction factor, the amount of which is set by the contractor in agreement with the customer, in accordance with the complexity of the work and the relative cost of developing sections of the design and working documentation.

1.7. When determining the initial (maximum) price of the contract for the performance of design work to their value determined at the time of the competition (auction), it is recommended to use the deflator index established by the Ministry of Economic Development of Russia in accordance with paragraph 5 of the Rules for the development of a forecast for the socio-economic development of the Russian Federation, approved by Decree of the Government of the Russian Federation of July 22, 2009 No. 596 (Collection of Legislation of the Russian Federation of July 27, 2009, No. 30, Article 3833), effective in the middle of the standard design period.

1.8. When applying the Handbooks, it should be taken into account that the Handbooks present the recommended relative costs for the development of sections of design and working documentation (as a percentage of the base price), which can be specified for subdivisions (departments) of the design organization, when designing a specific object, within a certain total design cost , depending on the complexity of the work performed.

II. PROCEDURE FOR APPLICATION OF DIRECTORIES WHEN DETERMINING BASE PRICES FOR PROJECT WORKS

2.1. The procedure for determining the base price depending on the natural indicators of design objects.

2.1.1. The base price for the development of design and working documentation is determined by the formula:

C \u003d (a + in) * K 1,

where
"a" and "in" - constant values ​​for a certain interval of the main indicator of the designed object, in thousand rubles;
X- the main indicator of the designed object;
K i - coefficient reflecting inflationary processes in the design at the time of determining the price of design work for the construction of the facility.

2.1.2. When applying the Handbooks, it should be taken into account that the prices of the Handbooks for the development of design and working documentation for enterprises, workshops, buildings and structures take into account the cost of designing all on-site engineering networks, communications, structures and devices (electricity supply, water supply, sewerage, heat supply, etc.), including connection workshops, buildings and structures for them, as well as a scheme for the planning organization of a land plot (master plan and landscaping) within the construction site.

If the price in the Directory is set for the development of design and working documentation for the main production (excluding auxiliary, as well as site engineering networks and structures), the total design cost is determined by a set of cost indicators for designing the main and auxiliary facilities.

The cost of designing capital construction projects does not take into account the cost of designing engineering networks and communications outside the construction site.

2.1.3. If the projected object has a value of the main indicator less than the minimum or more than the maximum indicators given in the price tables of the Handbooks, the price for the development of design and working documentation is determined by extrapolation in accordance with the formula given in Appendices No. 1 and No. 2 to these Guidelines. This provision also applies to positions where in the price table before the minimum and after the maximum are the words “before” and “above”, respectively. In cases where the accepted indicator is less than half of the minimum or more than twice the maximum indicator given in the table, the base price of design work is determined in the manner prescribed by paragraph 2.1.4 of these Guidelines.

2.1.4. The price for the development of design and working documentation for the construction of facilities for which prices are not given in the Directories and cannot be accepted by analogy is determined by cost calculation in accordance with the cost calculation (RF form).

2.2. The procedure for determining the base price of the total cost of construction.

2.2.1. The base price for the development of design and working documentation is determined from the total cost of construction of the entire complex of buildings (structures) or an object, determined according to the summary estimate calculation of the cost of construction, depending on the categories of complexity of design objects.

2.2.2. The cost of construction can be determined:
- with the use of analogue objects, taking into account their comparability;
- according to aggregated indicators of the estimated cost per 1 sq.m of total area, 1 cubic meter of building volume, 1 m (km) of the route, 1 hectare of building, per unit of power, productivity, etc.
- by types or complexes of works.

2.2.3. The price for the development of design and working documentation is determined according to the tables of the Handbooks corresponding to the functional purpose of capital construction projects.

2.2.4. The base price of project documentation is determined by the formula:

C= C 01 x K i = (C p.01 * a)/100 x Ki

where FROM- base price of design and working documentation in current prices;
From 01 - base price of design and working documentation for 01.01.2001;
From p.01 - - percentage of the base price of the total cost of construction in construction cost as of 01.01.2001 in 2001 prices (Directory table). Ki- coefficient reflecting inflationary processes in

design at the time of determining the price of design work. To recalculate the cost of construction of objects from the price level as of 01/01/2000 to the price level as of 01/01/2001, a coefficient equal to 1.25 is taken.

2.2.5. When the projected object has a construction cost value that is between the indicators given in the table, the base price for the development of project documentation is determined by interpolation. If the cost of building an object is less or more than the extreme cost indicators given in the price table, the base price of design work is accepted in the amounts established for the extreme indicators without extrapolation towards decrease or increase.

2.2.6. In the event that the volume of construction and installation work on the construction site is less than 60% of the total cost of construction, the following coefficients are applied to the prices for design work:

up to 50% -0.95;
up to 40% -0.9;
up to 30% -0.8;
up to 20% -0.7.

2.2.7. If the contract for the performance of design work provides for the possibility of clarifying the cost of design, then such clarification is recommended to be carried out based on the cost of construction determined as a result of the design.

2.2.8. When determining the base price, coefficients that take into account complicating factors (clauses 3.3, 3.7 and 3.8 of these Guidelines) are not applied.

III. PROCEDURE FOR DETERMINING THE COST OF DESIGN WORKS, TAKING INTO ACCOUNT ADDITIONAL FACTORS AFFECTING THE LABOR OUTPUT OF DESIGN

3.1. The price for the development of design and working documentation using the mock-up design method is determined at the prices of the Handbooks using multiplying factors. If there are no established multiplying factors in the Handbooks, the price for the development of project documentation by the specified method is determined by applying the coefficients to the base price: project documentation - 1.05; working documentation - 1.1.

3.2. The binding price of standard or reusable project documentation, without making changes to the above-ground part of the building, is determined at the prices of the Reference Books using coefficients from 0.2 to 0.35. In this case, the minimum size of the coefficient is accepted when linking the object without making any changes to the aboveground and underground parts of the building. The price for binding standard or reusable project documentation with changes to it in the underground and aboveground parts is determined at the prices of the Reference Books using a general coefficient of up to 0.8, depending on the complexity of the work. The approximate scope of work on the development of individual elements of buildings and structures as a percentage of the design cost is given in Appendix No. 3 to these Guidelines.

3.3. The price for the development of design and working documentation for the construction of unique objects is determined at the prices of the Directories using a multiplying factor of up to 1.5, with the exception of the Directories, which establish a special procedure for calculating the price of these objects.

3.4. The price for the development of design and working documentation for the reconstruction of existing enterprises, workshops, buildings and structures is determined at the prices of Reference books of basic prices for design work for construction.

3.5. At the same time, when determining the cost of design work based on the value of the main natural indicator of the designed object, which should be achieved as a result of its reconstruction, technical re-equipment, applying a coefficient of up to 1.5 to the prices of the Reference books. When determining the cost of design work from the cost of reconstruction - up to 1.3.

For especially dangerous, technically complex and unique capital construction projects - up to 2.0 and 1.7, respectively.

The size of the coefficient is set by the design organization in agreement with the customer.

3.5. The cost of developing design (working) documentation for overhaul objects is determined according to the relevant Reference books of basic prices.

3.6. When compiling local estimates using the resource method, in the absence of a centralized data bank on the current cost of resources in the construction region, a multiplying factor of 1.1 is applied to the cost of developing estimate documentation.

3.7. The price for the development of design and working documentation for the construction of enterprises, buildings and structures in difficult conditions is determined at the prices of the Directories, applying the following coefficients to the cost of design work, for the development of which special requirements are established by the relevant regulatory documents:

If there are two or more complicating factors, coefficients are applied for each factor.

3.8. The price of designing enterprises, buildings and structures with the installation of imported basic technological equipment used by the design organization for the first time is determined by the prices of the Reference Books; at the same time, a coefficient of up to 1.3 is applied to the cost of types of design work, the development of which is complicated due to the use of the specified equipment, as agreed with the customer.

3.9. The costs of design organizations related to their performance of the functions of the general designer and supervision of design work transferred to subcontracts are determined in the amount of up to 2% of the price of developing design and working documentation transferred to subcontracted design organizations, and are paid additionally.

3.10. The prices of the Handbooks take into account the cost of 4 copies of design and working documentation transferred to the customer. The cost of copies of design products issued at the request of the customer in excess of the specified quantity is determined in addition to the base price.

3.11. When determining the base price of design according to the Reference books of basic prices for design work for construction, in the event of a reduction, at the request of the customer, established in the design assignment, design time compared to the standard ones, it is recommended to apply the following multiplying factors:

with a reduction in the term: by 1.2 times - up to 1.1;
1.4 times - up to 1.2;
2 or more times - up to 1.4.

3.12. Price application guidelines and correction factors given in one Handbook are not allowed to be used when determining the cost of design work according to other Handbooks.

3.13. The price for the development of design and working documentation for the construction of facilities abroad is determined taking into account complicating factors:

No. p / p Complicating factors Ratios to development cost
Project documentation working documentation
1 2 3 4
1. Translation of text materials technical documentation, inscriptions on the drawings in a foreign language 1,1 1,05
2. Translation of materials of a foreign customer into Russian 1,03 1,03
3. Double checking of calculations, drawings and specifications, calculations of the scope of work, estimate documentation and other project materials, making duplicate copies of cripples, increased requirements for the design and packaging of project documentation 1,2 1D
4. 4.1 Other factors affecting the increase in the complexity of design work: Current frequency and voltage, the difference in the permissible limits of current frequency fluctuations, different from the Russian Federation (to the cost of designing electrical equipment, power supply, low currents, and, if necessary, other sections) 1,1 1,05
4.2 Dry or humid tropical climate 1,15 1,1
4.3 When the design organization uses for the first time equipment and materials purchased in the customer's countries or supplied from other countries (according to clause 3.8 of these Guidelines) 1,3 1,3
4.4 Application of foreign norms and standards for materials and equipment, performance of structural calculations on them, etc., specified by the customer in the design assignment 1,15 1,2
4.5 Additional requirements for design and working documentation for the construction of facilities on a contract basis, including the preparation of specifications for equipment and materials for temporary import 1,1 1,1

Note - Increasing coefficients are applied to the cost of sections of project documentation or parts thereof, the development of which becomes more complicated.

3.14. When determining the cost of design work at the prices of the Reference Books, in the presence of several complicating factors and, in connection with this, several coefficients greater than one are used, the total multiplying coefficient is determined by summing their fractional parts and one. When determining the cost of design work using several coefficients less than one, the total reduction coefficient is determined by multiplying them.

When determining the cost of design work at the prices of the Reference Books, the pricing coefficients are multiplied. The pricing factors include the distribution coefficients of the base price for the development of design and working documentation, types of capital construction objects, reconstruction, as well as the coefficients established in the Reference books of basic prices for design work for construction.

3.15. The costs of design organizations located in areas where, in accordance with applicable law, payments are made due to the district regulation of wages, incl. payments for district coefficients, as well as bonuses to wages for continuous work experience and other benefits provided for by law in the regions of the Far North and areas equivalent to them, are additionally determined by introducing multiplying coefficients to the base price total,

established on the basis of the relevant justifying calculations performed by the design organization itself.

Appendix No. 1 to the Guidelines for Application

Reference books of basic prices for design work in construction

EXTRAPOLATION AND INTERPOLATION IN CALCULATION OF THE PRICE OF DESIGN WORKS

In the case when the projected object has a value of the main indicator less than the minimum or more than the maximum indicator given in the table of the Base Price Directory, the base price of the design is determined by extrapolation; at the same time, the value of the adjustment to the price is reduced by 40%, i.e. when calculating the indicator of the designed object X md accepted with a coefficient of 0.6.

If the power indicator of the object is less than the tabular indicator, the base price of its design is determined by the formula: C \u003d a + b * (0.4 * X min+ 0.6 * X ass),

where
a, in- constant values ​​taken according to the table of the minimum value of the indicator;
Х min - the minimum figure given in the table;
x ass- indicator of the designed object.

If the power indicator of the object is greater than the tabular indicator, the base price of its design is determined by the formula: C \u003d a + b * (0.4 * X max + 0.6 * X ass),

where
a, b - constant values ​​taken according to the table of the maximum value of the indicator;
X max - the maximum figure given in the table;
X ass - indicator of the designed object.

In the case when only the value "a" is given in the table, and the projected object has an indicator value that does not match those given in the table, the base price of its design is determined by interpolation or extrapolation; when extrapolating in the direction of decreasing or increasing, the value of the correction to the price is reduced by 40% (when calculating the value of the correction, a reduction factor K = 0.6 is introduced).

Appendix No. 2 to the Guidelines for Application
reference books of basic prices for project
work in construction

EXAMPLES OF DETERMINING THE BASE PRICE OF DESIGNING OBJECTS, INDICATORS OF WHICH ARE HIGHER, LOWER OR ARE BETWEEN THE INDICATORS GIVEN IN THE TABLES OF THE DIRECTORY**

Example 1. In the case when the values ​​"a" and "c" are given in the table of the Base Price Reference.

In the Reference book of basic prices for design work, a table is given:

1.1. It is required to determine the base price for the design of sewage sludge incineration facilities with a capacity of 15 thousand m 3 /year. The base price is determined by the formula:

FROM= a + b * (0.4 * X min+ 0.6 * X ass),
where
ai in - constant values ​​taken according to

table of the minimum value of the indicator;
Х min - the minimum figure given in

table;
x ass - given indicator of the designed object.

Calculation example:

66.5 + 1.2 * (0.4 x * 25 + 0.6 * 15) = 89.3 thousand rubles

*) The indicators of the tables are accepted conditionally

1.2. It is required to determine the base price for the design of sewage sludge incineration facilities with a capacity of 80 thousand m 3 /year. The base price is determined by the formula:

FROM= a + b * (0.4 * Xmax+ 0.6 * X ass),
where
ive ~ constant values ​​taken from the table

the maximum value of the indicator;
X max- the maximum indicator given in the table;

x ass- a given indicator of the designed object.

Calculation example:

66.5 + 1.2 * (0.4 * 60 + 0.6 * 80) = 152.9 thousand rubles

Example 2. In the case when only the value "a" is given in the table of the Base Price Reference.

In the reference price guide for design work is given in the table:
No. p / p Name of the design object Unit of measurement of the main indicator of the object Constant values ​​of the base price for the development of design and working documentation, thousand rubles.
but in
1 2 3 4 5
65 66 72 73 Rinsing water treatment facilities, capacity, m 3 /day. 160 500 1 m 3 / day 4,4 5,5 -
40000 80000 II 219,4 369,1

2.1. It is required to determine the base price for the design of a wash water treatment plant with a capacity of 100 m 3 /day.

Calculation example:

4.4 - (5.5-4.4) / (500-160) * (160 -100) x 0.6 \u003d 4.3 thousand rubles.

2.2. It is required to determine the base price for designing a wash water treatment plant with a capacity of 300 m 3 /day.

Calculation example:

44 + (5,5 - 4,4) / (500-160) * (300 -160) \u003d 4.9 thousand rubles.

2.3. It is required to determine the base price for designing a wash water treatment facility with a capacity of 90,000 m3/day.

Calculation example:

369.1 + (369.1-219.4) / (80000-40000) * (90000 - 80000) * 0.6 = 391.6 thousand rubles.

Annex No. 3 to the Guidelines for Application
reference books of basic prices for design work in construction

APPROXIMATE SCOPE OF WORK
FOR THE DEVELOPMENT OF INDIVIDUAL ELEMENTS OF BUILDINGS AND
STRUCTURES WHEN USING TYPICAL
AND RE-APPLICABLE PROJECTS

(as a percentage of the cost of designing the building as a whole)

N p / pName of individual elements of buildings and structuresInterest
1 2 3
I. Underground part of the building
1. Foundations, other than pile foundations, with resizing 5
2. Foundations, except for pile foundations, with a change in type 10
3. Pile foundations //. Aboveground part 15
1. Facades without processing of the heating project 12,5
2. Walls with a change in material or thickness or design 5,5
3. Floors with a change in the design, type or layout of panels 5
4. Redevelopment of premises 10
5. Floors with redesign 1,1
6. Interior decoration 1,2
7. Staircase and elevator assembly with a change in the design of the elevator 4,5
8. Window 1,0
9. Redesigned roof 5
10. Inputs 2

ON APPROVAL OF THE CODE OF RULES "SNIP 2.09.03-85

"CONSTRUCTIONS OF INDUSTRIAL ENTERPRISES"

In accordance with federal law dated December 30, 2009 N 384-FZ " Technical regulation on the Safety of Buildings and Structures" (Collection of Legislation of the Russian Federation, 2010, N 1, art. 5), Decree of the Government of the Russian Federation of November 19, 2008 N 858 "On the Procedure for the Development and Approval of Codes of Rules" (Collection of Legislation of the Russian Federation, 2008 , N 48, art. 5608), clause 5.3.15 of the Regulations on the Ministry of Regional Development of the Russian Federation, approved by Decree of the Government of the Russian Federation of January 26, 2005 N 40 (Sobraniye Zakonodatelstva Rossiyskoy Federatsii, 2005, N 5, art. 390; 2007 , N 45, item 5488), I order:

1. Approve and put into effect from January 1, 2013 the set of rules "SNiP 2.09.03-85" Structures industrial enterprises» in accordance with the appendix to this Order (not given).

2. Recognize as not operating on the territory of the Russian Federation from January 1, 2013. building codes and the rules "SNiP 2.09.03-85 "Constructions of industrial enterprises", approved by the Decree State Committee USSR on construction matters dated December 29, 1985 N 263.

3. Department of Architecture, Construction and Urban Planning Policy (D.V. Shapoval) to transfer a copy of this Order to the Federal autonomous institution“Federal Center for Rationing, Standardization and Technical Conformity Assessment in Construction” for the production and distribution of the set of rules “SNiP 2.09.03-85 “Constructions of industrial enterprises”.

Order of the Ministry of Regional Development No. 620 dated 12/29/2009

On approval of the Guidelines for the use of reference books of basic prices for design work in construction.

Do you have any questions? Learn more, come to PIR courses.

Company advantages

The General Estimate company was founded in 2009 and is constantly developing. Thanks to the high quality of services and flexible pricing policy, we are trusted more and more construction companies, design bureaus and institutes, as well as private estimators. Thanks to a large number certified specialists and a wide range of related products and services (training, consulting) for estimators, in 2013 we received the status of "Official Representative of StroySoft Region LLC in Moscow and the Moscow Region". According to the results of 2014-2015 and 2016-2017. our company took the first place among the dealers of the Moscow region.

our clients

company's news

Function No. 41 - Search routes in Smeta.ru. Creating and configuring crawl paths

Conversion factors for TSN-2001 from OAO Mosstroytseny for July 2018 have been released.

Conversion factors for TSN-2001 from GAU Mosgosexpertiza for July 2018 have been released.

Function No. 40 - Aggregated prices in Smeta.ru

  • Programs
    • Smeta.ru program
    • PIR system
    • Feasibility Study
    • RSS-2017
  • The educational center
    • Estimator courses
    • Seminars
    • Webinars
    • Course schedule
  • Estimated Department
    • Preparation of estimates for construction and installation works
    • Preparation of estimates for PIR
    • Drawing up acts KS-2, KS-3
    • Additional services
  • About Us
    • About company
    • our employees
    • Contacts

105120 Moscow, Sergiy Radonezhskogo street, 2, room VII, room 6, floor 1

© 2010-2018 General Estimate LLC

By clicking the buttons "Get a quotation", "Register", "Send an application", "Send a message", "Order a callback" and other buttons to send these forms, you are considered to have joined it.

When legislation changes, the Agreement may be subject to change.

If you think that the Agreement or the Site Administration violates your rights, please report it to the email address:

1. Terms used in this Agreement:

1.1. The site is a collection of texts, graphic elements, design, images, program code, photo and video materials and other results of intellectual activity contained on the Internet under the domain name https://general-smeta.ru

1.2. The Site Administration is a person who has the rights to administer the Site.

1.3. The User is any person who has logged into the Site and accepted the terms of this Agreement, regardless of the fact of passing the registration and authorization procedures.

2. Use of personal data

2.1. By accepting the terms of this agreement, the User grants the Site Administration consent to the processing of his personal data.

2.2. Purpose of personal data processing: fulfillment by the Administration of obligations to the User under this Agreement, promotion of goods and services, customer support.

2.3. The following personal data are subject to processing:

2.3.1. Surname, name, patronymic of the User;

2.3.2. User's email address (Email);

2.3.3. User's phone number.

2.4. The processing of personal data means the following list of actions with personal data: collection, recording, systematization, accumulation, storage, clarification (updating, changing), extraction, use, transfer (distribution, provision of access), depersonalization, blocking, deletion, destruction of personal data .

2.5. Personal data is obtained in connection with the conclusion of an agreement to which the subject of personal data is a party. Personal data is not distributed, nor is it provided to third parties without the consent of the subject of personal data and is used by the operator solely to fulfill the specified agreement and conclude contracts with the subject of personal data.

2.6. The Administration has the right to send information, including advertising messages, to the User's e-mail. The user has the right to refuse to receive advertising and other information without explaining the reasons for the refusal by informing the Administration of his refusal by any phone number indicated on the Site, or by sending a corresponding application to email address, or by clicking the "Unsubscribe" button contained in each information message. Service messages informing the User about the order and the stages of its processing are sent automatically and cannot be rejected by the User.

2.7. This consent on the processing of personal data is valid indefinitely, but can be withdrawn by the subject of personal data on the basis of a personal application sent by e-mail to the Site Administration.

2.8. The Site Administration undertakes to use the User's personal data obtained as a result of using the Site in accordance with the requirements of the legislation on the protection of personal data, including federal law No. data.

3. By joining this Agreement and leaving your data on the Site, by filling in the fields of the online application, the User:

  • confirms that the personal data indicated by him belong to him personally;
  • acknowledges and confirms that he has carefully and fully read this Agreement and the conditions contained therein for the processing of his personal data indicated by him in the fields online applications on the site;
  • acknowledges and confirms that all the provisions of this Agreement and the conditions for processing his personal data are clear to him;
  • agrees to the terms of personal data processing without any reservations or restrictions.

3.1 The User confirms that, by accepting the terms of the Agreement, he acts freely, of his own free will and in his own interest.

general-smeta.ru

Order 620 of the Ministry of Regional Development

Before sending an electronic application to the Ministry of Construction of Russia, please read the rules of operation of this interactive service set out below.

1. Electronic applications in the field of competence of the Ministry of Construction of Russia, filled in in accordance with the attached form, are accepted for consideration.

2. An electronic appeal may contain a statement, complaint, proposal or request.

3. Electronic appeals sent through the official Internet portal of the Ministry of Construction of Russia are submitted for consideration to the department for working with citizens' appeals. The Ministry provides an objective, comprehensive and timely consideration of applications. Consideration of electronic appeals is free of charge.

4. In accordance with Federal Law No. 59-FZ of May 2, 2006 “On the procedure for considering applications from citizens of the Russian Federation”, electronic applications are registered within three days and sent depending on the content in structural units Ministries. The appeal is considered within 30 days from the date of registration. An electronic appeal containing issues, the solution of which is not within the competence of the Ministry of Construction of Russia, is sent within seven days from the date of registration to the appropriate body or the appropriate official, whose competence includes resolving the issues raised in the appeal, with notification of this to the citizen who sent the appeal.

5. An electronic appeal is not considered when:
- the absence of the name and surname of the applicant;
— indication of an incomplete or inaccurate postal address;
- the presence of obscene or offensive expressions in the text;
- the presence in the text of a threat to life, health and property official as well as members of his family;
- using a non-Cyrillic keyboard layout or only capital letters when typing;
- the absence of punctuation marks in the text, the presence of incomprehensible abbreviations;
- the presence in the text of a question to which the applicant has already received a written answer on the merits in connection with previously sent appeals.

6. The response to the applicant of the appeal is sent to the postal address specified when filling out the form.

7. When considering an appeal, it is not allowed to disclose the information contained in the appeal, as well as information relating to the private life of a citizen, without his consent. Information about the personal data of applicants is stored and processed in compliance with the requirements Russian legislation about personal data.

8. Appeals received through the site are summarized and submitted to the leadership of the Ministry for information. The answers to the most frequently asked questions are periodically published in the sections "for residents" and "for specialists"

www.minstroyrf.ru

Guidelines

Guidelines for the use of reference books of basic prices for design work in construction

MINISTRY OF REGIONAL DEVELOPMENT
RUSSIAN FEDERATION

On approval of the Guidelines for the use of reference books of basic prices for design work in construction

In accordance with the Regulations on the Ministry of Regional Development of the Russian Federation, approved by Decree of the Government of the Russian Federation dated January 26, 2005 No. 40 (Collected Legislation of the Russian Federation, 2005, No. 5, Art. 390; No. 13, Art. 1169; 2006, No. 6 , Article 712; No. 18, Article 2002; 2007, No. 45, Article 5488; 2008, No. 22, Article 2582, No. 42, Article 4825, No. 46, Article 5337; 2009, No. 3, Article 378, No. 6, item 738; No. 14, item 1669; No. 38, item 4497), by order of the Ministry of Regional Development of the Russian Federation of April 11, 2008 No. 44 "On approval of the Procedure for the development and approval of standards in the field of budget regulation and pricing in the field of urban planning” (registered by the Ministry of Justice of the Russian Federation on May 12, 2008, registration No. 11661, Bulletin of Normative Acts of Federal Executive Authorities, 2008, No. 22) and by order of the Ministry of Regional Development of the Russian Federation dated August 20, 2009 No. 353 "On approval of the qualification of estimated norms assets to be used in determining the estimated cost of capital construction projects, the construction of which is financed with the involvement of federal budget funds ”(registered by the Ministry of Justice of the Russian Federation on 02.10.2009 registration No. 14940, Bulletin of normative acts of federal executive bodies, 2009, No. 42) order :

1. Approve as a state estimate standard the attached Guidelines for the use of reference books of basic prices for design work in construction.

2. The Department for Regulation of Urban Development (I.V. Ponomarev), within 10 days from the date of signing, send this Order for state registration to the Ministry of Justice of the Russian Federation.

3. To impose control over the execution of this order on the Deputy Minister of Regional Development of the Russian Federation S.I. Kruglik.

And about. Minister V.A. Tokarev

Approved

by order of the Ministry of Regional

development of the Russian Federation

dated December 29, 2009 No. 620

ON THE APPLICATION OF DIRECTORIES OF BASIC PRICES FOR DESIGN WORKS IN CONSTRUCTION

EN-US'>I . MAIN PROVISIONS

1.1. Guidelines for the use of reference books of basic prices for design work in construction (hereinafter referred to as the Guidelines) are intended to determine the cost of developing design and working documentation for the construction of new buildings and structures, their reconstruction, expansion and technical re-equipment (hereinafter referred to as the construction of facilities), determined from application of reference books of basic prices for design work in construction.

1.2. The provisions given in the Guidelines apply to all Reference books of basic prices for design work in construction (hereinafter referred to as the Reference books) entered in the federal register of estimated standards to be used when determining the estimated cost of capital construction projects as state estimated standards.

1.3. When using the Handbooks, the following should be taken into account:

1.3.1. The base prices of the Reference books are set depending on the natural indicators of the design objects (capacity, length, capacity, area, etc.) or on the total cost of construction.

1.3.2. The prices given in the Handbooks are set in accordance with the composition and requirements for the content of sections of project documentation for the construction of enterprises, buildings, structures, provided for by Decree of the Government of the Russian Federation dated February 16, 2008 No. 87 “On the composition of sections of project documentation and requirements for their content ”(Collected Legislation of the Russian Federation, 2008, No. 8, Art. 744).

1.3.3. The Handbooks provide prices for individual design of capital construction objects of buildings and structures using drawings of standard (reusable) products and assemblies for individual elements of building structures.

1.3.4. The prices in the Handbooks take into account the costs of developing design and working documentation, attributable without value added tax.

1.3.5. The prices of the Handbooks include the following works and services:

1.3.5.1. Production of demonstration materials (except for demonstration layouts).

1.3.5.2. Participation of the design organization together with the customer in coordinating the finished project documentation with state bodies and local governments.

1.3.5.3. Protection of project documentation in expert and approving instances.

1.3.6. The prices of the Handbooks for the development of design and working documentation do not include the costs of:

1.3.6.1. Development of the design solutions specified in the design assignment in several versions, with the exception of variant studies to select the optimal design solutions.

1.3.6.2. Development of solutions for the monumental and decorative design of enterprises, buildings and structures.

1.3.6.3. Making changes to the design and working documentation (with the exception of correcting errors made by the design organization).

1.3.6.4. Development of detailed drawings of metal structures (KMD) and industrial pipelines of factory production.

1.3.6.5. Carrying out surveys and measuring work at facilities subject to reconstruction, expansion and technical re-equipment.

1.3.6.6. Development of design documentation for custom-made equipment, in addition to the preparation of initial requirements for the design of this equipment.

1.3.6.7. Business trips. The base prices of the Guides do not take into account the costs of business trips, including the costs of administrative personnel, if the business trips of this personnel are directly related to the design of the facility.

1.3.6.8. Development of projects for the production of works (R&D).

1.3.6.9. Development of working documentation for the construction of temporary buildings and structures for the needs of construction organizations.

1.3.6.11. Research and experimental work.

1.3.6.12. Development of automated enterprise management systems (APCS) and automated process control systems (APCS).

1.3.6.13. Development of the section "Measures for civil defense and measures to prevent natural and man-made emergencies." The base price for the development of the specified section is determined by the relevant Directory.

1.3.6.14. Performance of work on the assessment of the impact of the capital construction object on the environment (EIA).

1.4. The distribution of the base price for the development of design and working documentation is carried out, as a rule, in accordance with the indicators given in Table 1, and can be specified by agreement between the contractor and the customer.

www.complexdoc.ru

Order 620 of the Ministry of Regional Development

MINISTRY OF REGIONAL DEVELOPMENT OF THE RUSSIAN FEDERATION

ON THE APPROVAL OF THE STATE ESTIMATE STANDARDS

FOR CONSTRUCTION AND SPECIAL CONSTRUCTION WORKS IN THE SPHERE

(as amended by Orders of the Ministry of Regional Development of the Russian Federation of February 27, 2010 N 81,

dated 08/03/2010 N 358, dated 11/23/2010 N 509)

In accordance with Decree of the Government of the Russian Federation of January 26, 2005 N 40 “On approval of the Regulations on the Ministry of Regional Development of the Russian Federation and on amendments to certain acts of the Government of the Russian Federation” (Sobraniye Zakonodatelstva Rossiyskoy Federatsii, 2005, N 5, Art. 390; No. 12, article 1042; No. 13, article 1169; 2006, No. 6, article 712; No. 18, article 2002; 2007, No. 45, article 5488; 2008, No. 22, article 2582, article 2583; N 24, article 2867, article 2868; N 42, article 4825), as well as with the Order of the Minister of Regional Development of the Russian Federation of April 11, 2008 N 44 "On approval of the Procedure for the development and approval of standards in the field of estimated rationing and pricing in the field of urban planning” (registered by the Ministry of Justice of the Russian Federation on May 12, 2008, registration N 11661), I order:

By orders of the Ministry of Regional Development of the Russian Federation of February 27, 2010 N 81, of August 3, 2010 N 358, of November 23, 2010 N 509, amendments were made to Appendix N 1.

State budget standards. State elemental estimated norms for construction and special construction works(Appendix N 1 - not given);

By orders of the Ministry of Regional Development of the Russian Federation of February 27, 2010 N 81, of August 3, 2010 N 358, of November 23, 2010 N 509, amendments were made to Appendix N 2.

State budget standards. Federal unit prices for construction and special construction works (Appendix N 2 - not given).

2. Recommend to the executive authorities of the constituent entities of the Russian Federation, by July 1, 2009, to bring the relevant territorial unit prices in line with the approved state estimated standards.

3. Federal government agency"Federal Center for Pricing in Construction and Industry building materials» (E.E. Ermolaev) organize methodological support for the executive authorities of the constituent entities of the Russian Federation and regional authorities for pricing in construction in terms of bringing the relevant territorial unit rates in accordance with approved state budget standards.

4. To impose control over the execution of this Order on the Deputy Minister of Regional Development of the Russian Federation S.I. Kruglik.

The Association assists in the provision of services in the sale of timber: a telegraph pole at competitive prices on an ongoing basis. Timber products of excellent quality.

  • On Amendments to Article 13 of the Federal Law “On Energy Saving and Increasing Energy Efficiency and on Amendments to Certain legislative acts Russian Federation” and Article 9.16 of the Code of the Russian Federation […]
  • Draft Order of the Ministry of Labor and social protection RF "On approval of clarifications on certain issues of application of the norms of the Federal Law "On additional measures state support families with children" (prepared by the Ministry of Labor […]
  • Law of the Republic of Kalmykia of November 26, 2004 N 162-III-Z "On Administrative Commissions in the Republic of Kalmykia" (with amendments and additions) Law of the Republic of Kalmykia of November 26, 2004 N 162-III-Z "On Administrative Commissions in [ …]
  • Rules for the connection of telecommunication networks and their interaction Decree of the Government of the Russian Federation of March 28, 2005 N 161 “On approval of the Rules for the connection of telecommunication networks and their interaction” (as amended on June 30, December 29 […]
  • Order Federal Service execution of sentences of December 15, 2016 N 1060 "On approval of the List of operational information and operational reports on offenses and incidents submitted to the duty service of the planning department […]
  • Law of the Russian Federation of March 5, 1992 N 2446-I "On Security" (with amendments and additions) (repealed) 1992, December 24, 1993, July 25, 2002 […]

MINISTRY OF REGIONAL DEVELOPMENT
RUSSIAN FEDERATION

ORDER


In accordance with the Regulations on the Ministry of Regional Development of the Russian Federation, approved by Decree of the Government of the Russian Federation of January 26, 2005 N 40 (Collected Legislation of the Russian Federation, 2005, N 5, Art. 390; N 13, Art. 1169; 2006, N 6, 712; N 18, art. 2002; 2007, N 45, art. 5488; 2008, N 22, art. 2582; N 42, art. 378; N 6, art. 738; N 14, art. pricing in the field of urban planning" (registered by the Ministry of Justice of the Russian Federation on May 12, 2008, registration N 11661; Bulletin of normative acts of federal executive bodies, 2008, N 22) and by order of the Ministry of Regional Development of the Russian Federation of August 20, 2009 N 353 "On approval qualification of estimated standards c, to be used in determining the estimated cost of capital construction projects, the construction of which is financed with the involvement of federal budget funds" (registered by the Ministry of Justice of the Russian Federation on 02.10.2009, registration N 14940; Bulletin of normative acts of federal executive bodies, 2009, N 42)

I order:

1. Approve as a state estimate standard the attached Guidelines for the use of reference books of basic prices for design work in construction.

2. The Department for Regulation of Urban Development (I.V. Ponomarev), within 10 days from the date of signing, send this order for state registration to the Ministry of Justice of the Russian Federation.

3. The control of the execution of this order shall be entrusted to the Deputy Minister of Regional Development of the Russian Federation S.I. Kruglik.

Acting Minister
V.A.Tokarev

Registered
at the Ministry of Justice
Russian Federation
March 23, 2010
registration N 16686

Guidelines for the use of reference books of basic prices for design work in construction

Appendix

I. Fundamentals

1.1. Guidelines for the use of reference books of basic prices for design work in construction (hereinafter referred to as the Guidelines) are intended to determine the cost of developing design and working documentation for the construction of new buildings and structures, their reconstruction, expansion and technical re-equipment (hereinafter referred to as the construction of facilities), determined from using reference books of basic prices for design work in construction.

1.2. The provisions given in the Guidelines apply to all reference books of base prices for design work in construction (hereinafter referred to as the Reference Books) entered in the federal register of estimated standards to be used when determining the estimated cost of capital construction projects as state estimated standards.

1.3. When using the Handbooks, the following should be taken into account:

1.3.1. The base prices of the Reference books are set depending on the natural indicators of the design objects (capacity, length, capacity, area, etc.) or on the total cost of construction.

1.3.2. The prices given in the Handbooks are set in accordance with the composition and requirements for the content of sections of project documentation for the construction of enterprises, buildings, structures, provided for by Decree of the Government of the Russian Federation of February 16, 2008 N 87 "On the composition of sections of project documentation and requirements for their content" (Sobraniye zakonodatelstva Rossiyskoy Federatsii, 2008, N 8, art. 744).

1.3.3. The Handbooks provide prices for individual design of capital construction objects of buildings and structures using drawings of standard (reusable) products and assemblies for individual elements of building structures.

1.3.4. The prices of the Guides take into account the costs of developing design and working documentation, which are attributable without value added tax.

1.3.5. The prices of the Handbooks include the following works and services:

1.3.5.1. Production of demonstration materials (except for demonstration layouts).

1.3.5.2. Participation of the design organization together with the customer in coordinating the finished project documentation with state bodies and local governments.

1.3.5.3. Protection of project documentation in expert and approving instances.

1.3.6. The prices of the Handbooks for the development of design and working documentation do not include the costs of:

1.3.6.1. Development of the design solutions specified in the design assignment in several versions, with the exception of variant studies to select the optimal design solutions.

1.3.6.2. Development of solutions for the monumental and decorative design of enterprises, buildings and structures.

1.3.6.3. Making changes to the design and working documentation (with the exception of correcting errors made by the design organization).

1.3.6.4. Development of detailed drawings of metal structures (KMD) and industrial pipelines of factory production.

1.3.6.5. Carrying out surveys and measuring work at facilities subject to reconstruction, expansion and technical re-equipment.

1.3.6.6. Development of design documentation for custom-made equipment, in addition to the preparation of initial requirements for the design of this equipment.

1.3.6.7. Business trips. The base prices of the Guides do not take into account the costs of business trips, including the costs of administrative personnel, if the business trips of this personnel are directly related to the design of the facility.

1.3.6.8. Development of projects for the production of works (PPR).

1.3.6.9. Development of working documentation for the construction of temporary buildings and structures for the needs of construction organizations.

1.3.6.11. Research and experimental work.

1.3.6.12. Development of automated enterprise management systems (APCS) and automated process control systems (APCS).

1.3.6.13. Development of the section "Measures for civil defense and measures to prevent natural and man-made emergencies". The base price for the development of the specified section is determined by the relevant Directory.

1.3.6.14. Performance of work on the assessment of the impact of the capital construction object on the environment (EIA).

1.4. The distribution of the base price for the development of design and working documentation is carried out, as a rule, in accordance with the indicators given in Table 1, and can be specified by agreement between the contractor and the customer.

Table 1.

Table 1

Types of documentation

Percentage of base price

Project documentation

working documentation

1.5. If the design assignment provides for the simultaneous development of design documentation and partial development of working documentation, then the total percentage of the base price is determined by agreement between the construction customer and the design organization, depending on the architectural, functional, technological, structural and engineering solutions contained in the design documentation, as well as their level of detail.

1.6. When performing design work in a reduced composition of sections and volumes of work, as opposed to those provided for by the current regulatory documents, their price, regardless of the methods of its calculation, is determined by the prices for the development of design and working documentation using a reduction factor, the size of which is set by the contractor in agreement with the customer, in accordance with the complexity of work and the relative cost of developing sections of design and working documentation.

1.7. When determining the initial (maximum) price of the contract for the performance of design work to their value determined at the time of the competition (auction), it is recommended to use the deflator index established by the Ministry of Economic Development of Russia in accordance with clause 5 of the Rules for developing a forecast for the socio-economic development of the Russian Federation, approved by Decree of the Government of the Russian Federation of July 22, 2009 N 596 (Sobraniye Zakonodatelstva Rossiyskoy Federatsii, 2009, N 30, Art. 3833), effective in the middle of the standard design period.

1.8. When using the Handbooks, it should be taken into account that the Handbooks present the recommended relative costs for the development of sections of design and working documentation (as a percentage of the base price), which can be specified for subdivisions (departments) of the design organization when designing a specific facility within a certain total design cost, depending on the complexity of the work performed.

II. The procedure for using reference books when determining base prices for design work

2.1. The procedure for determining the base price depending on the natural indicators of design objects.

2.1.1. The base price for the development of design and working documentation is determined by the formula:

C = (a + bx) x K,

where:

a and c are constant values ​​for a certain interval of the main indicator of the designed object in thousand rubles;

x - the main indicator of the designed object;

K - coefficient reflecting inflationary processes in the design at the time of determining the price of design work for the construction of the facility.

2.1.2. When applying the Handbooks, it should be taken into account that the prices of the Handbooks for the development of design and working documentation for enterprises, workshops, buildings and structures take into account the cost of designing all on-site engineering networks, communications, structures and devices (electricity supply, water supply, sewerage, heat supply, etc.), including connection workshops, buildings and structures for them, as well as a scheme for the planning organization of a land plot (master plan and landscaping) within the construction site.

If the price in the Directory is set for the development of design and working documentation for the main production (excluding auxiliary, as well as site engineering networks and structures), the total design cost is determined by a set of cost indicators for designing the main and auxiliary facilities.

The cost of designing capital construction projects does not take into account the cost of designing engineering networks and communications outside the construction site.

2.1.3. If the projected object has a value of the main indicator less than the minimum or more than the maximum indicator given in the price tables of the Handbooks, the price for the development of design and working documentation is determined by extrapolation in accordance with the formula given in Appendices No. 1 and 2 to these Guidelines. This provision also applies to positions when in the price table before the minimum and after the maximum indicator there are, respectively, the words "before" and "above". In cases where the accepted indicator is less than half of the minimum or more than twice the maximum indicator given in the table, the base price of design work is determined in the manner prescribed by paragraph 2.1.4 of these Guidelines.

2.1.4. The price for the development of design and working documentation for the construction of facilities for which prices are not given in the Directories and cannot be accepted by analogy is determined by cost calculation in accordance with costing (Form 3P).

2.2. The procedure for determining the base price of the total cost of construction.

2.2.1. The base price for the development of design and working documentation is determined from the total cost of construction of the entire complex of buildings (structures) or an object, determined according to the summary estimate calculation of the cost of construction, depending on the categories of complexity of design objects.

2.2.2. The cost of construction can be determined:

- with the use of analogue objects, taking into account their comparability;

- according to aggregated indicators of the estimated cost per 1 sq.m of total area, 1 cubic meter of building volume, 1 m (km) of the route, 1 hectare of building, per unit of power, productivity, etc.;

- by types or complexes of works.

2.2.3. The price for the development of design and working documentation is determined according to the tables of the Handbooks corresponding to the functional purpose of capital construction projects.

2.2.4. The base price of project documentation is determined by the formula:

C - base price of design and working documentation in current prices;

C - base price of design and working documentation as of 01.01.2001;

- cost of construction as of 01.01.2001;

- percentage of the base price of the total cost of construction in 2001 prices (table of the Directory);

K - coefficient reflecting inflationary processes in the design at the time of determining the price of design work.

To recalculate the cost of construction of objects from the price level as of 01/01/2000 to the price level as of 01/01/2001, a coefficient equal to 1.25 is taken.

2.2.5. When the projected object has a construction cost value that is between the indicators given in the table, the base price for the development of project documentation is determined by interpolation. If the cost of building an object is less or more than the extreme cost indicators given in the price table, the base price of design work is accepted in the amounts established for the extreme indicators without extrapolation towards decrease or increase.

2.2.6. In the event that the volume of construction and installation work on the construction site is less than 60% of the total cost of construction, the following coefficients are applied to the prices for design work:

up to 50% - 0.95;

up to 40% - 0.9;

up to 30% - 0.8;

up to 20% - 0.7.

2.2.7. If the contract for the performance of design work provides for the possibility of clarifying the cost of design, then such clarification is recommended to be carried out based on the cost of construction determined as a result of the design.

2.2.8. When determining the base price, coefficients that take into account complicating factors (clauses 3.3, 3.7 and 3.8 of these Guidelines) are not applied.

III. The procedure for determining the cost of design work, taking into account additional factors affecting the complexity of design

3.1. The price for the development of design and working documentation using the mock-up design method is determined at the prices of the Handbooks using multiplying factors. If there are no established multiplying factors in the Handbooks, the price for the development of project documentation by the specified method is determined by applying the coefficients to the base price: project documentation - 1.05; working documentation - 1.1.

3.2. The binding price of standard or reusable project documentation, without making changes to the above-ground part of the building, is determined at the prices of the Reference Books using coefficients from 0.2 to 0.35. In this case, the minimum size of the coefficient is accepted when linking the object without making any changes to the aboveground and underground parts of the building. The price of binding standard or reusable design documentation with changes to it in the underground and aboveground parts is determined at the prices of the Reference Books using a general coefficient of up to 0.8, depending on the complexity of the work. The approximate scope of work on the development of individual elements of buildings and structures as a percentage of the design cost is given in Appendix No. 3 to these Guidelines.

3.3. The price for the development of design and working documentation for the construction of unique objects is determined at the prices of the Directories using a multiplying factor of up to 1.5, with the exception of the Directories, which establish a special procedure for calculating the price of these objects.

3.4. The price for the development of design and working documentation for the reconstruction of existing enterprises, workshops, buildings and structures is determined at the prices of Reference books of basic prices for design work for construction.

At the same time, when determining the cost of design work based on the value of the main natural indicator of the projected object, which should be achieved as a result of its reconstruction, technical re-equipment, - applying a coefficient of up to 1.5 to the prices of the Reference books. When determining the cost of design work from the cost of reconstruction - up to 1.3.

For especially dangerous, technically complex and unique capital construction projects - up to 2.0 and 1.7, respectively.

The size of the coefficient is set by the design organization in agreement with the customer.

3.5. The price for the development of design (working) documentation for the overhaul of facilities is determined according to the relevant reference books of basic prices.

3.6. When compiling local estimates using the resource method, in the absence of a centralized data bank on the current cost of resources in the construction region, a multiplying factor of 1.1 is applied to the cost of developing estimate documentation.

3.7. The price for the development of design and working documentation for the construction of enterprises, buildings and structures in difficult conditions is determined at the prices of the Directories, applying the following coefficients to the cost of design work, for the development of which special requirements are established by the relevant regulatory documents:

Factors complicating design

Odds

Permafrost, subsidence, swelling soils; karst and landslide phenomena; location of the construction site above mine workings, in flooded areas, etc.

Seismicity 7 points

Seismicity 8 points

Seismicity 9 points

If there are two or more complicating factors, coefficients are applied for each factor.

3.8. The price of designing enterprises, buildings and structures with the installation of imported basic technological equipment used by the design organization for the first time is determined by the prices of the Reference Books; at the same time, a coefficient of up to 1.3 is applied to the cost of types of design work, the development of which is complicated due to the use of the specified equipment, as agreed with the customer.

3.9. The costs of design organizations related to their performance of the functions of the general designer and supervision of design work transferred to subcontracts are determined in the amount of up to 2% of the price of developing design and working documentation transferred to subcontracted design organizations, and are paid additionally.

3.10. The prices of the Handbooks take into account the cost of 4 copies of design and working documentation transferred to the customer. The cost of copies of design products issued at the request of the customer in excess of the specified quantity is determined in addition to the base price.

3.11. When determining the base price of design according to the Reference books of basic prices for design work for construction, in the event of a reduction at the request of the customer, established in the design assignment, design time compared to the standard, it is recommended to apply the following multiplying factors:

while shortening the term

in more times

3.12. Price application guidelines and correction factors given in one Handbook are not allowed to be used when determining the cost of design work according to other Handbooks.

3.13. The price for the development of design and working documentation for the construction of facilities abroad is determined taking into account complicating factors:

Complicating factors

Ratios to development cost

project documentation

working documentation

Translation of text materials of technical documentation, inscriptions on drawings into a foreign language

Translation of materials of a foreign customer into Russian

Double checking of calculations, drawings and specifications, calculations of the scope of work, estimate documentation and other project materials, making duplicate copies of cripples, increased requirements for the design and packaging of project documentation

Other factors affecting the increase in the complexity of design work:

Current frequency and voltage, the difference in the permissible fluctuations in current frequency, different from the Russian Federation (to the cost of designing electrical equipment, power supply, low currents, and, if necessary, other sections)

Dry or humid tropical climate

When the design organization first uses equipment and materials purchased in the customer's countries or supplied from other countries (according to clause 3.8 of these Guidelines)

Application of foreign norms and standards for materials and equipment, performance of structural calculations on them, etc., specified by the customer in the design assignment

Additional requirements for design and working documentation for the construction of facilities on a contract basis, including the preparation of specifications for equipment and materials for temporary import

Note. Increasing coefficients are applied to the cost of sections of project documentation or parts thereof, the development of which becomes more complicated.

