Beautiful projects of one-story houses made of aerated concrete: photos, catalogue. We build one-story houses from aerated concrete with a free project Projects of houses 8 by 12 one-story aerated concrete

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    external finishing: the walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, manufactured locally, based on technical specifications visualization, painted. The base is lined with decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Project for his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique Constructive decisions- all this allowed us to implement this project! Frame house made using our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, this was precisely the difficult task. They had a foundation from an old burnt house, and a landscaped area around it! A new house had to be built in short term on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new modern form with interesting innovations! appeared at home entry group, where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our area. To implement such a roof, we called upon our knowledge and modern building materials, LVL beams, fused roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is decorated with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, a style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow up quickly and in their own home in nature there are many opportunities and fresh air. We, in turn, were glad to work on an individual project for a house in a classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our current construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a difficult and expressive country project with spacious premises and a garage, large windows and sophisticated architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also, the exact timing of construction was important for Dmitry; in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places of large spans installation of LVL beams. The basement floor is insulated with 200mm basalt insulation; interfloor ceiling with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! Choosing a technology, working on a project for a long time, building a foundation, building a house with exterior finishing and then working on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also spent a long time working on the estimate, combining different finishing options and comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. A frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the proud owner of your own home and move to a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house good people and they recommended us to another good person! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior finishing, it looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies We have stepped forward so much that such unique configurations become available in a short time, because we built this project over the winter months. The main thing is to own the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project was taken as a basis European company and was adapted to the site and the wishes of the Customer’s family, a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels under the Tolento stone were added. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    Owner of a house “individual 8x9m”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas for their future home, we become doubly excited! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to relax in nature in wooden house, but it was necessary to build a house in a short time, and frame construction technology became the ideal solution for such problems! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

Houses made of aerated blocks today are one of the most popular options for suburban construction. They are suitable for both permanent residence and summer residence. Such widespread use is easy to explain - aerated concrete is inexpensive, easy to use, and has good quality thermal insulation.

You can build both one-story and two-storey house, and even “one and a half stories” - with an attic.

At the owner's request, aerated concrete houses will accommodate a sauna, a garage and/or a basement floor.

Design Features

Aerated concrete is called lightweight cellular concrete. It is obtained from a mixture of cement or lime, quartz sand, aluminum powder and water. The chemical reaction between aluminum powder and lime causes the release of gases, which creates a porous structure inside the block, distributed in equal proportions. Due to its porous structure aerated concrete blocks

  • have the following properties:
  • good thermal insulation;
  • low flammability and high fire resistance - 70 minutes;
  • excellent sound insulation;
  • frost resistance - from 50 to 100 cycles;
  • accumulation and retention of heat, thereby maintaining a constant air temperature in the house;
  • savings in material and masonry mortars due to the even and smooth surface of aerated blocks;
  • long service life - up to 100 years;

easy material processing.

Like projects made from other building materials, aerated concrete houses are divided into economy, middle and business class buildings. The first group includes the most budget-friendly construction options.

As a rule, in this situation we are not talking about the second floor; the maximum that fits into the budget is the attic. The area of ​​such buildings is about 20-30 square meters. meters. Accordingly, on a large scale summer cottage

On average, the cost of such structures ranges from 300 to 400 thousand rubles.

The attic, although not considered a full floor, allows you to significantly expand the area of ​​the house. Most often, this is where the bedroom is located, which makes it possible to create a living room below, combined with a kitchen block, a spacious bathroom and a hall. At the same time, the construction of an attic does not require as much expense as the construction of a second floor; a reinforced foundation is not needed.

Projects of middle-class aerated concrete houses (with one floor and without an attic) are developed with an area not exceeding 50 square meters. meters. Regardless of whether there is an attic or not, the cost of the project will be about 900 thousand rubles.

Again, if there is an attic, you can move the master bedroom and children's room into it (if there are children in the family).

As for the first floor, since the area is quite large, two options for using the space can be considered:

  • two or three large rooms (living room, kitchen-dining room and premises at the request of the owners - billiard room, gym, study);
  • four to five small rooms.

If you plan to live in the house permanently, you must provide a technical room (boiler room).

We should not forget that you can attach a veranda to the house and move the dining room into it. What could be more pleasant than drinking a cup of tea while looking at a blooming garden?

As for business-class aerated concrete houses, these projects are unusually comfortable, these are full-fledged cottages. Their cost is from two million rubles and more, and their area is at least 80-90 square meters. m.

