Acceptance certificate for operation by the acceptance committee of the completed overhaul of the facility. A sample of a defective certificate for major repairs A report for a major repair of a building is a sample


The purpose of this document is to confirm the actual state of the facility in order to identify the scale of the upcoming repair and its feasibility. And on the basis of the act, in the future, it is drawn up:

  • Repair estimate
  • Report on the feasibility of repair work.
  • An order to carry out repairs or to write off an object.

Download the form of defects for current restoration Sample of a defect certificate for overhaul The execution of an act for overhaul is performed when any defects in structural or structural elements are found on the objects being inspected. Most often, such recovery statements are compiled construction firms, on the balance of which there are many objects, equipment and other types of technology.

A sample of a defective report for overhaul

For a more complete justification of the need to implement maintenance or overhaul, the following information must be displayed in the drawn up document:

  • The name of the street and the address of the house where the renovation is planned.
  • Stages of the repair.
  • List of items required for recovery.
  • List of all notes found during research, etc.

Download the form defective statement Defective list form Download a completed sample of the defective list Contents The defect report is filled out by the institution on A4 sheets, with the obligatory content of the following data:

  1. By the family list of members of the appointed commission.
  2. The name of the institution where the survey is performed.
  3. The name of the object under study with the display of technical information, incl.

Object inspection report for major repairs

An apartment building, in which it was submitted for acceptance of work on major repairs of the general property of the owners of premises, has the following indicators: (the main indicators provided for by the project are indicated) common property owners of premises): 8. All unfinished business and defects in the work stipulated by the project documentation have been eliminated.


9. The estimated cost of capital repairs of the common property of the owners of the premises according to the approved project documentation: total thousand rubles, including: repair and construction works thousand rubles. Completed works in the amount of thous.

How to draw up a defective report for current repairs? fill pattern

Overhaul of internal combustion engines of the Customer's vehicles are carried out at a service station (hereinafter - "STOA") at the address / addresses:. 2. RIGHTS AND OBLIGATIONS OF THE PARTIES 2.1. The customer undertakes: 2.1.1. On their own and at their own expense, send the car / engine to the Contractor to the address specified in clause 1.3 of the Agreement; 2.1.2.

Inform the Contractor about the required scope of Works (services); 2.1.3. Accept the results of the Works (services) performed by the Contractor; 2.1.4. Sign all stipulated in Art. 3 of this Agreement documents; 2.1.5.

On their own and at their own expense, pick up the car within 72 hours after the Contractor informs by phone (fax) about the completion of the Works (services); 2.1.6. Make payment for the Work (service) in the manner, amount and within the time limits provided for in Art. 4 Agreements; 2.2. The customer has the right: 2.2.1.

contracts by type

Info

Require the Contractor to perform high-quality Works (services); 2.2.2. Check the progress and quality of the Works (services) performed without interfering with its activities and without violating safety rules, otherwise the Contractor has the right to prevent the Customer from accessing the place of rendering services. 2.3. The Contractor undertakes: 2.3.1. Accept cars / engines belonging to the Customer for the performance of Works (services) at the address specified in clause 1.3 of the Agreement; 2.3.2.


Inspect the car / engine both before the Contractor starts performing the Works (services), and after the completion of the Works (services) at the workshop; 2.3.3. Provide the spare parts, operating fluids and lubricants necessary for repair in a timely manner.
ACT N of 200, survey of the facility for major repairs at the address: Commission consisting of: Chairman - Deputy Heads of Administration municipality(main manager of funds) (full name of the head) Members: Representatives of the "Customer": (name of organization) (position, full name, signature, seal) (position, full name, signature , seal) Representatives of the operating organization) (name of the operating organization) (position, full name, signature, seal) (position, full name, signature, seal) inspected the object (indicate the name) and noted the following: I. General information by object Year of construction Series Number of storeys, total height, area, length, availability of equipment, etc.

Usually, a defective act for cosmetic or major repairs contains tables in its body, in which all identified faults are entered. By appearance this document is very similar to the estimate, only it does not contain prices and other cost indicators. Defective act form (a sample is at the bottom of the article), which is drawn up by the organization on hard copy, must contain the obligatory data: a list of names of the members of the expert commission; the name of the organization at which the inspection is carried out; name of the inspected object (if there is technical information, including inventory number, then it must be specified); lists of found breakdowns and factory defects are listed; recommendations are given regarding major or current repairs, etc.

e. In order for the document to become legally binding, it must be signed by all members of the expert commission.

    Dmitry Peskov leaked information about Putin's divorce to Echo of Moscow

  • Liters promo codes for free books for April - May 2018
  • Riding without light from April 1
  • The text of the 2017 total dictation. Show text. Full
  • The text of the total dictation of 2018. Show text. Full
  • Why overweight people often fluctuate depending on their diet
  • I'm sitting on Maggi.

    Volumes go away, but weight costs

  • Hormone that retains water in the body
  • Time for food to enter the large intestine
  • Girls at home with nothing, free photo. (760 photos)
  • Federal list of textbooks for the 2019 academic year. FIPI
  • Diet 14 days.