3.14. When determining the cost of design work at the prices of the Reference Books, in the presence of several complicating factors and, in connection with this, several coefficients greater than one are used, the total multiplying coefficient is determined by summing their fractional parts and one. When determining the cost of design work using several factors less than one, the overall reduction factor is determined by multiplying them.

When determining the cost of design work at the prices of the Reference Books, the pricing coefficients are multiplied. The pricing factors include the distribution coefficients of the base price for the development of design and working documentation, types of capital construction objects, reconstruction, as well as the coefficients established in the Reference books of basic prices for design work for construction.

3.15. The costs of design organizations located in areas where, in accordance with applicable law, payments are made due to the district regulation of wages, incl. payments according to regional coefficients, as well as wage bonuses for continuous work experience and other benefits provided for by legislation in the regions of the Far North and areas equivalent to them, are additionally determined by introducing multiplying coefficients to the base price total, established on the basis of the relevant substantiating calculations performed by the design organization itself.

Appendix N 1. Extrapolation and interpolation when calculating the price of design work

Appendix No. 1
to the Guidelines


In the case when the projected object has a value of the main indicator less than the minimum or more than the maximum indicator given in the table of the Base Price Directory, the base price of the design is determined by extrapolation; at the same time, the value of the adjustment to the price is reduced by 40%, i.e. in the calculation, the indicator of the projected object X is taken with a coefficient of 0.6.

If the power indicator of the object is less than the tabular indicator, the base price of its design is determined by the formula:

where:

a, c - constant values ​​taken according to the table of the minimum value of the indicator;





If the power indicator of the object is greater than the tabular indicator, the base price of its design is determined by the formula:

C \u003d a + in x (0.4 x X + 0.6 x X),

where:

a, c - constant values ​​taken according to the table of the maximum value of the indicator;



X - indicator of the designed object.

In the case when only the value a is given in the table, and the projected object has an indicator value that does not match those given in the table, the base price of its design is determined by interpolation or extrapolation; when extrapolating upwards or downwards, the value of the correction to the price is reduced by 40% (when calculating the value of the correction, a reduction factor K = 0.6 is introduced).

Appendix N 2. Examples of determining the base price for designing objects whose indicators are higher, lower or are between the indicators given in the reference tables

Appendix No. 2
to the Guidelines

_______________
Table indicators are accepted conditionally.

Example 1. In the case when the table of the Reference book of basic prices contains the values ​​a and c.

Sewage sludge incineration facilities with capacity, thousand m3/year: from 25 to 60

1 thousand m / year

1.1. It is required to determine the base price for the design of sewage sludge incineration facilities with a capacity of 15 thousand m3/year. The base price is determined by the formula:

where:

a and b are constant values ​​taken according to the table of the minimum value of the indicator;

X - the minimum indicator given in the table;



Calculation example:

66.5 + 1.2 x (0.4 x 25 + 0.6 x 15) = 89.3 thousand rubles

1.2. It is required to determine the base price for the design of sewage sludge incineration facilities with a capacity of 80 thousand m3/year. The base price is determined by the formula:

C \u003d a + in x (0.4 x X + 0.6 x X),

where:

a and b are constant values ​​taken according to the table of the maximum value of the indicator;

X - the maximum indicator given in the table;

X is a given indicator of the designed object.

Calculation example:

66.5 + 1.2 x (0.4 x 60 + 0.6 x 80) = 152.9 thousand rubles


Example 2. In the case when only the value a.

In the Reference book of basic prices for design work, a table is given:

Name of the design object

Unit of measurement of the main indicator of the object

Constant values ​​of the base price for the development of design and working documentation, thousand rubles.

Wash water treatment facilities, capacity, m/day

………………..

………………..

2.1. It is required to determine the base price for designing a wash water treatment plant with a capacity of 100 m/day.

Calculation example:

2.2. It is required to determine the base price for designing a wash water treatment facility with a capacity of 300 m/day.

Calculation example:

2.3. It is required to determine the base price for designing a wash water treatment plant with a capacity of 90,000 m/day.

Calculation example:

Appendix N 3. Approximate scope of work on the development of individual elements of buildings and structures when using standard and reusable projects

Appendix No. 3
to the Guidelines

(as a percentage of the cost of designing the building as a whole)

Name of individual elements of buildings and structures

Interest

I. Underground part of the building

Foundations, other than pile foundations, with resizing

Foundations, except for pile foundations, with a change in type

Pile foundations

II. Aboveground part

Facades without processing of the heating project

Walls with a change in material, or thickness, or design

Floors with a change in the design, type or layout of panels

Redevelopment of premises

Floors with redesign

Interior decoration

Staircase and elevator assembly with a change in the design of the elevator

Redesigned roof



Electronic text of the document
prepared by CJSC "Kodeks" and verified according to.

Before sending an electronic application to the Ministry of Construction of Russia, please read the rules of operation of this interactive service set out below.

1. Electronic applications in the field of competence of the Ministry of Construction of Russia, filled in in accordance with the attached form, are accepted for consideration.

2. An electronic appeal may contain a statement, complaint, proposal or request.

3. Electronic appeals sent through the official Internet portal of the Ministry of Construction of Russia are submitted for consideration to the department for working with citizens' appeals. The Ministry provides an objective, comprehensive and timely consideration of applications. Consideration of electronic appeals is free of charge.

4. In accordance with the Federal Law of May 2, 2006 N 59-FZ "On the procedure for considering applications from citizens of the Russian Federation", electronic applications are registered within three days and sent, depending on the content, to the structural divisions of the Ministry. The appeal is considered within 30 days from the date of registration. An electronic appeal containing issues, the solution of which is not within the competence of the Ministry of Construction of Russia, is sent within seven days from the date of registration to the appropriate body or the appropriate official, whose competence includes resolving the issues raised in the appeal, with notification of this to the citizen who sent the appeal.

5. An electronic appeal is not considered when:
- the absence of the name and surname of the applicant;
- indication of an incomplete or inaccurate postal address;
- the presence of obscene or offensive expressions in the text;
- the presence in the text of a threat to the life, health and property of an official, as well as members of his family;
- using a non-Cyrillic keyboard layout or only capital letters when typing;
- the absence of punctuation marks in the text, the presence of incomprehensible abbreviations;
- the presence in the text of a question to which the applicant has already received a written answer on the merits in connection with previously sent appeals.

6. The response to the applicant of the appeal is sent to the postal address specified when filling out the form.

7. When considering an appeal, it is not allowed to disclose the information contained in the appeal, as well as information relating to the private life of a citizen, without his consent. Information about the personal data of applicants is stored and processed in compliance with the requirements of Russian legislation on personal data.

8. Appeals received through the site are summarized and submitted to the leadership of the Ministry for information. The answers to the most frequently asked questions are periodically published in the sections "for residents" and "for specialists"