Reference book of basic prices for engineering-geological and engineering-environmental surveys for construction. JSC "P N I I S Video: Engineering and geological surveys

Before sending an electronic appeal to the Ministry of Construction of Russia, please read the rules for the operation of this interactive service set out below.

1. Electronic applications within the competence of the Ministry of Construction of Russia, completed in accordance with the attached form, are accepted for consideration.

2. An electronic appeal may contain a statement, complaint, proposal or request.

3. Electronic appeals sent through the official Internet portal of the Ministry of Construction of Russia are submitted to the department for work with citizens' appeals for consideration. The Ministry ensures an objective, comprehensive and timely consideration of applications. Consideration of electronic applications is free of charge.

4. In accordance with the Federal Law of 02.05.2006 N 59-FZ "On the Procedure for Considering Appeals of Citizens of the Russian Federation" electronic appeals are registered within three days and sent, depending on the content, to the structural divisions of the Ministry. The appeal is considered within 30 days from the date of registration. An electronic appeal containing questions, the solution of which is not within the competence of the Ministry of Construction of Russia, is sent within seven days from the date of registration to the appropriate authority or to the relevant official, whose competence includes the solution of the issues raised in the appeal, with notification of this to the citizen who sent the appeal.

5. Electronic appeal is not considered when:
- absence of the name and surname of the applicant;
- indication of an incomplete or inaccurate postal address;
- presence of obscene or offensive expressions in the text;
- the presence in the text of a threat to the life, health and property of the official, as well as his family members;
- using a non-Cyrillic keyboard layout or only capital letters when typing;
- the absence of punctuation marks in the text, the presence of incomprehensible abbreviations;
- the presence in the text of a question to which the applicant has already been given a written answer on the merits in connection with the previously sent appeals.

6. The response to the applicant is sent to the mailing address indicated when filling out the form.

7. When considering an appeal, it is not allowed to disclose information contained in the appeal, as well as information concerning the private life of a citizen, without his consent. Information about the personal data of the applicants is stored and processed in compliance with the requirements of the Russian legislation on personal data.

8. Applications received through the site are summarized and submitted to the leadership of the Ministry for information. Answers to the most frequently asked questions are periodically published in the sections "for residents" and "for specialists"

Correctly organized construction goes through all the preparatory stages of construction work. Including all kinds of variations of technical research, which are necessary for the competent development of the project. One of the important components is pre-design research. Often a person who is going to perform such work on the site is interested in the prices for this type of service, and here the SBC for engineering and geological surveys 2006 and other reference books will be very useful.

Using the price reference book for engineering and geological surveys

When carrying out engineering and geological activities, the construction area is estimated. Its characteristics are being studied, such as the physical and chemical composition of the soil. The soil is checked for the presence of minerals and other minerals, and its physical and mechanical properties are also studied.

Carrying out this kind of work has its own cost, which is indicated in the collection of base prices for engineering and geological surveys (SBC).

Compilation of basic prices (SBC) for engineering and geological surveys: why is it needed?

The collection of base prices for engineering and geological surveys is used to determine the standard cost of engineering work aimed at studying the geology of the development area. It prescribes the prices of technical surveys for the study of soil, the search and use of groundwater. Further, these prices become a benchmark when drawing up contracts with a survey company.

The most widely used collections of the following years of publication:

  1. SBC of engineering and geological surveys 1999 - intended for systemic use, in order to calculate the cost of work performed by state organizations and private companies.
  2. SBC for geotechnical survey 2004 - an updated version of the previous edition. Provides more information on increased reference prices for complex engineering activities.
  3. SBC of engineering and geological surveys 2006 - is distinguished by the presence of prices for the preparation of estimates, taking into account indexation.

The set of basic prices is intended for use by specialized firms licensed to carry out construction work. These price catalogs are an auxiliary tool for the formation of a normal price for construction surveys. They combine certain types of technical work, making them easier to find and allowing faster processing of the data provided. A complete collection and description of prices for geological surveys was described in the 1999 SBC of Geotechnical Survey.

  • making route surveys and preliminary studies of the area;
  • drilling operations;
  • research of underground communications;
  • creation of a sample base based on the soil of the construction site;
  • examination of collected samples in laboratories;
  • carrying out various works that do not require the presence on the construction site (office);
  • additional work.

When forming prices, the costs of:

  • transport within the site;
  • off-site transport;
  • the beginning and termination of construction works;
  • sampling for chemical analysis;
  • formation of the procedure for conducting surveys and issuing a report;
  • other types of auxiliary work.

In the SBC of engineering and geological surveys, the cost of the work carried out is calculated based on the salaries of engineers, the wages of workers, the price of building materials and services provided, and the amortization of production. All calculations take into account key costs (product cost).

Also, in the SBC of engineering and geological surveys in 1999, prices were calculated taking into account the structure, volume and methodology of field and other works that do not require a direct presence on the construction site. All work carried out must meet the standards of state regulatory documents.

Field work is regarded as a business trip, therefore, workers must be paid a certain amount, which is added to the total cost of field work. The cost of office work is calculated solely on the basis of the cost of materials spent on processing the received survey data. Subsequently, SBC 99 of engineering and geological surveys underwent minor changes and was republished with additions.

The presence of a price guide for engineering and geological surveys makes it possible to correctly calculate the cost of technical surveys, which helps both customers and performers when concluding a contract. If you need more information, you can always contact the specialists of GeoGIS LLC.

State Committee of the Russian Federation

on housing and construction policy

(Gosstroy of Russia)

Reference price reference

for geotechnical and environmental engineering

surveys for construction

UDC 624.131.3.003.13: 338.5 (083.78)

DEVELOPED by the Industrial and Research Institute for Engineering Surveys in Construction (PNIIIS), Institute Hydroproject JSC, SPC Ingeodin, with the participation of the Committee for Architecture and Urban Planning of the Krasnodar Territory, Research Institute of Building Physics of the Russian Academy of Architecture and Construction Sciences.

INTRODUCED by the Department for the Development of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia

APPROVED by the State Committee of the Russian Federation for Housing and Construction Policy (letter dated June 22, 1998, No. 9-4 / 84).

ACCEPTED AND INTRODUCED INTO ACTION from 01.01.1999 to replace chapters 12, 14, 15 and table 298 of chapter 17 of the Compendium of prices for exploration work for capital construction, 1982; Directory of basic prices for laboratory geotechnical works, 1996 g .; Reference book of base prices for drilling works during engineering-geological surveys for construction, 1997; Reference book of basic prices for cameral engineering-geological works, 1997.

GENERAL INSTRUCTIONS

1. Reference book of base prices for engineering-geological and engineering-environmental surveys for construction (hereinafter referred to as the "Handbook") is recommended for determining the base cost of engineering-geological and engineering-environmental surveys, surveys of ground construction materials and water supply sources based on groundwater formation of prices in agreements (contracts).

2. This Handbook is intended for use by enterprises (organizations) of various organizational and legal forms that carry out survey work and have a license to carry it out.

3. The reference book contains basic prices (hereinafter "Prices") for:

Reconnaissance (route) survey and route observations;

Drilling works;

Mining works;

Experimental filtration works, field studies of soils and sampling;

Laboratory work and research;

Cameral work;

Various works and services;

Ancillary work.

4. Prices are calculated on the basis of official salaries of engineering and technical workers, wage rates of workers, the cost of materials and services, depreciation rates for fixed assets as of 01.01.91, taking into account the main provisions on the composition of costs included in the cost of production (work, services) with the changes and additions provided for by the decree of the Government of the Russian Federation dated 01.07.95 No. 661.

5. Prices are calculated in accordance with the composition, volume and technology of field and office work, ensuring the creation of reporting documentation that meets the requirements of GOSTs and current regulatory documents (approved or agreed by the Gosstroy of Russia), and are optimal for determining the cost of these works.

The prices for field work are provided for the performance of these works in expeditionary conditions, i.e. with the payment of travel or field allowances to workers.

Prices for office processing of survey materials and laboratory work are provided for their implementation in a hospital, i.e. without payment of travel allowances or field allowances to workers.

6. Prices are given in rubles and for certain types of work are given as a fraction: above the line - the price of field work, below the line - the price of office work. In other cases, prices are provided separately for field and office work.

Primary processing of survey materials, carried out in expeditionary conditions, is taken into account in the prices for field work.

The prices also include the costs of:

a) obtaining a technical assignment for the production of surveys;

b) agreement with the customer of the program (prescription) of surveys and preparation of contractual documentation;

c) preparation, verification of instruments, instruments, equipment and metrological assurance of the unity and accuracy of measuring instruments;

d) internal control and acceptance of survey materials;

e) delivery of survey materials to the customer.

7. Prices are not taken into account and are determined additionally according to the corresponding tables (standards) of this Handbook and the following costs are provided in the estimates:

a) inland transport;

b) external transport;

c) organization and liquidation of works at the facility;

d) selection of monoliths, bulk samples and samples for analysis for contamination by chemical and bacteriological indicators;

e) drawing up and agreeing with the customer a survey program (prescription), as well as drawing up and issuing a technical report (conclusion) to the customer;

f) preparation and delivery of intermediate engineering survey materials to the customer;

g) various auxiliary work (geotechnical control, radiometric work, geodetic work, etc.);

h) registration of permits (registration) for the production of engineering surveys;

i) land reclamation;

k) installation, dismantling and maintenance (rent) of special survey equipment.

8. Prices are calculated for the conditions for the production of surveys in the middle zone of the European part of the Russian Federation (in terms of wages), a favorable period of the year and a normal regime for conducting survey works.

When determining the estimated cost of surveys carried out in other regions of the Russian Federation, as well as in an unfavorable period of the year, the corresponding coefficients are applied to the prices:

a) when performing surveys in mountainous and high-mountainous regions, the coefficients given in Table 1 are applied to the prices.

Table 1

District name

Coefficient

Mountain and alpine with absolute heights of the surface of the site above sea level, m:

from 1500 to 1700

over 1700 "2000

1,15

" 2000 " 3000

1,20

over 3000

1,25

b) when performing surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys;

c) when performing surveys in territories with a special regime, a coefficient of 1.25 is applied to the prices for field work, and in areas with radioactivity more than 1 mSv / year or 0.1 rem / year - a coefficient from 1.25 to 1.5, depending on the level of radioactivity, assessed in accordance with the Radiation Safety Standards NRB-96 (GN 2.6.1.054-96).

Note - Territories with a special regime include areas and areas where, according to the situation or the established regime, interruptions or difficulties associated with the loss of working time during surveys are inevitable: border areas, test ranges, airfields, construction sites where blasting operations are carried out, areas with a strong dusty air (construction sites, quarries, etc.), environmentally harmful areas, internal areas of explosive, harmful and hot workshops of enterprises of the defense, chemical, metallurgical, coal and mining industries, operating power plants and substations, open switchgears of power plants, strips with a width of up to 200 m of existing power transmission lines with a voltage of 500 sq. and higher. The canvas of railways and highways, main streets (avenues) of cities, the territory of railway stations, ports, etc., where delays and interruptions in work caused by heavy traffic, etc. are inevitable.

d) when performing field survey work in an unfavorable period of the year in the relevant areas (according to Appendix 2), the coefficients given in Table 2 are applied to their cost.

table 2

Duration of the unfavorable period, months:

Coefficient

2-3,5

4-5,5

6-7,5

8-9,5

e) when performing surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3, 4) or in accordance with the resolution of the Council of Ministers of the RSFSR dated 04.02.91, No. 76, republican, regional, regional, etc. regional coefficients have been established by government or administrative authorities for the wages of workers engaged in surveys; the coefficients shown in Table 3 are applied to the total estimated cost of these surveys.

Table 3

Regional coefficient to wages

Coefficient to the total estimated cost of surveys

1,10

1,05

1,15

1,08

1,20

1,10

1.25

1,13

1,30

1,15

1,40

1,20

1,50

1,25

1,60

1,30

1,70

1,35

1,80

1,40

1,90

1,45

2,00

1,50

Note - When new regional coefficients to wages are introduced after 07/01/98 in a legislative or directive manner, the coefficients to the total of the estimated cost of surveys are determined in accordance with Table 3.

f) when conducting surveys by organizations making payments related to the provision of benefits to persons working in the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of the survey :

1.50 - when performing surveys in the Far North;

1.25 - the same in areas equated to the regions of the Far North;

1.15 - in the southern regions of the Irkutsk region, the Krasnoyarsk region and the Far East (Amur region, Primorsky and Khabarovsk regions), in the Arkhangelsk and Chita regions. Republics of Buryatia, Karelia, Komi (except for the regions of the Far North and areas equated to the regions of the Far North).

Note - With the simultaneous application of the coefficients specified in subparagraphs "e" and "f" of paragraph 8, the total multiplying coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients of Table 3 and subparagraph "e".

9. Expenses for inland transport are determined according to Table 4 as a percentage of the estimated cost of field exploration work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions), including expenses for the maintenance of bases, radio stations, as well as installation, dismantling and maintenance of prospecting equipment, determined according to tables 100 and 101.

Table 4

Distance from the base of the survey organization, expedition, party or detachment

Internal transport costs,% at

estimated cost of field and survey work,

thousand roubles

to the survey site, km:

up to 5

St. 5 to 10

St. 10 to 20

St. 20 to 50

over 50

up to 5

8,75

6,25

3,75

St. 5 to 10

11,25

10,0

8,75

6,25

"10 "15

13,75

12,5

11,25

10,0

8,75

" 15"20

16,25

15,0

13,75

12,5

11,25

" 20" 25

18,75

17,5

16,25

15,0

13,75

Notes. 1. Expenses for inland transport are allowed to be determined based on actual costs in prices of the current period:

a) with an estimated cost of field survey work up to 5 thousand rubles;

b) when the survey site is removed from the base of the survey organization, expedition, party or detachment at a distance of more than 25 km;

c) when performing field survey work in the regions of the Far North and equivalent areas, in sparsely populated (uninhabited) areas (alpine, desert, taiga, tundra), when the survey site is removed from the base of a survey organization, expedition, party or detachment at a distance of up to 25 km;

d) related to the rental and maintenance of special vehicles - airplanes, helicopters, all-terrain vehicles, boats, barges, longboats, reindeer and dog teams, camels, horse packs, etc.

2. In the case of determining costs in the prices of the current period, the standards of Table 4 are not applied.

10. Expenses for external transport associated with the travel of workers and transportation of survey equipment and cargo from the permanent location of the organization performing the survey to the base of the survey expedition, party or detachment (or to the survey site) and vice versa, are determined according to Table 5 as a percentage of the estimated the cost of field exploration work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions), including the costs of inland transport, determined according to table 4 (excluding the costs provided for in note 1 of table 4), as well as the costs of maintenance of bases and radio stations, installation, dismantling and maintenance of survey equipment, determined according to tables 100 and 101.

Table 5

Distance of travel and transportation in one direction, km:

External transport consumption in both directions,% of the estimated cost of surveys carried out in

expeditionary conditions, duration, months.

up to 1

12 and more

St. 25 to 100

14,0

11,5

" 100 " 300

19,6

15,4

12,7

" 300" 500

25,2

21,0

16,8

" 500" 1000

30,8

25,2

19,6

" 1000 "2000

36,4

32,2

28,0

13,2

over 2000

39,2

36,4

20,0

16,0

12,0

Notes: 1. Costs for external transport at distances up to 25 km are not included in the estimates.

2. When performing certain types of surveys costing up to 5 thousand rubles. or the presence of unfavorable conditions for the passage of workers and the carriage of goods to hard-to-reach areas of research and back, the costs of external transport can be determined based on actual costs in prices of the current period.

3. Expenses for external transport in executive estimates may be determined in prices of the current period.

4. In the case of determining costs in the prices of the current period, the standards of Table 5 are not applied.

11. When carrying out surveys in especially difficult natural conditions (on the polar islands, in the glacier zone, in the alpine, desert, taiga and tundra regions), special events (attraction of mountaineering instructors and guides, organization of a rescue service, etc.) may be envisaged. additional costs, which are determined by the actual costs in the prices of the current period.

12. Determined by actual costs (price lists, tariffs, invoices, etc.) in the prices of the current period and additionally taken into account in the cost of surveys costs associated with:

Obtaining (acquisition) of initial data and information about natural conditions, aerial photography, cartographic and other materials of surveys of past years;

Carrying out the necessary approvals related to the production of certain types of field work (location of mine workings, boreholes, points of experimental work, etc.);

The production of special types of analyzes and studies of soil and soil samples, bottom sediments, surface and ground waters of snow and ice, performed by specialized laboratories licensed to carry out such work (bacteriological analysis, complete tests of aggregates in concrete, radiochemistry of isotopes, etc.) ;

Payment for the cost of casing pipes, filter strings and other materials left in wells during water drilling and for stationary observations;

By purchasing a logging ticket; compensation for material damage associated with deforestation during surveys;

Compensation to land users for material damage caused in connection with losses and surveys on their land plots;

Payment for the services of third-party organizations required for the production of surveys.

13. The costs of organizing and eliminating work at the facility are determined at the rate of 6% of the estimated cost of field survey work, taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions, including the costs of inland transport, determined according to table 4 , (except for the costs provided for in Note 1 of Table 4), as well as the costs of maintaining bases and radio stations, assembling, dismantling and maintaining survey equipment, determined according to Tables 100 and 101.

Notes: 1. The following coefficients are applied to the amount of expenses for the organization and liquidation of works, determined in clause 13:

2.5 - for surveys with an estimated cost of up to 2 thousand rubles. or during surveys (regardless of their cost) carried out in the Far North and equivalent areas, as well as in sparsely populated (uninhabited) areas (high-mountainous, desert, taiga and tundra):

2.0 - for surveys with an estimated cost of more than 2 to 5 thousand rubles;

1.5 - the same, over 5 to 10 thousand rubles.

2. When performing field surveys at the facility continuously for more than one year, the coefficients given in Table 6 should be applied to the costs of organizing and eliminating works.

Table 6

Duration of field surveys, months:

Coefficient

St. 12 to 16

" 16" 20

" 20" 24

St. 24

14. When carrying out field work without paying workers travel allowances or field allowances, a coefficient of 0.85 should be applied to the prices for these works.

When performing office processing of survey materials and performing laboratory work in expeditionary conditions (with payment of field allowances or travel expenses), a coefficient of 1.15 is applied to the prices for these works.

15. If it is necessary to issue to the customer intermediate survey materials (if it is provided for by the terms of reference, the program), a coefficient of 1.1 is applied to the cost of these surveys (except for the costs specified in clauses 9-13).

16. When applied to prices (cost) of several coefficients established by the Directory, the latter are multiplied (except for the coefficients of subparagraphs "e" and "f" of paragraph 8).

17. The estimate attached to the contract provides for additional costs for work and services listed in clause 12 of the General Instructions, as well as unforeseen costs associated with plugging wells, construction of temporary buildings and structures (foundations for tents, crossings over ditches and ditches, installation of stairs on steep slopes, sheds, courtyard latrines, berths for boats and boats, etc.) in the amount of at least 10% of the estimated cost of survey work.

18. The prices of this Handbook are given to the average cost level as of 01.01.91. Bringing the base cost of engineering surveys to the price level of the current period is carried out by applying the inflation index to this cost, which is determined in accordance with the established procedure.

19. The inflation index is not applied to the costs determined by actual costs. Costs that are priced in the current period are included in a separate estimate.

PART I. BASIC PRICES FOR RECONSTRUCTION (ROUTE) SURVEY AND ROUTE OBSERVATIONS

General Provisions

1. This part shows basic prices for:

engineering-geological, (hydrogeological and engineering-ecological reconnaissance (route) survey;

route observations carried out in the preparation of engineering-geological, engineering-hydrogeological, engineering-ecological and soil maps of scales 1: 50000 1: 500.

2. Prices are developed for the following categories of complexity of geotechnical conditions.

Table 7

Factors

Geomorphological conditions

Site (site) within one geomorphological element. The surface is horizontal, undivided

Site (site) within several geomorphological elements of the same genesis. The surface is inclined, slightly dissected.

Site (site) within several geomorphological elements of different genesis. The surface is highly dissected.

Geological in the field of interaction of buildings and structures with the geological environment

No more than two layers of different lithology, lying horizontally or slightly obliquely (slope no more than 0.1). The thickness is sustained along the strike. An insignificant degree of heterogeneity of layers in terms of soil properties, irregularly changing in plan and depth. Rocky soils lie from the surface or are covered by a thin layer of non-rocky soils.

No more than four layers of different lithology, inclined or pinched out. Power changes naturally. A significant change in the characteristics of soil properties in plan or in depth. Rocky soils have an uneven roof and are covered with non-rocky soils.

More than four layers of different lithology. The power changes dramatically. Lenticular bedding of layers. A significant degree of heterogeneity in terms of soil properties, changing in plan or depth. Rocky soils have a highly dissected roof and are covered with non-rocky soils. There are faults of various orders.

Hydrogeological in the field of interaction of buildings and structures with the geological environment

Groundwater is absent or there is one consistent groundwater horizon with a homogeneous chemical composition.

Two or more sustained horizons of groundwater, in places with a heterogeneous chemical composition or having a pressure and containing pollution.

Groundwater horizons are not consistent in strike and thickness, with a heterogeneous chemical composition or various pollution. In some places, there is a complex alternation of aquifers and water-resistant rocks. Groundwater heads and their hydraulic connections vary along the strike.

Geological and engineering-geological processes that negatively affect the conditions of construction and operation of buildings and structures

None.

Specific soils in the field of interaction of buildings and structures with the geological environment

None.

They are of limited distribution and (or) do not have a significant impact on the choice of design solutions, construction and operation of facilities.

They are widespread and (or) have a decisive influence on the choice of design solutions, construction and operation of facilities.

Technogenic impacts and changes in developed territories

Insignificant and may not be taken into account in engineering and geological surveys and design.

They do not have a significant impact on the choice of design solutions and the conduct of engineering and geological surveys.

They have a significant impact on the choice of design solutions and complicate the production of geotechnical surveys in terms of increasing their composition and scope of work.

Notes: 1. The category of complexity of geotechnical conditions should be established by a combination of factors. If any single factor belongs to a higher category of complexity and is decisive in making the main design decisions, then the category of complexity should be established by this factor.

Category I. - Areas with uniform soil cover; soil complexes occupy no more than 15% of the area; swamps, wetlands and saline soils occupy no more than 5% of the area (mainly steppe regions).

II category. - Areas with heterogeneous soil cover; diverse soil-forming rocks, variable vegetation and dissected relief; soil complexes occupy up to 30% of the territory; swamps and wetlands occupy no more than 20% of the area (mainly forest-steppe and steppe regions).

III category. - Areas with a very heterogeneous soil cover: the spread of rocky, pebble and gravelly soils; swamps, wetlands and saline lands occupy more than 20% of the area (deserts, semi-deserts, dry steppes, forest areas, forest-tundra, tundra, floodplains, floodplains and deltas).

3. Prices for field work take into account the following terrain passability conditions.

Table 8

Cross-country characteristics

I (good)

Slightly dissected or hilly terrain, river valleys and gullies are well traversed. The road network is well developed

II (satisfactory)

Rugged relief with relative elevations up to 500 m with slope steepness up to 20 °. Forested plain areas, slightly wetlands. The road network is poorly developed.

III (bad)

Mountainous relief without glaciers and hard-to-reach rocky ridges with relative elevations of more than 500 m and a steepness of slopes over 20 °. The network of ravines, drains, irrigation and reclamation networks is intensively developed. The territories are highly swampy, taiga, tundra, saline, desert with semi-fixed sand.

Note - The cost of field work carried out on the territory of mountainous regions with rugged serrated and rocky ridges and glaciers, peaked peaks, dangerous passes, turbulent mountain rivers, as well as in desert areas with loose sands and dunes, may be determined by actual costs in prices of the current period.

4. Prices are not taken into account and are additionally determined according to the corresponding tables of this Handbook the costs of drilling wells with a portable drilling kit, digging holes, drilling holes, as well as taking monoliths and samples for analysis for contamination by chemical and bacteriological indicators.

Chapter 1. Engineering-geological,

hydrogeological engineering and environmental engineering

reconnaissance (route) survey

1. This chapter provides basic prices for engineering-geological, engineering-hydrogeological, engineering-ecological and soil reconnaissance (route) survey.

2. Prices include the costs of the following works.

Field work: inspection of the survey site, adjacent territory, visual assessment of the relief, production of a complex of geological, geomorphological, hydrogeological, ecological and soil observations along the selected route (keeping field records), side routes for visual inspection, collection of questionnaires, clarification of the conditions for the production of surveys.

Cameral work: preliminary acquaintance with the work area on the map, selection of route directions, processing and systematization of entries in field diaries, systematization of survey data, compilation of a catalog of survey points and a schematic geotechnical (hydrogeological, ecological, soil) map of the surveyed territory on an optimal scale, allocation of sites for more detailed research, registration of materials in conjunction with the data of pre-field interpretation, preparation of an explanatory note (conclusion).

3. Prices for a reconnaissance survey are shown in table 9.

Gauge - 1 km of route Table 9

Name of works

Engineering-geological, hydrogeological reconnaissance at passability:

good

18,3

13,5

23,3

18,5

28,3

23,4

satisfactory

20,4

13,5

27,0

18,5

36,0

23,4

bad

28,5

13,5

37,6

18,5

47,2

23,4

Reconnaissance soil survey with patency:

good

2,57

1,27

3,24

1,69

4,96

2,41

satisfactory

State Committee of the Russian Federation
on housing and construction policy
(Gosstroy of Russia)

Reference price reference

for geotechnical and
environmental engineering
surveys for construction

(prices are adjusted to the base level as of 01.01.1991)

Moscow 1999

DEVELOPED by the Industrial and Research Institute for Engineering Surveys in Construction (PNIIIS), JSC Institute Hydroproject, SPC Ingeodin, with the participation of the Committee for Architecture and Urban Planning of the Krasnodar Territory, Research Institute of Building Physics of the Russian Academy of Architecture and Construction Sciences.

INTRODUCED by the Department for the Development of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia

APPROVED by the State Committee of the Russian Federation for Housing and Construction Policy (letter dated June 22, 1998, No. 9-4 / 84).

ACCEPTED AND PUT INTO ACTION from 01.01.1999

Replaces Chapters 12, 14, 15 and Table 198, Chapter 17 of the Capital Construction Survey Prices, 1982; Reference book of base prices for laboratory geotechnical works, 1996; Reference book of base prices for drilling works in engineering and geological surveys for construction, 1997; Handbook of basic prices for cameral engineering and geological works, 1997

GENERAL INSTRUCTIONS

PART I. BASIC PRICES FOR RECONSTRUCTION (ROUTE) SURVEY AND ROUTE OBSERVATIONS

General Provisions

Chapter 1. Engineering-geological, engineering-hydrogeological and engineering-ecological reconnaissance (route) survey

Chapter 2. Route observations carried out in the preparation of engineering-geological, engineering-hydrogeological and engineering-ecological maps of scales 1: 50,000 - 1: 500

PART II. BASIC PRICES FOR DRILLING WORKS

General Provisions

Chapter 3. Manual drilling and drilling with portable drilling rigs

Chapter 4. Core drilling

Chapter 5. Mechanical percussion-rope drilling

Chapter 6. Auger drilling of wells and pits

Chapter 7. Vibration drilling

Chapter 8. Backflush drilling

PART III. BASIC PRICES FOR MINING WORKS

General Provisions

Chapter 9. Driving of open mine workings

Chapter 10. Driving underground mine workings

Chapter 11. Accompanying work when driving mine workings

PART IV. BASIC PRICES FOR EXPERIMENTAL FILTERING WORKS AND STATIONARY OBSERVATIONS

General Provisions

Chapter 12. Experimental filtration work

Chapter 13. Stationary observations

Chapter 14. Related work

PART V. SOIL FIELD SURVEY AND SAMPLING

Chapter 15. Field studies of soils

Chapter 16. Sampling

PART VI. BASIC PRICES FOR LABORATORY WORKS AND RESEARCH

General Provisions

Chapter 17. Single definitions and integrated studies (tests) of physical and mechanical properties of soils (rocks)

Chapter 18. Single definitions complex studies of the chemical composition of soils (soils) and water

Chapter 19. Single definitions and comprehensive studies of the physical and mechanical properties of soil building materials

PART VII. BASIC PRICES FOR CAMERAL WORKS

General Provisions

Chapter 20. Pre-field office work

Chapter 21. Office processing of field and laboratory work materials

Chapter 22. Drawing up a technical report (conclusion) on the results of the work performed

PART VIII. BASIC PRICES FOR DIFFERENT WORKS AND SERVICES

Chapter 23. Geotechnical control and documentation of construction excavations

Chapter 24. Radiometric work

Chapter 25. Geodetic works

Chapter 26. Land reclamation

Chapter 27. Registration of survey work and acceptance of engineering survey materials

Chapter 28. Supporting work

Appendix 1. Coefficients to prices for engineering surveys carried out in desert and waterless areas *)

Appendix 2. Duration of an unfavorable period of the year for the production of field engineering surveys

Appendix 3. Regional coefficients to the wages of employees of design and survey organizations (except for survey expeditions, parties and detachments) *)

Appendix 4. Regional coefficients to the wages of workers of prospecting expeditions, parties and detachments *)

Appendix 5. List of regions of the Far North and localities equated to regions of the Far North *)

GENERAL INSTRUCTIONS

1. Reference book of base prices for engineering-geological and engineering-environmental surveys for construction (hereinafter referred to as the "Reference") is recommended for determining the base cost of engineering-geological and engineering-environmental surveys, surveys of ground construction materials and water supply sources based on groundwater at formation of prices in agreements (contracts).

2. This Handbook is intended for use by enterprises (organizations) of various organizational and legal forms that carry out survey work and have a license to carry it out.

Reconnaissance (route) survey and route observations;

Drilling works;

Mining works;

Experimental filtration works, field studies of soils and sampling;

Laboratory work and research;

Cameral work;

Various works and services;

Ancillary work.

4. Prices are calculated on the basis of the official salaries of engineering and technical workers, wage rates of workers, the cost of materials and services, depreciation rates for fixed assets as of 01.01.91, taking into account the main provisions on the composition of costs included in the cost of products (works, services) with the changes and additions provided for by the Decree of the Government of the Russian Federation dated 01.07.95 No. 661.

5. Prices are calculated in accordance with the composition, volume and technology of production of field and office work, ensuring the creation of reporting documentation that meets the requirements of GOSTs and current regulatory documents (approved or agreed by the Gosstroy of Russia), and are optimal for determining the cost of these works.

The prices for field work are provided for the performance of these works in expeditionary conditions, i.e. with the payment of travel or field allowances to workers.

Prices for office processing of survey materials and laboratory work are provided for their implementation in a hospital, i.e. without payment of travel allowances or field allowances to workers.

6. Prices are given in rubles and for certain types of work are given as a fraction: above the line - the price of field work, below the line - the price of office work. In other cases, prices are provided separately for field and office work.

Primary processing of survey materials, carried out in expeditionary conditions, is taken into account in the prices for field work. The prices also include the costs of:

a) obtaining a technical assignment for the production of surveys;

b) agreement with the customer of the program (prescription) of surveys and preparation of contractual documentation;

c) preparation, verification of instruments, instruments, equipment and metrological assurance of the unity and accuracy of measuring instruments;

d) internal control and acceptance of survey materials;

e) delivery of survey materials to the customer.

7. Prices are not taken into account and are determined additionally according to the corresponding tables (standards) of this Handbook and the following costs are provided in the estimates:

a) inland transport;

b) external transport;

c) organization and liquidation of works at the facility;

d) selection of monoliths, bulk samples and samples for analysis for contamination by chemical and bacteriological indicators;

e) drawing up and agreeing with the customer a survey program (prescription), as well as drawing up and issuing a technical report (conclusion) to the customer;

f) preparation and delivery of intermediate engineering survey materials to the customer;

g) various auxiliary work (geotechnical control, radiometric work, geodetic work, etc.);

h) registration of permits (registration) for the production of engineering surveys;

i) land reclamation;

k) installation, dismantling and maintenance (rent) of special survey equipment.

8. Prices are calculated for the conditions for the production of surveys in the middle zone of the European part of the Russian Federation (in terms of wages), a favorable period of the year and a normal regime for conducting survey works.

When determining the estimated cost of surveys carried out in other regions of the Russian Federation, as well as in an unfavorable period of the year, the corresponding coefficients are applied to the prices:

a) when performing surveys in mountainous and high-mountainous regions, the coefficients given in Table 1 are applied to the prices.

Table 1

b) when performing surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys;

c) when performing surveys in territories with a special regime, a coefficient of 1.25 is applied to the prices for field work, and in areas with radioactivity of more than 1 m 3 per year or 0.1 rem / year - a coefficient from 1.25 to 1.5 depending on the level of radioactivity, assessed in accordance with the Radiation Safety Standards NRB-96 (GN 2.6.1.054-96).

Note - Territories with a special regime include areas and areas where, according to the situation or the established regime, interruptions or difficulties associated with the loss of working time during surveys are inevitable: border areas, landfills, airfields, construction sites where blasting operations are carried out, areas with strong dusty air (construction sites, quarries, etc.), environmentally harmful areas, internal areas of explosive, harmful and hot workshops of enterprises of the defense, chemical, metallurgical, coal and mining industries, operating power plants and substations, open switchgears of power plants, strips with a width of up to 200 m of existing power transmission lines with a voltage of 500 kV. and higher. The canvas of railways and highways, main streets (avenues) of cities, the territory of railway stations, ports, etc., where delays and interruptions in work caused by heavy traffic, etc. are inevitable.

d) when performing field survey work in an unfavorable period of the year in the relevant areas (according to Appendix 2), the coefficients given in Table 2 are applied to their cost.

table 2

Duration of the unfavorable period, months:

Coefficient

e) when performing surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3, 4) or in accordance with the resolution of the Council of Ministers of the RSFSR dated 04.02.91, No. 76, republican, regional, regional, etc. regional coefficients have been established by government or administrative authorities for the wages of workers engaged in surveys; the coefficients shown in Table 3 are applied to the total estimated cost of these surveys.

Table 3

Regional coefficient to wages

Coefficient to the total of the estimated cost of surveys

Note - When new regional coefficients to wages are introduced after 07/01/98 in a legislative or directive manner, the coefficients to the total of the estimated cost of surveys are determined in accordance with Table 3.

c) when conducting surveys by organizations making payments related to the provision of benefits to persons working in the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of the survey :

1.50 - when performing surveys in the Far North;

1.25 - the same in areas equated to the regions of the Far North;

1.15 - in the southern regions of the Irkutsk region, the Krasnoyarsk region and the Far East (Amur region, Primorsky and Khabarovsk regions), in the Arkhangelsk and Chita regions, the Republics of Buryatia, Karelia, Komi (except for the regions of the Far North and areas equated to the regions of the Extreme North).

Note - With the simultaneous application of the coefficients specified in subparagraphs "e" and "f" of paragraph 8, the total multiplying coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients of Table 3 and subparagraph "e".

9. Expenses for inland transport are determined according to Table 4 as a percentage of the estimated cost of field exploration work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions), including expenses for the maintenance of bases, radio stations, as well as installation, dismantling and maintenance of prospecting equipment, determined according to tables 100 and 101.

Table 4

Distance from the base of the survey organization, expedition, party or detachment to the survey site, km:

Internal transport costs,%, with the estimated cost of field survey work, thousand rubles

St. 5 to 10

St. 10 to 20

St. 20 to 50

- "- 10 -" - 15

- "- 15 -" - 20

- "- 20 -" - 25

Notes: 1. The costs of inland transport can be determined by actual costs in the prices of the current period:

a) with an estimated cost of field survey work up to 5 thousand rubles;

b) when the survey site is removed from the base of the survey organization, expedition, party or detachment at a distance of more than 25 km;

c) when performing field survey work in the regions of the Far North and equivalent areas, in sparsely populated (uninhabited) areas (alpine, desert, taiga, tundra), when the survey site is removed from the base of a survey organization, expedition, party or detachment at a distance of up to 25 km;

d) related to the rental and maintenance of special vehicles - airplanes, helicopters, all-terrain vehicles, boats, barges, longboats, reindeer and dog teams, camels, horse packs, etc.

2. In the case of determining costs in the prices of the current period, the standards of Table 4 are not applied.

10. Expenses for external transport associated with the travel of workers and transportation of survey equipment and cargo from the permanent location of the organization performing the survey to the base of the survey expedition, party or detachment (or to the survey site) and vice versa, are determined according to Table 5 as a percentage of the estimated the cost of field exploration work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions), including the costs of inland transport, determined according to table 4 (excluding the costs provided for in note 1 of table 4), as well as the costs of maintenance of bases and radio stations, installation, dismantling and maintenance of survey equipment, determined according to tables 100 and 101.

Table 5

Distance of travel and transportation in one direction, km:

Expenses for external transport in both directions,% of the estimated cost of surveys carried out in expeditionary conditions, duration, months.

12 and more

St. 25 to 100

- "- 100 -" - 300

- "- 300 -" - 500

- "- 500 -" - 1000

- "- 1000 -" - 2000

Notes: 1. Costs for external transport at distances up to 25 km are not included in the estimates.

2. When performing certain types of surveys costing up to 5 thousand rubles. or the presence of unfavorable conditions for the passage of workers and the carriage of goods to hard-to-reach areas of research and back, the costs of external transport can be determined based on actual costs in prices of the current period.

3. Expenses for external transport in executive estimates may be determined in prices of the current period.

4. In the case of determining costs in the prices of the current period, the standards of Table 5 are not applied.

11. When carrying out surveys in especially difficult natural conditions (on the polar islands, in the glacier zone, in the alpine, desert, taiga and tundra regions), special events (attraction of mountaineering instructors and guides, organization of a rescue service, etc.) may be envisaged. additional costs, which are determined by the actual costs in the prices of the current period.

12. Determined by actual costs (price lists, tariffs, invoices, etc.) in the prices of the current period and additionally taken into account in the cost of surveys costs associated with:

Obtaining (acquisition) of initial data and information about natural conditions, aerial photography, cartographic and other materials of surveys of past years;

Carrying out the necessary approvals related to the production of certain types of field work (location of mine workings, boreholes, points of experimental work, etc.);

The production of special types of analyzes and studies of soil and soil samples, bottom sediments, surface and ground waters of snow and ice, performed by specialized laboratories licensed to carry out such work (bacteriological analysis, complete tests of aggregates in concrete, radiochemistry of isotopes, etc.) ;

Payment for the cost of casing pipes, filter strings and other materials left in wells during water drilling and for stationary observations;

By purchasing a logging ticket; compensation for material damage associated with deforestation during surveys;

Compensation to land users for material damage caused in connection with losses and surveys on their land plots;

Payment for the services of third-party organizations required for the production of surveys.

13. The costs of organizing and eliminating work at the facility are determined at the rate of 6% of the estimated cost of field survey work, taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions, including the costs of inland transport, determined according to table 4 , (except for the costs provided for in Note 1 of Table 4), as well as the costs for the maintenance of bases and radio stations, installation, dismantling and maintenance of prospecting equipment, determined according to Tables 100 and 101.

Notes: 1. The following coefficients are applied to the amount of expenses for the organization and liquidation of works, determined in clause 13:

2.5 - for surveys with an estimated cost of up to 2 thousand rubles. or during surveys (regardless of their cost) carried out in the regions of the Far North and equivalent areas, as well as in sparsely populated (uninhabited) areas (alpine, desert, taiga and tundra);

2.0 - for surveys with an estimated cost of more than 2 to 5 thousand rubles;

1.5 - the same, over 5 to 10 thousand rubles.

2. When performing field surveys at the facility continuously for more than one year, the coefficients given in Table 6 should be applied to the costs of organizing and eliminating works.

Table 6

14. When carrying out field work without paying workers travel allowances or field allowances, a coefficient of 0.85 should be applied to the prices for these works.

When performing office processing of survey materials and performing laboratory work in expeditionary conditions (with payment of field allowances or travel expenses), a coefficient of 1.15 is applied to the prices for these works.

15. If it is necessary to issue intermediate survey materials to the customer (if it is provided for by the terms of reference, the program), a coefficient of 1.1 is applied to the cost of these surveys (except for the costs specified in clauses 9-13).

16. When applied to prices (cost) of several coefficients established by the Directory, the latter are multiplied (except for the coefficients of sub-clauses "e" and "f" of clause 8).

17. The estimate attached to the contract provides for additional costs for work and services listed in clause 12 of the General Instructions, as well as unforeseen costs associated with plugging wells, construction of temporary buildings and structures (foundations for tents, crossings over ditches and ditches, installation of stairs on steep slopes, sheds, courtyard latrines, berths for boats and boats, etc.) in the amount of at least 10% of the estimated cost of survey work.

18. The prices of this Handbook are given to the average cost level as of 01.01.91. Bringing the base cost of engineering surveys to the price level of the current period is carried out by applying the inflation index to this cost, which is determined in accordance with the established procedure.

19. The inflation index is not applied to the costs determined by actual costs. Costs that are priced in the current period are included in a separate estimate.

PROJECT

OJSC "P N I I S"

Open Joint Stock Company "Production and Research Institute for Research

in construction "

Reference price reference

for engineering surveys for construction.

Geotechnical and

environmental engineering surveys

(prices are adjusted to the base level as of 01.01.2001)

Moscow 2011

UDC 624.131.3.003.13: 338.5 (083.78)

Reference book of basic prices for engineering surveys for construction.Engineering-geological and engineering-ecological surveys/ -M., PNIIIS, 2008, 230 pages.

DEVELOPED by the Industrial and Scientific Research Institute for Engineering Surveys in Construction (OJSC PNIIIS), taking into account the proposals of the State Unitary Enterprise Mosgorgeotrest, OJSC Fundamentproekt, LLC NIIOSP, CJSC NiPI eg, etc.

REPLACE the Directory of basic prices for engineering surveys for construction. Engineering-geological and engineering-ecological surveys, 1999

Responsible editors - Ph.D. n. M.I. Bogdanov and head. the pricing sector S.I. Rykhlova (JSC "PNIIIS").

This document may not be reproduced in whole or in part,replicated and distributed without the permission of JSC "PNIIIS".

ISBN © JSC "PNIIIS", 2011

GENERAL INSTRUCTIONS 5

PART I. BASIC PRICES FOR RECONSTRUCTION (ROUTE) SURVEY AND ROUTE OBSERVATIONS 17

General 17

Chapter 1. Engineering-geological, engineering-hydrogeological, engineering-geocryological and engineering-ecological reconnaissance (route) survey 20

Chapter 2. Route observations performed to compile engineering-geological, engineering-hydrogeological, engineering-geocryological, engineering-ecological and soil maps of scales 1: 50,000 - 1: 500 22

PART II. BASIC PRICES FOR DRILLING WORKS 24

General provisions 24

Chapter 5. Mechanical percussion wireline drilling 37

Chapter 6. Self-propelled auger drilling of wells and boreholes and small-sized portable drilling 41

installations. 41

Chapter 7. Vibration drilling 46

Chapter 8. Backflush Drilling 48

PART III. BASIC PRICES FOR MINING WORKS 50

General provisions 50

Chapter 9. Driving open-pit mine workings 54

Chapter 10. Driving underground mine workings 55

Chapter 11. Accompanying work during mining
workings 58

PART IV. BASIC PRICES FOR PILOT-FILTERING WORKS AND STATIONARY OBSERVATIONS 63

General provisions 63

Chapter 12. Experimental filtration work 64

Chapter 13. Stationary observations 67

Chapter 14. Related Work 71

PART V. BASIC PRICES FOR SOIL FIELD SURVEY AND SAMPLING 73

Chapter 15. Field research of soils 73

Chapter 16. Sampling 84

PART VI. BASIC PRICES FOR GEOPHYSICAL WORKS 88

General provisions 88

Chapter 17. Seismic survey and seismic acoustics 92

Chapter 18. Electrical Prospecting 101

Chapter 19. Magnetic prospecting 116

Chapter 20. Engraving 117

Chapter 21. Seismic microzoning 118

Chapter 22. Geophysical surveys in wells 120

Chapter 23. Determination of the corrosiveness of soils 122

and the intensity of stray currents 122

Chapter 24. Inspection of building structures 123

geophysical methods 123

PART VII. BASIC PRICES FOR LABORATORY WORKS AND RESEARCH 125

General provisions 125

Chapter 25. Single definitions and integrated studies (tests) of physical and mechanical properties of soils (rocks) 126

Chapter 26. Single definitions and integrated studies of the chemical composition of soils (soils) and water 148

Chapter 27. Single definitions and complex definitions 161

research of physical and mechanical properties of soil building materials 161

Chapter 28. Petrographic and lithological studies 168

PART VIII. BASIC PRICES FOR CAMERAL WORKS 174

General Provisions 174

Chapter 29. Pre-field office work 174

Chapter 30. Office processing of materials 179

field geotechnical, geophysical and 179

laboratory works 179

Chapter 31. Drawing up a technical report (conclusion) 187

on the results of the work performed 187

PART IX. BASIC PRICES FOR DIFFERENT WORKS AND SERVICES 188

Chapter 32. Geotechnical control and documentation 188

construction excavations 188

Chapter 33. Radiometric work 191

Chapter 34. Geodetic works 193

Chapter 35. Land reclamation 199

Chapter 36. Registration of survey works and acceptance 200

engineering survey materials 200

Chapter 37. Supporting work 202

Appendix 1. Coefficients to prices for engineering surveys carried out in desert and waterless areas) 209

Appendix 2. Duration of an unfavorable period of the year for the production of field engineering surveys) 212

Appendix 3. Regional coefficients to the wages of employees of design and survey organizations (except for survey expeditions, parties and detachments)) 218

Appendix 4. Regional coefficients to the wages of workers of prospecting expeditions, parties and detachments) 223

Appendix 5. List of regions of the Far North and localities equated to regions of the Far North) 228

GENERAL INSTRUCTIONS

1. “Reference book of basic prices for engineering surveys for construction. Engineering-geological and engineering-ecological surveys "(hereinafter referred to as the" Handbook ") is recommended for determining the base cost of engineering-geological and engineering-ecological surveys, surveys of ground construction materials and water supply sources based on groundwater, as well as hydrogeological and geophysical works at formation of prices in agreements (contracts).

2 ... This Handbook is intended for use by enterprises (organizations), regardless of departmental affiliation and organizational and legal forms:

Executors of survey work for construction, who, in accordance with the established procedure, have been granted the right to conduct them;

Customers of survey work;

Bodies supervising the implementation of survey work.

3 ... The reference book contains basic prices (hereinafter "Prices") for:

Reconnaissance (route) survey and route observations;

Drilling works;

Mining works;

Experimental filtration works;

Field studies of soils and sampling;

Stationary observations;

Geophysical works;

Laboratory work and research;

Cameral work;

Various works and services;

Ancillary work.

4. Prices are calculated at the level of the estimated normative base as of 01.01.2001 according to the terms of remuneration of engineers and technical workers and workers, the cost of materials and services, as well as the amount of depreciation deductions for fixed assets, in accordance with the "Methodological Recommendations for the Composition and Accounting of Costs included in the cost of design and survey products (works, services) for construction and the formation of financial results ", approved by the Gosstroy of Russia by letter of 06.04.1994, No. BE-19-10 / 9, taking into account the changes and additions provided for by the decree of the Government of the Russian Federation dated 01.07.1995, No. 661.

5. Prices are calculated in accordance with the composition and modern technology of production of field, laboratory and office survey work, taking into account the requirements of the regulatory documents in force as of 01.01.2001, and are optimal for determining the cost of these works. Prices include overhead costs, planned savings, social deductions.

Prices for field work are provided for their performance in expeditionary conditions with payment of travel or field allowances to workers.

Prices for office processing of survey materials and laboratory work are provided for their implementation in a hospital, i.e. without payment of travel allowances or field allowances to workers.

6. Prices are given in rubles and for certain types of work are given as a fraction: above the line - the price of field work, below the line - the price of office work. In other cases, prices are provided separately for field and office work.

Primary processing of survey materials, carried out in expeditionary conditions, is taken into account in the prices for field work.

The prices also include the costs of:

a) obtaining a technical assignment for the production of surveys;

b) preparation of contractual documentation;

c) preparation, verification of instruments, instruments, equipment and metrological assurance of the unity and accuracy of measuring instruments;

d) current repair of equipment and tools;

e) loading and unloading equipment and tools when moving around the work site;

f) internal quality control and acceptance of survey work;

g) issuance of survey reports in 4 copies, including 2 copies for the customer and one copy for the authority that issued the permit for the survey or carried out their registration; when issuing additional copies of reporting materials to the customer under the terms of the agreement, 3% of the cost of drawing up reporting materials is charged for each copy.

h) submission of survey materials to the customer, as well as, in accordance with the established procedure, to the authorities that issued a permit for surveys or carried out their registration;

i) transferring stationary observation points (wells, piezometers, etc.) to the customer and issuing an acceptance certificate.

7. The prices do not include and are determined additionally according to the corresponding tables (standards) of this Handbook, the costs of:

a) inland transport;

b) external transport;

c) organization and liquidation of works at the facility;

d) selection of monoliths, bulk samples and samples for analysis for contamination by chemical and bacteriological indicators;

e) drawing up and agreeing with the customer a survey program, as well as drawing up a technical report (conclusion);

g) preparation and delivery of intermediate engineering survey materials to the customer;

h) various auxiliary works (geodetic works, land reclamation, etc.);

i) issuance, on behalf of the customer, of permits (registration) for the production of engineering surveys by the forces of the organization performing the surveys;

j) installation, dismantling and maintenance of special survey equipment and special vehicles;

m) deforestation and uprooting stumps;

m) supervision (methodological guidance) of works transferred for performance by subcontractors.

8. The prices are calculated for the conditions of production of surveys in the middle zone of the European part of the Russian Federation (in terms of wages), a favorable period of the year and a normal regime for conducting survey works.

When determining the estimated cost of surveys carried out in other regions of the Russian Federation, under a special regime, as well as in an unfavorable period of the year, the corresponding coefficients are applied to prices:

a) when performing surveys in mountainous and high-mountainous regions, the coefficients given in Table 1 are applied to the prices.

Table 1

District name

Coefficient

Mountain and alpine with absolute heights of the surface of the site above sea level, m:

from 1500 to 1700

over 1700 "2000

b) when performing surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys;

c) when performing surveys:

In territories with a special regime, a coefficient of 1.25 is applied to the prices for field work;

In areas with radioactivity more than 1 mSv / year or 0.1 rem / year - coefficient from 1.25 to 1.5 depending on the level of radioactivity, assessed in accordance with the Radiation Safety Standards NRB-99 (GN 2.6.1.758-99) ;

At night (from 10 pm to 6 am) a coefficient of 1.35 is applied to the cost of field work;

At night, in territories with a special regime, located in areas with radioactivity of more than 1 mSv / year or 0.1 rem / year, the corresponding coefficients are multiplied.

On transit main and ring roads and main streets of city-wide significance with continuous traffic, a coefficient of 1.5 is applied to the prices for field work;

In a strictly limited period of time, no more than 4 hours per shift, that is, when "working through the window", a coefficient of 1.75 is applied to the cost of field work;

Note Territories (water areas) with a special regime include areas and areas where, according to the situation or the established regime, interruptions or difficulties associated with the loss of working time during surveys are inevitable: border areas, test ranges, airfields, sites where blasting operations are carried out, areas with a strong dustiness of the air, existing construction sites, pits, quarries; environmentally harmful territories and enterprises, territories of explosive, harmful and hot workshops, territories of defense, chemical, petrochemical, metallurgical, coal and mining industries, oil and gas pumping stations of main pipelines, high-security enterprises, power plants and substations, open switchgears of power plants , strips up to 200 m wide along existing power transmission lines with a voltage of 500 kV. and higher. The canvas of railways and highways, main streets (avenues) of cities, as well as streets and boulevards of large cities and megalopolises, technical zones of operating subways, the territory of railway stations, ports, backwaters, etc., where delays and interruptions in work caused by heavy traffic are inevitable transport, congestion of ships, etc.

d) when performing field exploration work, including auxiliary (tables 152-156, excluding work performed in heated rooms), as well as office and laboratory work performed in a field camp during an unfavorable period of the year (according to Appendix 2), the coefficients are applied to their cost given in table 2.

table 2

Duration of adverse

period, month:

Coefficient

e) when performing surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3, 4) or in accordance with the resolution of the Council of Ministers of the RSFSR dated 04.02.91, No. 76, republican, regional, regional, etc. regional coefficients have been established by government or administrative authorities for the wages of workers engaged in surveys; the coefficients shown in Table 3 are applied to the total estimated cost of these surveys.

Table 3

Regional coefficient to wages

Coefficient to the total of the estimated cost of surveys

Note. When new regional coefficients to the wages of workers employed in exploration work are introduced after 01.01.01 in a legislative or directive manner, the coefficients to the total of the estimated cost of surveys are determined in accordance with Table 3.

f) when conducting surveys by organizations making payments related to the provision of benefits to persons working in the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of the survey :

1.50 - when performing surveys in the Far North;

1.25 - the same in areas equated to the regions of the Far North;

1.15 - the same in the southern regions of the Irkutsk region, the Krasnoyarsk region and the Far East (Amur region, Primorsky and Khabarovsk regions), in the Arkhangelsk and Chita regions, the Republics of Buryatia, Karelia, Komi (except for the regions of the Far North and areas equated to regions of the Far North).

Note With the simultaneous application of the coefficients specified in subparagraphs "e" and "f" of paragraph 8, the total multiplying coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients of Table 3 and subparagraph "e".

9 ... Inland transport costs associated with the transportation of surveyors, equipment and materials from the location of the survey organization (expedition, party, detachment) to the survey site and back, and directly at the site of work are determined according to Table 4 as a percentage of the estimated cost of field survey work (main and auxiliary), as well as desk and laboratory work performed in a field camp (taking into account the coefficients given in subparagraphs 8 "a", "b", "c", "d" of the General Instructions), including the costs of maintaining the survey bases, radio stations, as well as the installation, dismantling and maintenance of survey equipment, determined at the prices of tables 152 and 153.

Table 4

Distance from the base of the survey organization (expedition, party or detachment) to the survey site, km

Inland transport costs,%, with the estimated cost of field

exploration works, thousand rubles