Luxury cottages include spacious rooms:

  • bedrooms;
  • kitchen;
  • separate dining room;
  • block auxiliary premises(boiler room, storage room);
  • living room, possibly with a bay window;
  • wardrobe;
  • cabinet;
  • bathrooms and toilets, possibly with a sauna;
  • ground floor with standard height ceiling;
  • additional premises depending on the owner’s wishes - a garage for one or two cars, a heated veranda, a greenhouse with a winter garden.

An open summer terrace with a barbecue area can be attached to the house. In a word, the owner’s flight of imagination can only be limited by his budget. Otherwise, there are no obstacles to building the cottage of your dreams from aerated concrete blocks.

This material allows you to build houses of all listed comfort classes and in southern regions, both in the middle zone and in the north. Aerated concrete is compatible with any type of heating - stove, fireplace, boiler.

In addition, it is strong enough to build two-story houses from it. That is why it is so widely used in the construction of country houses.

Choosing a foundation

Compared to others building materials aerated concrete blocks are lightweight. It is for this reason that houses made of aerated concrete do not require the construction of a complex and expensive foundation. The only condition is that the base must be correctly calculated. Since a wall made of aerated concrete blocks is a rigid, non-plastic structure, if the foundation sags, it will crack.

What type of foundation will be is decided by analyzing the quality of the soil and the parameters of the house itself. Low-rise houses - up to 3 - are built from aerated concrete.

The most suitable types of foundation for such buildings are:

  • tape;
  • monolith;
  • piles;
  • columnar.

The most expensive of the above will be the first and second. They require a large amount of both reinforcement and concrete, and this entails costs both in terms of finances and construction time.

Therefore, if you do not want to invest a large amount of labor and financial resources in the construction of the foundation, it is better to opt for the columnar-strip option. This will help you save on the slabs in the foundation of your home.

However, there are situations when only a strip foundation can be used to build a house. For example, if the soil is sandy, heaving and prone to shifting. Also, a strip foundation is needed where the foundation laying is supposed to be shallow - from 60 cm.

A monolithic foundation is usually laid where groundwater is located high to the surface. Slab bases are divided into ribbed and ribless.

If there are no stiffening ribs on the slabs, its strength level decreases, and such a foundation can be used for a small building - a storage room or a shed. For larger structures, it is better to take a shallow monolithic slab with reinforcing ribs.

Its properties are as follows:

  • when the soil freezes, it maintains its integrity without sagging or cracking;
  • high load-bearing capacity;
  • resistant to deformation due to ground movement.

These properties monolithic foundation will make it possible to build on it not only one-, but also two-, and three-story house from aerated concrete blocks. But you need to take into account that this type of foundation does not allow the installation of a basement, in addition, it is not budget-friendly.

Pile and column foundations are much more economical options, since the material consumption is much less, they are easier to build, and both are suitable for difficult soils.

Installation of both piles and pillars is carried out along the perimeter of the building using a point method. The recesses for the pillars are prepared in advance.

Further, both the pillars and the piles are connected at the top by a grillage - a reinforced concrete integral horizontal frame. The functions of the grillage are to evenly distribute the load on the piles/pillars and combine them into a solid structure. The construction of the house takes place on the grillage.

If the soil is weak, frozen, heaving or waterlogged, pile foundation can also be used, but the piles must be of a special type - screw. Then you don’t even need to level the land.

The advantages of pile and columnar foundations are:

  • the ability to install them at any time of the year;
  • settlement of the house on such a foundation is less and occurs evenly;
  • The grillage enhances the stability of the structure.

A strip foundation is better suited for two- or three-story houses.

It is not advisable to use aerated concrete blocks for the foundation of a house, since this material is quite fragile and not moisture-resistant; groundwater will easily destroy it. For strip foundation FBS (solid foundation block) weighing about 3 centners is suitable.

A strip base with a shallow recess is suitable for houses without ground floor. If you need a basement, then the base will need to be recessed, with a standard depth of about 150 cm. general rule, the trench should be located 20 cm deeper than the soil freezing level.

The width of the trench is calculated in each case individually and depends on how much the building weighs. Wall thickness is another parameter that must be taken into account when calculating the foundation. Therefore, the width of the base should exceed the width of the wall by 10 cm. The wall is located in the middle of the trench, and 5 cm of trench remains on each side.

To find out bearing capacity soil in the region in which construction is taking place, you can contact both the Internet and the specialists of the design workshop. If you know what type of soil is where construction is planned, it is not difficult to find out.

Blueprints

If you have some skills, you can develop a project for a one-story house made of aerated concrete yourself or seek help from the appropriate specialists.

If you are planning to build an economy or middle class building with an area of ​​8 by 10, the calculations and drawings can be developed alone.

In the case when you “swing” at a luxury cottage 10x10 with an area of ​​100 sq. meters or even more - 150 sq. meters, it is better to have professionals help you. Since a house of this size is not cheap, you should not try to save money on its design, because this is the plan on the basis of which your dream will be realized.

Minimum load-bearing wall thickness according to building regulations is 250 mm, even if it summer house. Smaller wall thickness is not able to withstand roof loads and influence external factors, such as the wind. For year-round living in a house, it must be equipped with a heating system, facade insulation and ventilation. For internal partitions Smaller blocks are used, their thickness is 100mm.

Finishing a house made of aerated concrete should be taken seriously. Aerated concrete is a material with increased vapor permeability. Due to temperature differences (indoors and outdoors), condensation forms in it. Therefore, for external finishing it is worth choosing a material that helps reduce vapor permeability. The most budget option finishing is painting. However, in this case the walls should be close to a perfectly flat state. You can reduce the cost of painting by using inexpensive façade putty. To give it the desired color, add water-based color. The most rational finishing option is a ventilated facade using sheet finishing materials (block house, siding, etc.). The most expensive is facing brick, but it is also the most durable and reliable.

To reduce the cost of construction, you can abandon the full second floor and make an attic. To save money, it is better to choose a house shape that is close to a cube, with a minimum number of protrusions and complex shapes, and to abandon bay windows and balconies. A large number of windows and a minimum of internal partitions also reduce the cost of building from aerated concrete

Researchers believe that an area of ​​30 square meters per person is the most comfortable option. However, when designing a house, the construction budget is taken into account first of all. The size of the plot also matters, its landscaping is important, as is the comfort inside the house. If the plot is not large, it makes sense to think about the second floor or attic.

To answer this question, you first need to carry out geological surveys. At high level groundwater construction of the basement floor will be unreasonably expensive. But if the soil allows, then building a basement will be appropriate when you want to: make a workshop or a room for storing equipment, make a swimming pool or sauna. If the site is on a slope, such a basement will form naturally. During construction, you can equip it and find useful uses for it.

  • -it must be pitched;
  • - the edges should be extended as much as possible so that less moisture gets onto the facade;
  • - it is better to abandon heavy materials (natural tiles) in order to reduce the load on load-bearing walls;
  • - tightness must be maintained so that moisture does not seep inside.

When choosing materials, it is better to turn to classic sheet materials. The most budget-friendly, but at the same time reliable and durable - slate (asbestos-cement sheet). However, such a sheet cannot be mounted independently due to its weight and fragility; it periodically requires treatment against fungus. A very practical material is bitumen slate (ondulin). It is easy to install and affordable. Unlike metal tiles, it is silent.

The geology of the site includes checking and studying the soil, this allows you to optimize the cost of the foundation.

What happens if you don't do geology?

If you ignore this stage, then you can choose the wrong foundation and lose from 1,000,000 rubles on alterations.

10 year warranty on foundation, walls, ceilings and roofing.

Ask an engineer a question

What is included in the Engineering Solution?

Documentation on the location and equipment of all technical rooms, electrical points, water supply, ventilation, gas and sewerage.

What is included in a design solution?

Detailed plan and instructions for the foreman, which displays all necessary steps and technologies for the construction of foundations, walls and roofs.

What is included in the architectural solution?

Creation of a sketch and its 3D image, which shows the location and size of rooms, walls, roofing, furniture, windows and doors.

What will you get after this stage?

All technical and visual documentation. Author's supervision of the construction progress. Our architect and designer will visit the site weekly.

Still have questions? Ask them to an engineer.

Ask an engineer a question

What determines the timing?

The timing depends on the chosen project and material (houses made of logs and timber require time to shrink).

What is "house shrinkage"?

This is a natural process of changing the volume of wooden walls and other parts due to drying of the wood.

Who will build my house?

We have our own staff of certified workers and foremen with at least 5 years of specialized experience. The park was put into operation in 2015 construction equipment. Contracting organizations We don't attract.

Still have questions? Ask them to an engineer.

Ask an engineer a question

I want it like in this picture. You can?

Yes! You can send us any image and we will design and build what you want.

Do you have a designer on your staff?

Currently there are 5 interior designers on staff with a total of 74 years of specialized experience.

What is included in an interior design project?

Drawing up a 3D project by a designer, as well as support and implementation of all finishing works.
We will also produce and supply furniture that suits your lifestyle and taste.

Built country house using frame technology plus a small veranda. The cost turned out to be quite economical, and the time frame was 3 and a half months. We even finished it a couple of weeks earlier than promised. We only go to the dacha in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you very much for building a house made of aerated concrete. The quality of both the material and work is excellent - FRIENDS WILL BE JEALOUS. Time frame for completed work: a house was built from scratch in approximately 4.5 months. Good luck to all of you, good clients and big houses!!


They built our house in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration in the fall), it wasn’t cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse together with them! Thank you for such professional guys that you provided us with!


Thank you so much for your work and attitude! Everything is efficient, high quality, fast! Thanks to the team led by Alexey!


The company built me ​​a great summer house! I don’t have any complaints about the company; next summer I’m going to build a bathhouse and a garage. I’ll definitely contact them. Thanks to everyone, especially Sergei’s team, who built it for me, a lot depends on them!


We built a house from aerated concrete in your company - I’m very pleased. The house was erected on our pre-prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend it.


In August 2017 I ordered the foundation ( monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend it because... We were pleased with the result. Everything was done quickly and professionally.


We ordered a house and garage from this company in the summer of 2016. The builders worked for about 4 months, without a break (they really liked it). Everything was done according to the agreement, extra money didn't ask.


Frequently asked questions before construction

About company

How long has your company been in business?

Our company began work as a repair and finishing company in 2007. From that moment on, we have grown into the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

How is the competence of specialists confirmed?

All architects and engineers of the company have qualification certificates. Because the project is not subject to a company license, but to an architect’s certificate. By law, responsibility for the project lies with the architect.

Does your company do all the work? Or do you use contractors?

  • We ourselves carry out general construction, Finishing work, site arrangement, wiring engineering systems(electricity, heating around the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Searching, attracting, complying with agreements and monitoring the performance of work by contractors is our task.
  • We carry out 80% of all work on the construction of your home ourselves and only 20% involve contractors.
  • We enter into an agreement with each contractor in which he specifies a guarantee for the work performed by him, and in case of malfunctions, their elimination is the responsibility of the contractor.

Is it possible to see objects that are currently in operation?

Yes, there are objects that we can show at different stages of work and houses that have already been commissioned by prior arrangement.

about the project

Should I buy a standard project or order an individual one?

Buy finished project.

  • Plus is the price.
  • The downside is that it will not include all your wishes regarding materials and layouts. Also, it will require modification to suit the characteristics of your site.

Buy a ready-made project and modify it.

It all depends on the changes you want to make. It is possible that developing an individual project will be more profitable for you than modifying a standard one.

The cost of such modifications must be discussed during the meeting.

Development individual project Houses.

  • Pros: all your wishes regarding all characteristics of the house and site are taken into account.
  • The downside is that the cost of such a project is higher than a standard one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with the architects, at which the client voices his wishes. Based on the results of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move next. During the entire design period, several meetings take place with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a working draft is developed. This is the calculation phase of each design solution in which the client is not involved.
  • This entire process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when submitting documents for a building permit.

About construction

Will you go to the site where construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighboring buildings, the presence of a slope or drop, cardinal directions and what kind of soil is on the site.

Do you help with choosing a site for construction?

Yes. Our specialists help with site selection. They will help you find it according to your requirements on the Internet with advertisements.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • house architecture features
  • work conditions (working time restrictions)

What guarantees do you provide?

We provide a 3-year guarantee on our work. The manufacturer provides a guarantee for materials and it is different in each case. There are materials for which the manufacturer provides a lifetime warranty.

How can I control construction?

  • We send each client a step-by-step photo report of the work.
  • We install online video surveillance of the facility 24 hours a day, you and the company’s specialists have access to it (paid service).
  • You can also use the services of companies that provide technical control.
  • The construction is carried out in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the estimate has been developed and approved.

When should I pay for your work?

For design, an advance payment is required within 5 days after signing the contract in the amount of 70% of total amount. The balance is paid upon delivery of the finished project to the client.

Payment for construction is broken down according to the stages specified in the estimate. Each stage of construction is also divided into payments, the size of which may vary (usually due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, it will be suitable garden house, construction trailer, an old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will accommodate our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a power of at least 5 kW and technical water.

If this is not the case, then we will bring our generators FREE OF CHARGE. In most cases, water wood construction used only for household needs, we will provide its delivery on our own.

What time of year do you carry out construction?

We build all year round, one of important conditions in the spring-autumn period this is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save by correctly calculating the estimate and choosing high-quality materials.

Perform quality project documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsk district, Voskresensky district, Dmitrovsky district, Yegoryevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomna district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Lyubertsy district, Mozhaisky district, Mytishchi district, Naro-Fominsk district, Noginsky district, Odintsovo district, Ozersky district, Orekhovo-Zuevsky district, Pavlovo-Posadsky district, Podolsky district n, Pushkinsky district, Ramensky district, Ruza district, Sergiev Posad district, Serebryano-Prudsky district, Serpukhovsky district, Solnechnogorsk district, Stupinsky district, Taldomsky district , Chekhovsky district, Shatursky district, Shakhovsky district, Shchelkovsky district.