The act of readiness of the building for the production of work. The act of readiness of foundations for the installation of equipment

Documents such as an act of readiness of foundations for the installation of equipment and an act of readiness of premises are part of the document flow between the customer and the installation organization at the preparation stage. building structures to the installation of equipment. Let's consider their content and features of their formation.

Construction readiness certificate for equipment installation

Various stages of acceptance for accounting and installation are drawn up in separate documentation. For example, the acceptance of the purchased equipment for accounting is formalized with the form No. OS-14 (act of acceptance). The fact of preparation of the facility under construction for the installation of equipment is formalized by the act of transferring the premises for the installation of equipment. When sending the metering object to the installation, an act is filled in according to the form OS-15.

The equipment is handed over for installation by the installation organization after the commission has checked the supporting structures and (or) foundations specially prepared for it.

The fact of preparation of an object under construction for the installation of equipment is formalized by an act of construction readiness for the installation of equipment.

The equipment itself (fixed machines, devices, devices) is installed by attaching it to the walls or foundations of buildings. Completion of the appropriate installation of equipment precedes its acceptance for the purpose for which it was purchased. Therefore, checking the readiness for the installation of equipment and the subsequent actions to attach it to the walls and foundation is the most important stage of construction.

The task of drawing up the act in question is to fix the results of control over:

  • compliance of building structures and foundations with established projects;
  • ready to install.

After the end of the check, a document is drawn up with the signatures of the members of the commission.

The legislation does not establish a mandatory unified form for the type of documentation under consideration. Each entity has the right to use such documentation approved independently.

The act must contain the following information:

  • what designs have been tested;
  • where exactly they are;
  • confirmation of the fact of readiness for equipment installation;
  • identified defects or the fact of their absence.

The act of checking the installation of equipment on the foundation

Installation involves a competent distribution of the stages of installation of individual support structures, components and assemblies in compliance with all established requirements. Installation of facilities includes securing equipment to foundations or other support structures, connecting it to networks, control panels, making it ready for work.

After the completion of the work (or separate stages of work) on the installation, a special act is drawn up. He records the fact of completion of the installation of the object on the foundation in compliance with all necessary requirements... It indicates:

  • equipment names and numbers;
  • its quantity and functionality;
  • technical data and other necessary information about the installed objects;
  • information about the customer's claims or lack thereof;
  • details of the relevant agreement and the date of signing.

This act is signed by the parties and executed in duplicate.

The main task of the formation of this act is to fix information about the installation, the completion of the installation stage and the absence of claims from the parties to each other. Without such fixation, the acceptance of the equipment after installation will not take place. Subsequently, the act can be applied in the event of problems resulting from poor-quality work, etc.

built ____________________________________________________________________

(name of construction installation organization)

and project number)

by the address: _______________________________________________________________________

(city, street, bindings of start and end pickets)

1. Characteristics of the gas pipeline (gas input)

The length (for the input - underground and aboveground sections), diameter, operating pressure of the gas pipeline, the type of insulation coating of the linear part and welded joints (for underground gas pipelines and gas inputs), the number of installed shut-off devices and

other structures _______________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

2. List of attached certificates, technical data sheets(or their copies) and other documents certifying the quality of materials and equipment

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

Note. It is allowed to attach (or place in this section) extracts from these documents, certified by the person responsible for the construction of the facility and containing necessary information(Certificate number, brand (type), GOST (TU), dimensions, batch number, manufacturer, date of issue, test results).

3. Data on welding of gas pipeline joints

Note. The diagram should be designed so that the location of each joint can be found from the surface of the earth. For this, bindings must be made to permanent ground objects (buildings, structures) of both the gas pipeline itself and its characteristic points (end, turning, etc.); the distances between the joints, as well as between the joints and characteristic points, including the crossed communications, must be plotted. Strict adherence to the scale of the diagram is optional.

4. Checking the depth of the gas pipeline, slopes, bedding, device cases, wells, carpets (compiled for underground gas pipelines and gas inlets)

It was found that the depth of the gas pipeline from the surface of the earth to the top of the pipe along its entire length, the slopes of the gas pipeline, the bed under the pipes, as well as the arrangement of cases, wells, carpets correspond to the project.

(position, signature, initials, surname)

5. Inspection of the quality of the protective coating of the underground gas pipeline (gas input)

1. * Before laying in a trench, the protective coating of pipes and joints was checked for mechanical damage and cracks - by external inspection, thickness - by measurement in accordance with GOST 9.602-89 mm: adhesion to steel in accordance with GOST 9.602-89; continuity - flaw detector

2. * The joints insulated in the trench were checked by external inspection for mechanical damage and cracks.

Item 3 shall be deleted

4 * Check for the absence of electrical contact between the pipe metal and the ground was carried out after full backfilling of the trench "___" ______________ 200__ g

Note. * If the trench was backfilled when the soil froze more than 10 cm in Shubin, then the construction and installation organization must carry out an inspection after the soil thawed, about which an entry must be made in the act of acceptance of the completed construction of the gas supply system object.

When checking the quality of the protective coating, no defects were found

Head of laboratory ___________________________________________________________

(position, signature, initials, surname)

Representative of the gas industry __________________________________________________

6. Flushing the gas pipeline, testing it for strength and tightness

Item 1 shall be deleted.

2 "___" ___________ 200__, before the strength test, the gas pipeline was purged with air.

3 * "___" ___________ 200__ pneumatic (hydraulic) test was performed

gas pipeline strength pressure MPa (kgf / cm 2) with exposure for _____ h.

The gas pipeline passed the strength test.

4. "___" ___________ 200__, a gas pipeline filled up to design marks with fittings installed on it and branches to facilities to shut-off shut-off devices (or the underground part of the gas inlet) was tested for tightness for ____ h

Before the start of the test, the underground gas pipeline was under air pressure for ____ h to equalize the air temperature in the gas pipeline with the ground temperature

Pressure measurements were made with a pressure gauge (differential pressure gauge) in accordance with GOST _______, class.

Data of pressure measurements during testing of an underground gas pipeline

Date of testing

Pressure measurements, kPa (mm Hg)

Pressure drop, kPa (mm)

month

number

watch

gauge

barometric

permissible

actual

P (1)

P (2)

B (1)

IN 2)

According to the data of the above pressure measurements, the underground gas pipeline passed the tightness test, no leaks or defects were found in the places accessible for inspection;

"___" ___________ 200__The aboveground gas pipeline (aboveground part of the gas inlet) was tested for tightness with a pressure of _____ MPa (kgf / cm 2) with holding for an hour, followed by an external examination and checking of all welded, threaded and flange connections. No leaks or defects were found. Overhead gas pipeline ( aerial part gas input) passed the tightness test.

Manufacturer of work _____________________________________________________________

(position, signature, initials, surname)

(position, signature, initials, surname)

7. Conclusion

The gas pipeline (gas input) was built in accordance with the project developed by

________________________________________________________________________________

(name of the design organization

________________________________________________________________________________

and project release date)

taking into account the agreed changes made to the working drawings No. ___ - ___________

Construction started"___" ___________ 200__

Construction completed"___" ___________ 200__

Chief Engineer SSMU __________________________________________________________

(position, signature, initials, surname)

Representative of the gas industry __________________________________________________

(position, signature, initials, surname)

Acceptance of a construction site also includes control over the installation of electrical equipment inside it. All data obtained during the check are entered in a special document - an act of technical readiness for electrical work.

Files

Commission creation

To check the technical readiness of the facility in terms of electrical engineering, a special commission is created. It includes representatives of several organizations:

  • customer company;
  • general contractor;
  • contractor;
  • performer.

External experts may be included if necessary, especially if it comes about some complex, specific electrical equipment, devices and technology.

Tasks of the Commission

Before proceeding with the inspection of electrical work, as well as checking the technical readiness of electrical communications and equipment, the members of the commission should familiarize themselves with the accompanying regulatory documents... These can be various kinds of SNiPs, PUEs, etc. Then, control activities, inspection and start-up of electrical appliances, the quality of their installation, uninterrupted operation is monitored. All actions fit into the act in detail.

Purpose of the document

The act allows you to solve several important points at once:

  1. it shows the technical condition of electrical communications and devices;
  2. reflects all the imperfections and shortcomings in the electrical;
  3. allows you to ensure the protection of the interests of all parties involved in the construction of the facility (if any shortcomings in terms of electrical equipment are revealed in the future);
  4. the most, perhaps the main task, solved with the help of an act - this is the admission of the object on which the electrical work was carried out, before operation (or lack of admission, if everything is bad at the object).

Sometimes, on the basis of this act, claims are made on the quality of the performed electrical work.

This is especially true if, in the event of further use of the object, wiring short-circuits, fires occur, and it is sometimes necessary to identify the culprit.

Thus, this is an extremely important document, therefore, it is necessary to treat it carefully and prescribe in detail all the subtleties and features of the installation of electrical structures, communications and equipment. And, by the way, if at this stage some serious omissions and imperfections are revealed, it is better to postpone the preparation of the act, waiting for them to be completely eliminated.

Features of drawing up a document

If you were instructed to draw up an act of technical readiness for electrical work, carefully read the recommendations below and see an example document.

Before proceeding with the descriptive part, we give general information... Since 2013 standard forms primary documents abolished, so that employees of enterprises can write them in any form. If in any of the organizations involved in the acceptance of electrical work there is an approved document form, then it is better to make an act according to its template (this is the most convenient option, since time is saved, and besides, there is no need to think about its structure and content).

You can draw up an act on letterhead or on a blank sheet of any suitable format (usually A4), filling it in by hand or on a computer. Information should be entered carefully, trying to avoid inaccuracies, mistakes and corrections.

The only thing important condition to be observed in mandatory- certify the form with the signatures of all members of the commission who were present when certifying the technical readiness of electrical work at the facility.

The seals on the letterhead must be placed only if the requirement for its use is enshrined in accounting policy organizations.

The act is drawn up in several identical copies - one for each of the interested parties. Information about the act must be entered in a special accounting log (such are usually available at all construction enterprises).

An example of drawing up an act

When formulating the text of the document, keep in mind that its composition and content must comply with certain rules of business documentation.
The act has a so-called "cap" - it fits here:

  • Title of the document;
  • date and place ( locality) drawing up;
  • organizations that participated in the construction of the facility and the installation of electrical communications (with the designation of their role - the customer, general contractor, installation company);
  • the composition of the commission, i.e. positions, surnames, names, patronymics of representatives of all enterprises are written, as well as the address of the facility at which they work.
  • first, the nature of the control actions carried out by the commission is described;
  • then a list of the design and technical documentation, in accordance with which the electrical work was carried out;
  • deviations from the project, imperfections, information about tests are indicated.

If necessary, this part of the form can be expanded (depending on the needs of the commission members and the individual characteristics of the object). All the papers attached to it must be included in the act.

In conclusion, the members of the commission give their opinion on the electrical work, as well as on the admission of the facility (in terms of the electrics) to operation. At the end, the act is signed by all persons who participated in this procedure.

APPENDIX 11

ACT
READINESS OF BUILDINGS, STRUCTURES FOR PRODUCTION OF ASSEMBLY WORKS

(the form)

Town ______________________

"___" _____________________ 19____

________
(position, full name)

construction organization ___________________________________
(position, full name)

_________
(position, full name)

inspected buildings (structures) and checked the quality of work performed

__
(name of the construction company)

1. For acceptance presented ___________________________________
____________________________________________________________

2. The work was carried out according to the project _____________________________
____________________________________________________________
(name of the design organization)

3. Start date of work _______________________________________

4. Completion date ____________________________________

Commission decision

The work was carried out in accordance with the project, standards, building codes and rules.

Buildings (structures) presented for acceptance, specified in clause 1

_____________________________________


(unit name)

Representatives:

___
(signature)

construction organization ________________________________
(signature)

___
(signature)

APPENDIX 12

ACT
ABOUT THE END OF INSTALLATION WORK

(the form)

Town _____________

"____" ___________________19 _____

Working commission consisting of:

representative of the customer (general contractor) __________________
__________________________________________________________
(position, full name)

representative of the installer ______________________
__________________________________________________________
(position, full name)

a representative of the commissioning organization (or an organization representing it)

__________________________________________________________
(position, full name)

established:

1. The installer has submitted the completed installation for acceptance.

__________________________________________________________,
(unit name)

mounted in _________________________________________
(Object name)

according to the project developed by _______________________________
(name of company)

2. Installation work completed ____________________________
__________________________________________________________

3. Start of work "____" _______________ 19 ____

End of work "____" _____________ 19 ____

Conclusion of the working commission

The installation works of the presented installation were carried out in accordance with the project, standards, building codes and regulations.

with an assessment of the quality of installation work ________________________
(excellent, good, satisfactory)

Representatives:

customer _______________________________________
(signature)

commissioning organization _____________________
(signature)

APPENDIX 13

ACT
READINESS OF TRANCHES FOR LAYING OF PIPELINES (CABLES)

(the form)

Town _________________

"____" _____________ 19 ____

An object _____________________________________________________
(Name)

Commission composed of representatives:

__________
(position, full name)


(position, f. and o.)

drew up this act stating that the completed structures of trenches for laying pipelines (cables) were inspected in the following areas:

____________________________________________________________
____________________________________________________________
____________________________________________________________

These trenches are made according to drawings

It is allowed to lay pipelines (cables) in the trenches listed in this act.

Attached:

1. Executive schemes of trenches, support structures.

2. List of permanent benchmarks.

Representatives:

customer ____________________________________________
(signature)

installer ________________________________
(signature)

APPENDIX 14

ACT
TESTING OF PIPELINES FOR STRENGTH AND TIGHTNESS

(the form)

Town _______________

"_____" ______________ 19 ___

Commission composed of representatives:

_
(position, full name)


(position, full name)

drew up this act about what was produced

_____________________________________________________________
(test method)

testing of pipelines for __________________________________
(type of test)

Test results

The test was carried out in accordance with SNiP 3.05.05-84. During the test, no defects or leaks in the piping were found. Pipe wiring listed in this act are considered to have passed the tests.

Representatives:

customer _________________________________________
(signature)

installation organization _____________________________
(signature)

APPENDIX 15

ACT
FITTING TESTS

(the form)

Town _________________

"___" _______________ 19 ___

An object _______________________________________________________
(Name)

Commission composed of representatives:

customer ____________________________________________________
(position, full name)

the installation organization (organization that carried out the valve test)


(position of full name)

drew up this act in that a test of the fittings manufactured

______________________________________________________________
(name of the company that manufactured the fittings)

Valve characteristics and test conditions

No defects were found during inspection and testing.

The fittings are considered to have passed the strength and tightness tests and are suitable for installation.

Representatives:

customer __________________________________________
(signature)

installation organization _____________________________
(signature)

APPENDIX 16

ACT
ABOUT DEFECTS OF INSTRUMENTS, EQUIPMENT AND UNITS OF AUTOMATIC FIRE EXTINGUISHING UNITS

(the form)

Town _______________

"____" ________________ 19____

An object_________________________________________________________
(Name)

This act is drawn up in the fact that in the process of revision, installation and testing (underline the stage) adopted for installation under Act No. ____ dated "_____" _________ 19 ___. equipment:

Name __________________________________________________

type and brand ___________________________________________________

factory number _______________________________________________

drawing number and design organization _________________________


(for non-standard equipment)

manufacturer ____________________________________________

date of manufacture of equipment ________________________________

date of equipment arrival at the warehouse ________________________

the following defects were found:

_______________________________________________________________
(list all detected defects, if necessary
_______________________________________________________________
attach a sketch or refer to the drawing number and part position)

_______________________________________________________________

To eliminate the identified defects, it is necessary

_______________________________________________________________
(indicate activities or works that are subject to
_______________________________________________________________
execution to eliminate defects, performers
_______________________________________________________________
and deadlines)
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________

Representatives:


(position, full name, signature)

organization that conducted the audit ______________________________

_______________________________________________________________
(position, full name, signature)

manufacturer - chief staff

_______________________________________________________________
(position, full name, signature)

APPENDIX 17

ACT
READINESS OF FOUNDATIONS (BASES) FOR INSTALLATION OF EQUIPMENT, PUMPS, COMPRESSORS, CAPACITIES, GAS BATTERIES, ETC.

(the form)

Town _______________

"____" _______________ 19____


(Name)

Building, structure, room __________________________________

This act is drawn up in that the foundation (s) under

________________________________________________________________
(equipment identification)

completed according to the project _____________________________________
(number (s) of drawings,
________________________________________________________________
date of their compilation)

corresponds (are) to the project and is (are) ready for installation work

________________________________________________________________

Special meanings:

________________________________________________________________
________________________________________________________________

Application:

________________________________________________________________

Representatives:

construction organization _______________________________________
(position, full name, signature)

installation organization __________________________________________
(position, full name, signature)

customer ______________________________________________________
(position, full name, signature)

APPENDIX 18

ACT
TESTING UNITS WITH A LOAD OR LOAD

(the form)

Town _______________

"_____" _______________ 19___

An object _________________________________________________________
(Name)

This act is drawn up in the fact that an individual test is performed without load, under load (unnecessary crossed out) of the following mounted equipment:

During the testing of the equipment, carried out for ______ hours in accordance with the BCH, it was found that


_________________________________________________________________
_________________________________________________________________

Representatives:


(position, full name, signature)


(position, full name, signature)

APPENDIX 19

ACT
MEASURING THE INSULATION RESISTANCE OF ELECTRIC WIRES

(the form)

Town ________________

"___" _____________ 19 ____

Name of the customer organization ______________________________

Name of the design organization ______________________________

Project No. ________________________________________________________

Instrument data


__________________________________________________________________

Test data

The insulation resistance of the listed wiring complies with the technical requirements.

Representatives:

customer ______________________________________________
(signature)

installation organization __________________________________
(signature)

APPENDIX 20

PROTOCOL
HEATING CABLES ON DRUMS

(the form)

Town _____________

"_____" ______________19 ____

An object _________________________________________________________
(Name)

Installation organization representatives

________________________________________________________________
(position, full name)

in the presence of the customer ________________________________________
(position, full name)

made heating cables on drums.

The listed cables are allowed for laying with the completion of work no later than "_____" ______________ 19 ___.

Representatives:

customer ________________________________________
(signature)

installation organization ____________________________
(signature)

APPENDIX 21

ACT
INSPECTION OF HIDDEN WORKS

(the form)

________________________________________________________________
(Name of works)

performed in __________________________________________________
(name of the building, structure)

Town _____________

"_____" _____________ 19____

Commission composed of representatives:

customer _____________________________________________________
(position, full name)

_______________________________________________________________
inspected the work performed by ________________________________

(name of the installer)

and drew up this act on the following:

1. The following works have been submitted for examination and acceptance:

_______________________________________________________________
(name of hidden works)

2. The work was carried out according to the project ________________________________

_______________________________________________________________
(name of the design organization, N drawings)

3. When performing the work, _____________________________ were applied

Sup> (name of materials, structures, products, etc.)

4. Start date of work __________________________________________

5. Completion date _______________________________________

Commission decision

The works were carried out in accordance with the project, standards, building codes and regulations and meet the requirements of their acceptance.

The works presented for acceptance, specified in clause 1 of this act, should be accepted with a quality assessment

_______________________________________________________________

Based on the foregoing, subsequent installation work is permitted.

_______________________________________________________________
____________________________________________________________________
(name of works and structures)

Representatives:

customer ____________________________________________
(signature)

installer ________________________________
(signature)

APPENDIX 22

PROTOCOL
TIGHTNESS TESTING OF SEALING SEALS OF PROTECTIVE PIPELINES FOR ELECTRIC PIPELINES IN EXPLOSIVE AREAS

(the form)

Town ______________

"____" ______________ 19____

Enterprise (customer) ________________________________________

An object ________________________________________________________

Commission composed of representatives:

installation organization _________________________________________

_______________________________________________________________
(position, full name)

customer _____________________________________________________
(position, full name)

carried out tests for the tightness of pipe connections for electrical wiring.

Test results

According to the tests and inspection, the installation of protective pipelines was carried out in accordance with the project and technical requirements of the "Rules for the production and acceptance of works. Automatic fire extinguishing installations".

The protective pipes are suitable for use in hazardous areas of class

________________________________________________________________

Representatives:

customer __________________________________________
(signature)

installation organization _____________________________
(signature)

APPENDIX 23

ACT
TESTS OF THE HYDROPNEUMATIC CAPACITY

(the form)

Town ________________

"_____" _____________ 19____

An object __________________________________________________________
(Name)

Commission composed of representatives:

customer _______________________________________________________
(position, full name)

installation organization ___________________________________________
(position, full name)

drew up this act in that the test was carried out

_________________________________________________________________
(container name)

Test pressure ____________ MPa (kgf / cm 2). The test was carried out in accordance with the "Rules for the production and acceptance of works. Automatic fire extinguishing installations". During the test, no defects or leaks were found in the container.

Representatives:

technical supervision of the customer _________________________________
(signature)

installation organization ______________________________
(signature)

APPENDIX 24

ACT
ON THE END OF COMMISSIONING WORKS

(the form)

Town ___________________

"____" ______________ 19_____

Compiled by representatives:

customer _____________________________________________________
(position, full name)

commissioning organization ___________________________________
(position, full name)

in that from "____" ____________ 19___ to "____" ___________ 19__

_______________________________________________________________

were carried out commissioning works on

_______________________________________________________________
(unit name)

according to contract No. ____ dated "____" ___________ 19___

As a result of the work performed:

_______________________________________________________________
_______________________________________________________________
_______________________________________________________________

With the signing of this act, the commissioning work is considered completed, and the installation that has passed the commissioning work is considered ready for presentation. acceptance committee and acceptance into operation.

_______________________________________________________________
(for more information)

Attached to the act are:

_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________

Representatives:

customer ________________________________________
(signature)

commissioning organization ______________________
(signature)

APPENDIX 25

ACT
CONDUCTING INDIVIDUAL TESTS OF AUTOMATIC FIRE EXTINGUISHING UNITS

(the form)

Town ______________

"_____" _____________19___

Object name __________________________________________

The installation was tested in accordance with the requirements of the "Rules for production and acceptance of works. Automatic fire extinguishing installations".

Charged with compressed air for testing ________________________

_______________________________________________________________
(cylinder numbers)

or filled with water ___________________________________________
(name of control units)

up to pressure ______________ in the amount of _______________________

_______________________________________________________________
(type of incentive device)
_______________________________________________________________
(name of the protected area)

Test results __________________________________________
_______________________________________________________________
(indicate in detail the test results and detected defects)

The test was carried out by representatives of:

customer _____________________________________________________

installation and commissioning organization

_______________________________________________________________
(position, full name, signature)

APPENDIX 26

PASSPORT
FOR CHARGING THE CYLINDERS OF THE GAS FIRE EXTINGUISHING UNIT

(the form)

The cylinders of the gas fire extinguishing installation have been charged

______________________________________________________________
(name of company)
______________________________________________________________
(day, month, year of charging)

fire extinguishing agent _________________________________________
(composition name)

The following materials were used for charging:

______________________________________________________________
(name and number of the certificate, its date)

______________________________________________________________

The following cylinders are charged ___________________________________

In accordance with the VEN instruction 23-73, cylinders No. ______________ to No. _______________ are charged _______________ and can be used in a gas fire extinguishing installation.

The representative of the organization who performed the charging

____________________________________________________________
(full name, signature)

M.P. "______" ____________ 19___

APPENDIX 27

STATEMENT
INSTALLED INSTRUMENTS AND EQUIPMENT OF AUTOMATIC FIRE EXTINGUISHING UNIT

(the form)

_____________________________________________________________
(Object name)

According to the project __________________________________________________


Item number and project specificationsNameType ofFactory numberNote
.
.

Accepted by ______________________________________________________
_____________________________________________________________
(position, name and surname of the customer's representative)
_____________________________________________________________
(signature)

Passed ________________________________________________________
_____________________________________________________________
(position, full name of the representative of the installation organization)
_____________________________________________________________
(signature)

APPENDIX 28

ACT
PERFORMANCE OF COMPREHENSIVE TESTS OF AUTOMATIC FIRE EXTINGUISHING UNIT

(the form)

Town _______________

"___" _____________ 19____

An object ______________________________________________________

Working commission consisting of:

chairman-representative of the customer (general contract)

_____________________________________________________________
(position, full name)

installation organization _______________________________________
(position, full name)

commissioning organization _________________________________
(position, full name)

state fire supervision ___________________________
(position, full name)
_____________________________________________________________

inspected the installation __________________________________
(Name)

assembled in accordance with the project

_____________________________________________________________
(designation
_____________________________________________________________
project and full name of the design organization)

It was found by inspection that the installation

_____________________________________________________________
(Name)

fully assembled in accordance with the project and "Rules for production and acceptance of works. Automatic fire extinguishing installations". To check the operability of the installed unit, the commission carried out a comprehensive testing

_____________________________________________________________
(name of the protected premises,
_____________________________________________________________
installation sections tested)

Artificial fires of the size _________________________
_____________________________________________________________

with combustible material ________________________________________

were installed in __________________________________________
(places of installation of fire centers)
_____________________________________________________________
_____________________________________________________________

As a result of the test, it was found

Representatives:

customer ___________________________________________________
(signature)

installation organization ______________________________________
(signature)

state fire supervision _________________________
(signature)

APPENDIX 29

ACT
ACCEPTANCE OF THE UNIT FOR OPERATION

(the form)

Town ____________

"____" _______________ 19____

Commission appointed by ________________________________________
______________________________________________________________
(name of the customer organization)

by decision of "____" _____________ 19___ No. _____ consisting of:

chairman - representative of the customer (general contractor)

______________________________________________________________
(position, full name)

commission members - representatives:

installation organization ________________________________________
(position, full name)
______________________________________________________________

commissioning organization __________________________________
(position, full name)
______________________________________________________________

state fire supervision ___________________________
(position,
______________________________________________________________
f. and. O.)

checked the work performed and established:

1. The installation and commissioning (commissioning) organization presented the unit for acceptance

______________________________________________________________
(unit name)

mounted in _____________________________________________
(Object name)

according to the project developed by ___________________________________
(name of company)

2. Installation work completed

______________________________________________________________
(name of company)

from "____" _____________ 19___ to "____" ____________ 19___

Thousand. rub.

3. Commissioning works completed

______________________________________________________________
(name of the commissioning organization)

from "____" ____________ 19___ to "____" ____________ 19___

Estimated cost of commissioning

Thousand. rub.

Actual cost of commissioning

Thousand. rub.

4. Defects and deficiencies identified in the course of complex testing were eliminated (if necessary, indicate in the appendix to this act).

Commission conclusion

An installation that has undergone comprehensive testing, including commissioning, is considered accepted into operation from "_____" __________ 19___ with an assessment of the quality of the work performed

______________________________________________________________
(excellent, good, satisfactory)

List of documents attached to the act:

_______________________________________________________________
_______________________________________________________________
_______________________________________________________________
_______________________________________________________________

Commission:

chairman of the commission ________________________________________
(signature)

members of the commission _______________________________________________
(signature)
______________________________________________________________