For violation by the Contractor of the deadlines for fulfilling the obligations under the contract, the Contractor shall pay the Customer a penalty in the amount of 0.1% of the cost of the Works (services) for each day of delay. The calculation of the amount of the forfeit is made from the date following the date of the expiration of the term for the performance of the Works until the date of the actual performance of the overdue amount of the Works. The date of fulfillment (non-fulfillment) of the overdue volume of Work is confirmed by an act of work performed.
6.3. For violation of the terms of payment, the Customer pays to the Contractor a penalty in the amount of 0.1% of the amount owed for each day of delay, starting from the 6th day of violation of the terms of payment. 6.4. The parties have the right to send each other claims for improper performance obligations under the contract. All claims sent to each other will be resolved by the Parties on an individual basis.
6.5.
Failure to notify or untimely notification deprives either party of the right to be exempted from obligations under this agreement. Get full text 9. DISPUTE RESOLUTION PROCEDURE 9.1. The parties are obliged to try to resolve the dispute arising out of this Agreement or in connection with it, through negotiations. 9.2.

If it is impossible to resolve disputes through negotiations, the Parties resolve them in claim procedure... Claims presented under this Agreement are considered by the Parties within 30 days from the date of their receipt. In the absence of confirmation of receipt of the claim (notification of delivery), the claim is considered received on the 10th day from the date of its dispatch.

9.3. If, within 30 days from the date of sending the claim, the dispute is not resolved by the Parties, the interested Party has the right to contact Arbitration court Yaroslavl region 10.
The capital restoration act can be filled out both in an arbitrary form and in a unified form approved by the standards of the Russian Federation. So, by the decree of the State Statistics Committee of the Russian Federation No. 7 of January 21, 2003, the standard form No. OS16 was approved, which is often used when examining objects. Only members of the commission, appointed by the heads of the institutions, on the balance sheet of which the objects are located, have the right to fill out this form.

Experts have the right to start examining the object only after familiarizing themselves with the order of the head. The commission is carefully examining the emergency fixed assets. When detecting malfunctions in structures, elements of the object, the commission is obliged to display the identified comments in the statement.

At the end of the survey, the members of the commission are obliged to provide conclusions on the state of the inspected object and an opinion on the implementation of overhaul or current restoration.

Every budgetary organization once faces the issue of overhauling its administrative building or school building, kindergarten, clinics, hospitals, etc.

Overhaul is carried out with money allocated by the budget, and the procedure for allocating funds implies documentary grounds. The documentary basis is the estimate, which is part of the overhaul project.

Before applying for funds for capital repairs of a building, a budgetary organization must order a capital repair project, including an estimate for all planned repairs.

And the estimate, in turn, is calculated by the designers on the basis of the conclusion of the survey of the bearing and enclosing structures of the building, as well as engineering networks building and attached to the conclusion of the survey of the defective statement with the volumes and location of the identified defects and destruction. An example of a defective statement:

What do you need to order for a building survey? Independent construction expertise

It is the survey of the building (independent construction expertise) that must be ordered in order to subsequently receive funding for capital repairs from the budget.

What documents does the budgetary organization receive based on the survey results?

Note that the contracting authority receives a technical report based on the survey results, which includes:

  • Conclusion based on the results of the survey of the technical condition of a building or structure.
  • Defective statement.

The basis for the subsequent calculation of the estimate is the defective statement, which indicates which defects were found in the building, where they are located and what their volume is.

Who has the right to inspect the building structures of buildings?

Conduct a survey and issue documents accepted for consideration upon allocation budget funds, maybe not every engineering company.

Extract from GOST 31937-2011 clause 4.1:
“Inspection and monitoring of the technical condition of buildings and structures is carried out by the forces of specialized organizations equipped with modern instrumentation and employing highly qualified and experienced specialists.
Requirements for specialized organizations conducting inspection and monitoring of the technical condition of buildings and structures are determined by the executive authority authorized to conduct state construction supervision. "

To legally conduct an inspection of buildings and structures, the organization must have a valid permit - SRO Certificate of admission to a certain type or types of work that affect the safety of capital construction objects (admission to inspection clause 12 of the Certificate in the list of types of work). Certificate of ETC "Kvalitet"by the link >>>

The survey is carried out in accordance with GOST 31937-2011, which is present in the list normative documents applied on mandatory basis, Government Decree No. 1521 dated 26.12.14.

What is included in the inspection of a building before a major overhaul?

The inspection of the building includes determining the state of the supporting and enclosing structures: foundations, columns, walls, floors, roofs, stairs, windows, doors, etc. If it is planned to replace windows in the building, they are also examined and, if there is wear or other defects, they are entered into the defective inventory.

What if you want to overhaul Was the worn-out utilities replaced: sewerage, water supply, electrical wiring?

In the usual conclusion of a building survey, in addition to the results of the study of load-bearing and enclosing structures, defects in engineering networks are included, which are identified by an experienced specialist during a visual inspection. This type of work is provided for in clause 5.1.11 of GOST 31937-2011.

If necessary, in rare cases, an instrumental survey of engineering networks is carried out.

In most cases, an instrumental examination is not required to compile a defective statement.

Estimated cost of building survey

The cost of building survey work depends on its construction volume (length x width x height of the building, including its basement and attic). The construction volume is indicated in the BTI passport. In accordance with article 93, parts 4) and 5) No. 44-FZ, budgetary organizations, under certain conditions, have the right to conclude "direct" contracts for amounts up to 300,000 and up to 600,000 rubles, respectively, without conducting electronic trading procedures.

We have experience in work under such contracts for the inspection of buildings and structures of budgetary organizations. Payment for the examination with us can be made without advance payment on the fact of the work performed in accordance with No. 44-FZ.

Ordering a survey of a building before overhaul by a budgetary organization online

Order a survey of the building before overhaul from us: we have required permissions, specialists and equipment.

Order a survey of the building for the purpose of overhaul for a budgetary organizationnow >>>

The first page of the defective school survey sheet in the Moscow region: