Repair of turnkey townhouses. How much does a townhouse renovation cost? Example of an estimate for a townhouse renovation
The question of the price of the upcoming work is important for most owners of houses and apartments who plan to freshen up the interior a little or carry out major work. When contacting a contractor, customers are primarily interested in the cost of upcoming events, and after the visit of the foreman they cannot wait for an estimate for repairs. This document usually forms the basis of the contract for the client to work with the contractor and allows the homeowner to control their budget.
What issues does the repair estimate solve?
Until now, some owners of apartments and private houses outside the city decide to do the finishing on their own. Many of them already have relevant experience, so they get down to business without much hesitation. In fairness, it must be said that they succeed in some simple events without much difficulty. However, when it comes to overhaul and finishing of turnkey cottages, a number of difficulties arise here.
Firstly, the owners of private housing have to worry not only about the interior decoration of estates, but also about the external state of buildings. Foundations, facades and roofs also suffer from normal wear and tear and require constant attention. Secondly, due to the large area of objects, it usually takes a lot of time to return to their proper appearance, which is not too much for most modern people. In such cases, the best solution would be cooperation with Rego-remont26. Experts will come to your home and conduct a professional inspection of all components of the object in order to identify all problem areas. Perhaps you have a leaky roof covering or problems with thermal insulation in some part of the building - experts will definitely notice all this and much more, not allowing the house to collapse further. After the contractor's representatives complete this part of the work and listen to your wishes, they will be able to prepare an estimate for you, including the following data:
- a list of upcoming events (dismantling, leveling the walls, repairing the roof, etc.);
- consumption building materials and accessories;
- delivery costs of materials;
- other expenses.
Most likely, examples of such documents containing calculations for apartments or houses can be found on the contractor's website. Having studied them, it will be easier for you to navigate in numbers. However, do not forget that each case is individual.
What you need to know about the repair estimate
Many Internet users, before contacting a particular company, read reviews about it and study its website in detail. Of course, when you need turnkey renovation and finishing of cottages, it is worth taking the time to gather information. At the same time, many homeowners are trying to independently calculate, figuring out how much materials they will need, and how much they will have to pay for the services of the craftsmen. Unfortunately, in a number of cases, it is simply not possible to draw up an estimate for repairs without dismantling the finishing. In addition, without the appropriate knowledge, it can be quite difficult to determine even the elimination of visible damage, such as cracks in the foundation. Those wishing to calculate the costs usually go the following way:
- order interior design or prepare it yourself;
- select finishing materials;
- make measurements of premises, door and window openings, consider their area;
- using ready-made programs, the amount of materials required is calculated;
- the cost of the delivery of raw materials and the services of loaders are added to the amount received.
Practice shows that even such an approach to budgeting most often does not guarantee a reliable result. Therefore, already in the process of work, it turns out that some material is not enough, while another, on the contrary, was acquired from a large supply... Only professionals can definitely solve this issue. For example, the experts of the company Rego-remont26 will prepare for you a competent and accurate calculation, which will suit you from a financial point of view and will allow you to complete the finishing in a short time.
On our resource for construction and renovation, you will also find many useful and relevant tips for improving your home.
Price list, prices for estimates for repairs
Ceiling: prices for assembly work
Ceiling primer for 1 time | m2 | 35 |
Bonding the ceiling with a reinforcing mesh | m2 | 100 |
Leveling the ceiling up to 3 cm (plaster) | m2 | 300 |
Ceiling filler and sanding | m2 | 140 |
Ceiling rustic glue and putty (no guarantee) | r.m. | 150 |
Pasting the ceiling with wallpaper (non-woven, vinyl) | m2 | 120 |
Pasting the ceiling with wallpaper (paper wallpaper) | m2 | 160 |
Pasting the ceiling with fiberglass | m2 | 160 |
Ceiling painting 2 times | m2 | 182 |
Pasting the ceiling with textile wallpaper | m2 | 300 |
Pasting the ceiling with cork panels | m2 | 280 |
Pasting the ceiling with foam panels | m2 | 130 |
Installation of ceiling plinth | r.m. | 120 |
Painting the ceiling plinth by 2 times | r.m. | 120 |
Installation of "Armstrong" ceiling | m2 | 245 |
Installation of "Armstrong" mirror ceiling | m2 | 280 |
Installation of a ceiling from aluminum rails on a metal frame | m2 | 525 |
Ceiling clapboard | m2 | 330 |
Installation of a wooden corner on the ceiling | r.m. | 100 |
Varnishing the ceiling from the lining for 2 times with grinding | m2 | 200 |
Ceiling installation (GKL) 1 level | m2 | 400 |
Ceiling installation (gypsum plasterboard) level 2 | m2 | 500 |
Ceiling installation (gypsum plasterboard) level 3 and more | m2 | 600 |
Installation of heat and noise insulation on the ceiling | m2 | 100 |
The device of the box made of gypsum plasterboard on the metal frame ceiling | r.m. | 430 |
Priming of curved sidewalls for 1 time | r.m. | 35 |
Putty and sanding curved sidewalls | r.m | 245 |
Pasting curved sidewalls with wallpaper | r.m. | 120 |
Painting curved sidewalls 2 times | r.m. | 120 |
Installation of a perforated angle on curved surfaces | r.m. | 100 |
Installation of a perforated angle on straight surfaces | r.m. | 100 |
Ceiling molding putty | r.m. | 60 |
Polyurethane baguette primer up to 150mm wide. | r.m. | 35 |
Painting of polyurethane moldings up to 150mm wide. | r.m. | 120 |
Installation of a decorative element made of polyurethane. under the lamps (+ putty and polishing) | PC. | 300 |
Polyurethane baguette primer for lamps | PC. | 35 |
Painting a polyurethane baguette for lamps | PC. | 120 |
Installation of plastic panels with the manufacture of a frame | m2 | 330 |
Installation of Rack Ceilings | m2 | 525 |
Installation of stucco molding under the chandelier | PC. | from 350 |
Stretch ceilings glossy from: | 1m2 | 525 rbl |
Stretch ceilings matt from: | 1m2 | 350 rbl |
Stretch ceilings Starry sky | 1m2 | contract |
Walls: Installation work
Priming the walls for 1 time | m2 | 30 |
Wall treatment with concrete contact | m2 | 45 |
Curved Plaster Wall Plaster | m2 | 350 |
Bonding walls with reinforcing mesh | m2 | 120 |
Plaster (leveling the walls) | m2 | 330 |
Installation of a perforated corner | r.m. | 70 |
Wall putty (under the wallpaper in two layers) | m2 | 175 |
Sanding the walls | m2 | 70 |
Painting the walls of VA by 2 times | m2 | 120 |
Pasting walls with wallpaper (paper, vinyl) | m2 | 160 |
Pasting walls with wallpaper (flizilin) | m2 | 120 |
Pasting walls with wallpaper for painting | m2 | 120 |
Pasting walls with wallpaper in two levels | m2 | 120 |
Pasting walls with a wallpaper border | r.m. | 70 |
Pasting walls with textile wallpaper | m2 | from 245 |
Pasting walls with cork panels | m2 | 245 |
GKL partition device | m2 | from 280 |
GKL partition device in 2 layers | m2 | from 350 |
Laying of partitions from gypsum blocks, foam blocks | m2 | 500 |
Laying of curved partitions from gypsum blocks, foam blocks | m2 | negotiable |
Installation of noise insulation | m2 | 70 |
Partition masonry 1/2 brick | m2 | 420 |
Brick masonry | m3 | 210 |
Laying of partitions from glass blocks | m2 | negotiable |
Installation of gypsum board (gypsum plasterboard) on walls with glue knauff | m2 | 260 |
Installation of false walls from gypsum plasterboard on a metal frame | m2 | 245 |
Installation of PVC false walls on a metal frame | m2 | 280 |
Wall cladding | m2 | from 210 |
Antiseptic lining | m2 | 40 |
2x varnishing with sanding | m2 | 120 |
Wall cladding with PVC, MDF lathing | m2 | 140 |
Wall cladding with tiles | m2 | from 490 |
Wall cladding with tiles diagonally | m2 | from 595 |
Tiling the kitchen backsplash diagonally | m2 | from 595 |
Grouting tiles | m2 | 70 |
Installation of a ceramic border | r.m. | 105 |
Tile cut at 45 degrees | r.m. | 210 |
Wall cladding with mosaic | m2 | from 630 |
Wall cladding with 10 * 10 tiles | m2 | from 525 |
Installation of a plastic corner (external, internal) | r.m. | 100 |
Installation of a metal corner on a tile | r.m. | 105 |
Wall cladding with natural stone | m2 | 770 |
Wall cladding with decorative stone | m2 | 770 |
Application of "Venetian" plaster | m2 | negotiable |
Application of decorative plaster | m2 | from 420 |
GKL box device on metal frame | r.m. | 490 |
Box device from MSL | r.m. | 490 |
Priming the box for 1 time | r.m. | 30 |
Facing the box with tiles | r.m. | 490 |
Putty and sanding the box | r.m. | 200 |
Putty and sanding the box for painting | r.m. | 200 |
Pasting the box with wallpaper | r.m. | 120 |
Coloring the box 2 times | r.m. | 124 |
Sheathing of slopes with clapboard | r.m. | 375 |
Installation of PVC slopes | r.m. | 280 |
Installation of slopes from gypsum board | r.m. | 280 |
Slope plaster | r.m. | 280 |
Arched slopes plaster | r.m. | 375 |
Priming of slopes for 1 time | r.m. | 30 |
Putty and sanding of slopes | r.m. | 200 |
Putty and sanding of slopes for painting | r.m. | 200 |
Pasting slopes with wallpaper | r.m. | 120 |
Applying textured plaster | m2 | from 420 |
Coloring slopes 2 times | r.m. | 120 |
Facing slopes with tiles | r.m. | 525 |
Installation of wooden corners | r.m. | 100 |
Varnishing of wooden corners | r.m. | 120 |
Installation of a plastic corner | r.m. | 70 |
Mounting the mirror on the wall (with glue) | m2 | 420 |
Align corners | r.m. | 140 |
Leveling, adjoining (wall-to-floor, ceiling) | r.m. | 154 |
Painting of metal structures | m2 | 140 |
Priming of metal structures | m2 | 40 |
Waterproofing walls with mixtures | m2 | 140 |
Sealing seams with serpyanka and uniflot | r.m. | 35 |
Arrangement of walls from MDF panels | m2 | 350 |
Installation of walls from plastic panels | m2 | 315 |
Face masonry 1/2 brick | m2 | 630 |
Arrangement of niches in brickwork | m2 | 1400 |
Arrangement of niches in concrete | m2 | negotiable |
Column installation (p / y) | m. | 210 |
Putty, column painting (semi-finished) | m.p | 175 |
Wall cladding with imitation timber | m2 | 330 |
Priming of timber walls with a tinted wood preservative | m2 | 140 |
Painting of walls from a bar VA | m2 | 154 |
Notch walls | PC. | 65 |
Floor: prices for repair and installation work
Priming the floor for 1 time | 1m2 | 30 rbl |
Dry mortar waterproofing device | 1m2 | 190 rbl |
Screed device up to 3 cm | 1m2 | 265 rbl |
Screed reinforcement | 1m2 | 70 rbl |
Finishing floor leveling | 1m2 | 175 rbl |
Laying tiles on the floor | 1m2 | 560 rbl |
Laying ceramic skirting boards, curbs | r.m. | 105 rbl |
Mosaic masonry | 1m2 | 1000 rub |
Laying tiles diagonally on the floor | 1m2 | 665 rbl |
Laying PVC tiles on the floor | 1m2 | 210 rbl |
Floor cladding with natural stone | 1m2 | 700 rbl |
Facing steps with ceramic tiles | r.m. | 400 rbl |
Hardboard flooring | 1m2 | 105 rbl |
Broaching the old floor with self-tapping screws | 1m2 | 70 rbl |
Laying boards on logs | 1m2 | 350 rbl |
Sanding plank floors | 1m2 | 105 rbl |
Installation of knauf floors (expanded clay, EP) | 1m2 | 350 rbl |
Laying plywood on logs (one layer) | 1m2 | 130 rbl |
Laying plywood on logs (two layers) | 1m2 | 400 rbl |
Laying plywood on mastic on anchors | 1m2 | 245 rbl |
Antiseptic lag | 1m2 | 35 rbl |
Antiseptic treatment of plywood | 1m2 | 35 rbl |
Installation of sound insulation (mineral wool) | 1m2 | 70 rbl |
Filling noise and thermal insulation (expanded clay) up to 5 cm | 1m2 | RUB 60 |
Spillage with cement milk | 1m2 | 105 rbl |
Laying parquet boards (floating floor) | 1m2 | 320 rbl |
Laying parquet boards with glue | 1m2 | 490 rbl |
Laying laminate | 1m2 | 190 rbl |
Laying fiberboard on the floor | 1m2 | 105 rbl |
Laying chipboard on the floor | 1m2 | 105 rbl |
Laying cork panels | 1m2 | 210 rbl |
Linoleum flooring | 1m2 | 110 rbl |
Linoleum flooring (for glue) | 1m2 | 140 rbl |
Tiled linoleum flooring with welding seams | 1m2 | 385 rbl |
Carpet tile flooring | 1m2 | 315 rbl |
Carpet flooring | 1m2 | 140 rbl |
Carpet flooring with glue | 1m2 | 175 rbl |
Installation of plastic floor skirting boards | r.m. | 70 rbl |
Installation of wooden floor skirting boards | r.m | 105 rbl |
Installation of MDF skirting boards | r.m | 120 rbl |
Varnishing wooden skirting boards | r.m | 40 rbl |
Installation of a tiled nut | r.m | 105 rbl |
Installation of a nut | PC. | 105 rbl |
Floor painting | 1m2 | 140 rbl |
Floor covering with varnish | 1m2 | 120 rbl |
Installation of sheet GVL in two layers | 1m2 | 210 rbl |
Floor: parquet work |
||
Dismantling the skirting board | m | 30 rbl |
Dismantling plywood | 1m2 | RUB 65 |
Dismantling of flooring from panel parquet, parquet and laminated boards | 1m2 | 70 rbl |
Dismantling of block parquet floors | 1m2 | 175 rbl |
Dismantling a solid board | 1m2 | 210 rbl |
Cutting plywood into sheets 760x760 mm | 1m2 | 40 rbl |
Cutting plywood into sheets 625x625 mm | 1m2 | RUB 60 |
Cleaning the screed from glue | 1m2 | 130 rbl |
Cleaning the base from bitumen mastic | 1m2 | 420 rbl |
Facing cracks in a cement screed with a repair-putty mass | 1m2 | 80 rbl |
Base / plywood priming | 1m2 | 35 rbl |
Plywood gluing on t / z-isol. interlayer (concrete base) * | 1m2 | 180 rbl |
Plywood gluing on t / z-isol. interlayer (wooden base) * | 1m2 | 154 rbl |
Laying plywood on a concrete base with glue on top * | 1m2 | 174 rbl |
Laying 12 mm plywood on a concrete base with glue and screws * | 1m2 | 175 rbl |
Sanding plywood | 1m2 | 140 rbl |
Installation and fastening of the lag | 1m2 | 360 rbl |
Installation and fastening of the 2nd layer of the lag | 1m2 | 175 rbl |
Decking device (plywood 18mm) on logs | 1m2 | 130 rbl |
Laying plywood on a wooden base | 1m2 | 130 rbl |
Difficult leveling of plywood by deep sanding | 1m2 | 275 rbl |
Laying laminate flooring on a substrate (perpendicular to the wall) | 1m2 | 140 rbl |
Laying the laminate on a substrate (at an angle to the wall) | 1m2 | 175 rbl |
Laying cork on a substrate (perpendicular to the wall) | 1m2 | 175 rbl |
Laying cork on a substrate (at an angle to the wall) | 1m2 | 210 rbl |
Bonding cork (perpendicular to the wall) | 1m2 | 350 rbl |
Bonding cork (at an angle to the wall) | 1m2 | 420 rbl |
Bonding parquet boards to the base (perpendicular to the wall) | 1m2 | 245 rbl |
Bonding parquet boards to the base (at an angle to the wall) | 1m2 | 315 rbl |
Laying parquet boards on a substrate (perpendicular to the wall) | 1m2 | 210 rbl |
Laying parquet boards on a substrate (at an angle to the wall) | 1m2 | 245 rbl |
Laying of block parquet (Deck, tree, square) | 1m2 | 440 rbl |
Laying block parquet (envelope) | 1m2 | negotiable |
Laying piece parquet (Braid) | 1m2 | negotiable |
Installation of block parquet (Offset square) | 1m2 | negotiable |
Laying block parquet (Rhombus) | 1m2 | negotiable |
Installation of block parquet (square with a star) | 1m2 | negotiable |
Laying piece (mosaic) parquet (figure according to drawing) | 1m2 | negotiable |
Laying lacquered piece parquet (Deck, Christmas tree, Square) | 1m2 | negotiable |
Installation of block parquet of exotic species (Deck) | 1m2 | 490 rbl |
Installation of block parquet of eben, yarra (deck) | 1m2 | 630 rbl |
Installation of block parquet of Karelian birch (Deck) | 1m2 | 770 rbl |
Laying modular parquet | 1m2 | 790 rbl |
Laying solid boards | 1m2 | 525 rbl |
Laying lacquered / oiled solid wood planks | 1m2 | 560 rbl |
Laying varnished / oiled modular parquet |
1m2 | 700 rbl |
Laying solid decking boards |
1m2 | 595 rbl |
Parquet sanding and filling (including abrasives) |
1m2 | 315 rbl |
Removing old varnish, sanding and filling parquet |
1m2 | 330 rbl |
Removing old varnish, sanding parquet |
1m2 | 315 rbl |
Removing old paint, sanding parquet |
1m2 | 350 rbl |
Varnish application type 1 (1 coat of primer and 3 coat of mat varnish) |
1m2 | 175 rbl |
Varnish application type 1 (2 coats of primer and 3 coats of mat varnish) |
1m2 | 210 rbl |
Varnish application type 1 (2 layers of primer, 2 layers of mat. And 1 layer of semi-finished products) |
1m2 | 245 rbl |
Varnish application type 1 (2 layers of primer, 2 layers of mat. And 1 layer of glossy varnish) |
1m2 | 280 rbl |
Matting the existing varnish. whipping and applying one coat of varnish |
1m2 | 105 rbl |
BONA oil application |
1m2 | 175 rbl |
Application of oil-wax OSMO 2 layers | 1m2 | 175 rbl |
Non-beveled floor tinting with OSMO paint and application of OSMO oil-wax | 1m2 | 420 rbl |
Toning of beveled flooring with OSMO paint and application of OSMO oil-wax | 1m2 | 525 rbl |
Oil application BONA CARL "S Deck | 1m2 | 175 rbl |
Cork strip installation | m | 175 rbl |
Installation of a cork strip along the radius | m | 210 rbl |
Cork strip toning | m | 70 rbl |
Installing the cork expansion pad | m | 105 rbl |
Installing a curved cork compensation pad | m | 175 rbl |
Installation of hatches of the 1st type (insert of the finished hatch) | PC. | 420 rbl |
Installation of hatches type 2 (insert of the finished hatch and finish of the hatch cover) | PC. | 640 rbl |
Installation of hatches type 3 (manufacturing and insertion of a hatch with a hatch cover finish) | PC. | RUB 1,750 |
Sealing the wall gap | m | 105 rbl |
Installation of skirting boards up to 69 mm high | m | 140 rbl |
Installation of a curved skirting board made from a pattern | m | 490 rbl |
Installation of skirting boards with a height of 70 mm | m | 210 rbl |
Curb styling | m | 385 rbl |
Floor milling, straight | m | 445 rbl |
Curved floor milling | m | 700 rbl |
Laying rosette Ø | 1m2 | 2 450 rubles |
Comprehensive floor maintenance using a single disc machine (maintenance) | 1m2 | 175 rbl |
Complex maintenance of varnished floors | 1m2 | 105 rbl |
Lifting materials without an elevator, sq.m / floor | 35 rbl | |
Lifting materials without an elevator (plywood), sq.m / floor | RUB 60 | |
Transport during the work period (5% of estimated cost, but not less than 2000 rubles.) | 1 400 rub | |
Design and estimate works | 700 rbl | |
Departure of the technologist to the object for measurements and consultation | 350 rbl |
Door installation cost
Installation of a single leaf door | PC | from 1 200 rubles |
Installation of a double-leaf door | PC | from 1 750 rub |
Dismantling the door block (for 1 piece) without saving | PC | 140 rbl |
Setting the threshold | PC | 105 rbl |
Installation of add-ons | m. | from 140 rubles |
Installing the seal | m. | 20 rbl |
Castle insert | m2 | 210 rbl |
Installing door openers | 1m2 | 105 rbl |
Peephole insert | PC | 175 rbl |
Replacing the door leaf | PC | 700 rbl |
Installing a door closer | PC | 280 rbl |
Installation of door hinges | PC | 140 rbl |
Removing the lock, handle | PC | 35 rbl |
Latch handle insert | PC | 210 rbl |
Dismantling the platband | PC | 140 rbl |
Painting doors from two sides | PC | 560 rbl |
Covering the platband with varnish | r.m. | 35 rbl |
Installation of a plastic door (like "accordion") | PC | from 700 rubles |
Installation of a sliding door - 1 leaf | PC | 1750 rbl |
Installation of a sliding door - 2 leaves | PC | 3100 rbl |
Dismantling the door block (for 1 piece) double leaf | PC | 210 rbl |
Arch installation | PC | from 800 rubles |
Electrical work: installation work
Installation of wires up to 2.5 sq. Mm. open | m. | 40 rbl |
Installation of wire from 3 to 6 sq. Mm. open | m. | 45 rbl |
5x6 wire assembly open | m. | 45 rbl |
Installation of the wire in the corrugation is open | PC | 80 rbl |
Installation of a wire in a cable duct | PC | 70 rbl |
Strobing under a wire in a brick | PC | 115 rbl |
Slitting for wire in plaster, foam block | r.m. | 105 rbl |
Slitting for wire in concrete | r.m. | 175 rbl |
Installation of electrical outlets (sockets, switches) overhead | PC | 140 rbl |
Making holes for concrete flush mounts | PC | 105 rbl |
Making holes for socket boxes on brick, plaster | PC | 70 rbl |
Installation of the socket | PC | 35 rbl |
Installation of electrical outlets (sockets, switches) internal | PC | 140 rbl |
Making holes for distribution boxes for brick, plaster | PC | 140 rbl |
Making holes for concrete junction boxes | PC | 175 rbl |
Junction box assembly open | PC | 35 rbl |
Mounting the distribution box in the hole | PC | 70 rbl |
Disconnecting junction boxes | PC | 245 rbl |
Installation of an indoor switchboard in brick | r.m. | 1400 rbl |
Installation of machines | r.m. | 280 rbl |
DIN rail mounting | PC. | 35 rbl |
Installation of a socket for an electric stove with connection | PC. | 210 rbl |
Meter installation | r.m. | 1050 rbl |
Installation of a spotlight | r.m. | 175 rbl |
Installation of "Armstrong" type luminaire | r.m. | 175 rbl |
Chandelier installation with connection | r.m. | from 490 rubles |
Installation of a step-down transformer, stabilizer | PC | 140 rbl |
Fan assembly | PC | 350 rbl |
Ceiling fan assembly with chandelier | PC | 1050 rbl |
Underfloor heating installation (cable) | m2 | 700 rbl |
Underfloor heating installation (minima) | m2 | 700 rbl |
Installation of the thermostat | PC | 280 rbl |
Installation of RCD | PC | 280 rbl |
Installation of the intercom tube | PC | 350 rbl |
Replacing the machine | PC | 250 rbl |
Installing a TV splitter | PC | 140 rbl |
Installing an additional telephone point | PC | 140 rbl |
Plumbing: Installation work
Bath installation | PC. | from 1400 |
Installing a bathtub with hydromassage | PC. | from 1400 |
Installation of a shower cabin | PC. | from 3850 |
Installing a shower enclosure | PC. | from 1400 |
Toilet installation | PC. | from 1050 |
Sink installation | PC. | from 800 |
Installing the curtain on the shower tray | PC. | from 1400 |
Cut-out of technical holes in the cabinet | PC. | 150 |
Installing a heated towel rail | PC. | 1900 |
Installation of a storage type water heater | PC. | 2150 |
Installation of a flow type water heater | PC. | 2100 |
Installation of a bidet, urine | PC. | 1050 |
Mixer installation | PC. | 650 |
Connecting an additional mixer | PC. | from 210 |
Installation of cold water, hot water pipes | m. | 280 |
Production of shroba for cold water and hot water pipes in reinforced concrete | m. | 120 |
Manufacturing of shroba for cold water, hot water pipes in bricks, foam blocks, gypsum | m. | 105 |
Installation of sewer pipes | m. | from 350 |
Production of shroba for sewer pipes 50 mm in reinforced concrete | m. | 175 |
Making a groove for sewer pipes 100 mm | m. | 245 |
Making a groove for sewer pipes 50 mm in brick, foam blocks, gypsum | m. | 105 |
Manufacturing of a groove for 100mm sewer pipes in brick, foam blocks, gypsum | m. | 115 |
Installation of a cold water supply, hot water supply | m. | 350 |
Installation of a sewer riser | m. | from 435 |
Installation of a ball valve | PC. | 280 |
Installation of a heating radiator (using welding) | PC. | from 2450 |
Heating radiator installation (without welding) | PC. | 2100 |
Installation of coarse water filters | PC. | 400 |
Installation of fine water filters | PC. | 420 |
Installation of cold water and hot water meters | PC. | 700 |
Pipe insulation device | m. | 105 |
Installing a siphon | PC. | 350 |
Installing a dishwasher, washing machine | PC. | 560 |
Shower column installation | PC. | from 560 |
Pressure reducer assembly | PC | 280 |
Manometer installation | PC | 280 |
Installing a thermostat on heating radiators | PC | 245 |
Drinking water filter installation | PC | 350 |
Collector installation | PC | 630 |
Mounting the plug | PC | 105 |
Installation of a plumbing cabinet | PC | 1050 |
Installation of a plumbing hatch (metal) | PC. | from 175 |
Pipe painting | m. | 150 |
Miscellaneous: installation work
Ventilation grill assembly | PC | 430 rbl |
Bath screen mounting (standard) | PC | 435 rbl |
Sectional batteries coloring | PC | 210 rbl |
Convector battery painting | PC | 525 rbl |
Sealing holes after laying communications | PC | 140 rbl |
Ventilation corrugation installation | r.m. | 350 rbl |
Removal, skidding of furniture (within the apartment) | person hour | 350 rbl |
Hanging a mirror, cabinet | PC | 525 rbl |
Heated towel rail painting | PC | 350 rbl |
Installation of the hatch | PC | 280 rbl |
Installing curtains | PC | 470 rbl |
Installation of the heating radiator screen | PC | 140 rbl |
Installation of blinds | PC | 490 rbl |
Installation of a ceiling curtain rod | PC | 490 rbl |
Installation of fittings in the bathroom | PC | 280 rbl |
Loading, delivery of material (including the cost of the GAZelle) | hour | 1050 rbl |
Unloading and lifting materials by elevator | kg | 1,5 |
Garbage removal (including the cost of the GAZelle) | PC. | 2800 rbl |
Garbage removal (with lift) bag | bag | 40 rbl |
Garbage removal (no lift per floor) bag | bag | 20 rbl |
Floor: demolition work
Dismantling the wooden floor | 1m2 | 105 rbl |
Dismantling of chipboard floors | 1m2 | 70 rbl |
Disassembling the laminate | 1m2 | 50 rbl |
Removing parquet | 1m2 | 105 rbl |
Removing the parquet board | 1m2 | 70 rbl |
Dismantling fiberboard from the floor | 1m2 | 45 rbl |
Dismantling linoleum (not glue) | 1m2 | 20 rbl |
Dismantling carpet (not glued) | 1m2 | 20 rbl |
Dismantling of linoleum, carpet on glue | 1m2 | from 70 rubles |
Dismantling of granite floor slabs | 1m2 | 105 rbl |
Dismantling of quartz vinyl, PVC tiles | 1m2 | 70 rbl |
Removing tiles from the floor (ceramic) | 1m2 | 105 rbl |
Dismantling of cement screed up to 5cm | 1m2 | 175 rbl |
Dismantling of cement screed up to 8cm | 1m2 | 245 rbl |
Dismantling the cement plinth | r.m. | 40 rbl |
Dismantling the concrete skirting board | r.m. | 105 rbl |
Dismantling the ceramic skirting board | m. | 35 rbl |
Dismantling the floor plinth | r.m. | 20 rbl |
Dismantling the floor skirting board while maintaining | r.m. | 105 rbl |
Dismantling the nut | PC. | 50 rbl |
Removal of plywood, hardboard | m. | 105 rbl |
Dismantling of heat and noise insulation | 1m2 | 35 rbl |
Walls: Demolition work
Removing plaster from the walls | m2 | from 70 |
Removing tiles from walls | m2 | from 105 |
Cleaning walls from water-based paint | m2 | from 105 |
Clearing tile seams | m2 | from 70 |
Dismantling of PVC, MDF panels from walls | m2 | 70 |
Dismantling of false walls made of gypsum plasterboard, PVC on a metal frame | m2 | 105 |
Dismantling of a box made of gypsum plasterboard, PVC, chipboard. | r.m. | 120 |
Cleaning walls from putty or whitewash | m2 | from 105 |
Dismantling of slopes from gypsum board, PVC | r.m. | 70 |
Removing plaster from slopes | r.m. | from 105 |
Dismantling walls (1/2 brick) | m2 | 175 |
Dismantling of walls (in brick) | m2 | 245 |
Dismantling of concrete partitions up to 12cm thick | m2 | from 700 |
Dismantling the partition (gypsum, plaster) | m2 | 140 |
Dismantling the partition (GKL) | m2 | 140 |
Dismantling the partition (wood) | m2 | 420 |
Dismantling of a partition in a dignity. node (reinforced concrete up to 5 cm.) | m2 | 700 |
Dismantling the ceiling in the bathroom (reinforced concrete up to 5 cm.) | m2 | 700 |
Punching an opening in the wall (brick) | m2 | from 1400 |
Punching a hole in the wall (1/2 brick) | m2 | from 700 |
Punching a hole in the wall (concrete) | m2 | 2100 |
Wall opening devices (plaster, plaster) | m2 | 700 |
Removing the glued-in mirror | m2 | 70 |
Dismantling of metal structures | m2 | negotiable |
Ceiling: Dismantling work
Clearing wallpaper from the ceiling | m2 | 140 |
Cleaning the ceiling from paint | m2 | 175 |
Cleaning the ceiling from whitewashing | m2 | 143 |
Dismantling the slatted ceiling | m2 | 70 |
Breakdown of the ceiling rustic | r.m. | 105 |
Dismantling the ceiling skirting board | r.m. | 45 |
Disassembly of PVC, MDF panels from the ceiling | m2 | 105 |
Dismantling the Armstrong ceiling | m2 | 85 |
Dismantling of window sills | 1 unit | 350 rbl |
Installation of window sills | 1 unit | 800 rbl |
Dismantling the ceiling from gypsum plasterboard 1 level | m2 | 175 |
Dismantling the ceiling from gypsum plasterboard 2 level | m2 | 210 |
Dismantling the ceiling from gypsum plasterboard 3 level | m2 | 245 |
Cleaning the ceiling from adhesive mastic | m2 | 105 |
Removing plaster from the ceiling | m2 | 105 |
Plumbing: Dismantling work
Dismantling the toilet | PC. | 280 |
Dismantling the heated towel rail | PC. | 420 |
Dismantling the bathtub | PC. | 560 |
Dismantling the jacuzzi | PC. | 1050 |
Dismantling the shower stall | PC. | 800 |
Dismantling of cold water, hot water supply pipes | r.m. | 140 |
Dismantling of sewer pipes | r.m. | 175 |
Dismantling of a cold water supply, hot water supply p.propylene | r.m. | 245 |
Dismantling of cold water riser, hot water supply metal | r.m. | 210 |
Dismantling the plastic sewer riser | r.m. | 315 |
Dismantling of a cast-iron sewer riser | r.m. | 385 |
Dismantling cold water, hot water meters | PC. | 140 |
Dismantling a new type of heating radiator | PC. | 245 |
Dismantling a flow type water heater | PC. | 210 |
Dismantling a storage type water heater | PC. | 350 |
Dismantling the sink | PC. | 245 |
Dismantling the mixer | PC. | 70 |
Dismantling the valve | PC. | 140 |
Dismantling the washing machine, dishwasher | PC. | 280 |
Removing coarse filters | PC. | 70 |
Dismantling the sewer tee | PC. | from 350 |
Dismantling the pipe insulation | r.m. | 20 |
Dismantling the shower rack | PC. | 140 |
Dismantling the plumbing cabinet | PC. | 140 |
Dismantling the siphon | PC. | 70 |
Dismantling the toilet cistern | PC. | 140 |
Electrical work: dismantling work
Dismantling of electronic points (mechanisms) | PC | 35 rbl |
Dismantling of e-points (completely) | PC | 45 rbl |
Removing the luminaire | PC | 70 rbl |
Dismantling the old open wiring | PC | 20 rbl |
Dismantling the old closed wiring | PC | 35 rbl |
Dismantling the machine | PC | 140 rbl |
Removing the intercom tube | PC | 105 rbl |
Removing the fan | PC | 140 rbl |
Dismantling the chandelier | PC | 140 rbl |
Dismantling the junction box | PC | 70 rbl |
Dismantling the cable channel | r.m. | 20 rbl |
Miscellaneous: demolition work
Removing the ventilation grill | PC | 70 rbl |
Drilling a through hole d = up to 20mm. | PC | 295 rbl |
Dismantling the ventilation corrugation | r.m. | 70 rbl |
Cleaning pipes from paint | r.m. | 280 rbl |
Cleaning a heated towel rail from paint | PC | 350 rbl |
Cleaning metal batteries from paint | PC | 420 rbl |
Cleaning sectional batteries from paint | section | 175 rbl |
Dismantling the hatch | PC | 70 rbl |
Removal of wooden built-in wardrobes, mezzanines, etc. | PC | 490 rbl |
Removing the heating radiator screen | PC | 105 rbl |
Dismantling the curtain | PC | 105 rbl |
The popularity of townhouses in recent years is simply enormous, which made the question of their renovation urgent. The classic version of the offer of housing in a townhouse, if we talk about primary market: with a rough finish (floor without screed, walls without plaster, installed communications). It accounts for approximately 80% of all offers on the market. Semi-detached houses with a fine finish (half-screed, plastered walls, communications around the house) account for 15%. And only 5% - housing with a turnkey fit-out.
Not every buyer can make the premises fit for housing on their own. There are many reasons for this:
- A large amount of work (the average area of townhouses is 100-130 m 2);
- The technical complexity of the work is due to the following:
- unlike an apartment, in multi-storey building, in a townhouse, it is often necessary to carry out the wiring of engineering networks;
- modern structures, for example, partitions and frame walls, require special qualifications;
- intricate ideas of consumers in terms of design, which cannot be realized on their own.
So, the two most convenient options for renovating a townhouse: repair from the developer and repair by a specialized company.
How much does it cost to renovate a townhouse from a developer?
Usually the developer pays all attention to the sale and construction part. The department that carries out the finishing is either outsourced or in oblivion. Therefore, it is not necessary that the beauty that you found in the showroom will be accurately reproduced in your apartment. Moreover, the "salesmen" are responsible for the showroom, and not the refiners.
Usually, repairs from the developer are typical, neutral, in a modern spirit. That is, decorating a renovated room in the Art Nouveau, loft or Art Deco style, in the spirit of country or Baroque, is unlikely to work. An expressive setting can conflict with its invisible texture and calm finishing colors.
True, for such a renovation, you can choose an original design in the style of high-tech, fusion, provence, classic. As a rule, finished townhouses are in the economy segment. As a result, the availability of finishing increases their cost by 20% (or even more).
A ready-to-live townhouse from a developer in the business segment can be called a rarity. If this can happen, then, most likely, the developer will offer something original, for example, an original design in the format of the village. However, the cost in this case is calculated according to the individual estimate.
How much does it cost to renovate a townhouse from a construction company?
Its cost directly depends on the complexity of the task and the degree of construction readiness of the townhouse. There are several options for renovating townhouses to choose from (calculated for 1 m 2 of floor space):
- cosmetic (painting floors and then covering them with linoleum or laminate, wallpapering, installing electrical outlets) - from 2,000 rubles per 1 m 2 (with rough building materials from 3,000 rubles per 1 m 2);
- overhaul (installation of door frames, dismantling of old finishes, installation of new sockets and channeling, installation of switches; leveling the ceiling and walls without a level, by eye; installation of plumbing) - 5,000 rubles per 1 m 2 (8,000 per 1 m 2 - with rough materials );
- complex economy (screed and flooring of linoleum or some other coating; putty of the ceiling and walls; installation of a false ceiling; installation of door blocks; replacement of sockets; installation of plumbing) - 3000 rubles per 1 m 2 (5000 rubles - with rough materials);
- complex European standard (redevelopment and dismantling of old finishes; walls with decorative elements; improvement of storage rooms and loggias; arches, leveling of ceilings and walls in a plane; installation of suspended ceilings of any complexity; installation of plumbing and utility networks; floor screed and installation of the "warm floor" system with further finishing) - 7,000 rubles per 1 m 2 (from 12,000 rubles per 1 m 2 - with rough materials);
- luxury class renovation, which implies the work of a designer, the creation of an individual air conditioning and ventilation system, installation supervision during the installation of equipment - it is impossible to name the cost for it even approximately, since everything here directly depends on the income and tastes of the townhouse owner.
All options listed above do not include materials such as tiles, wallpaper, flooring, etc. Their prices are always calculated separately. But garbage collection, delivery of building materials is included in the cost of repair finishing works.
Considering the condition of the rough-finished townhouses (there is no internal partitions, no screed on the floors, no wiring of engineering networks), for them the most suitable repair is a complex European standard and an integrated economy.
How much does it turn out in practice?
The owners of townhouses, communicating on the forums, share their experience: who spent how much on a building bought "in rough finish" in order to make it a residential building. These are different numbers. How much does the cost of cladding depend on decency? construction company and the owner's appetite, can be seen in the examples we have given of already completed renovations of apartments in semi-detached houses:
- townhouse 230 m 2: 1.3 million rubles was spent on finishing the economy class, which was carried out by a construction team from the provinces, not counting building materials and 400,000 rubles for the installation and decoration of two monolithic staircases with wood;
Having gained experience, the owners of townhouses recommend using the services of trusted construction companies, but ordering not a turnkey repair, but a phased one. So it is much easier to control the cost of materials, work, check the quality. On the other hand, you will have to accept the work in stages, but it is better to order them in one company so that unscrupulous builders cannot shift their blame onto another.
In order for there to be no surprise during the renovation, such as the doubled price of finishing work, start with a competent design project. It will serve as the basis for the estimate.
So, a ready-made repair from a developer company will cost less, but at the same time it will be typical, namely, an economy option. If you dream that the look of your home would be individual, contact construction company... At the same time, carefully control all costs and the process itself. Otherwise, the price announced by the company may more than double.
Are you the owner of a new-fashioned townhouse and want to make such renovations in it that would correspond to the architecture of this house and at the same time would be comfortable, convenient for life and have a unique design? The company "RedRem" is ready to carry out a turnkey townhouse renovation.
Renovation of apartments in townhouses is not an easy task, since houses of this type have a vertical type of arrangement of rooms. This means that the house will have a rather complex system for laying communications, and there will also be a staircase that needs to be made as safe and aesthetic as possible. The specialists of the company "RedRem" have sufficient experience and all necessary tools in the arsenal in order to make the repair of turnkey townhouses with high quality and reliability.
When ordering a townhouse renovation service with materials, each client receives gifts from the company.
The first is a design project. The interior design is the most important stage in the renovation. It allows you to plan renovations and finishes down to the smallest detail. Design, planning and zoning are worked out based on your requirements and wishes. On the basis of the project, schemes for laying communications will be developed, as well as a detailed estimate with prices for materials and work will be drawn up.
The second gift is insurance for your townhouse at Sberbank. The insurance period is 1 year, the nominal value of the certificate is 2 million rubles.
Third, we will organize a complete cleaning of your home after renovation with the help of a professional cleaning company.
The renovation of the townhouse will be carried out by specialists of a narrow profile. A team of at least 10 people. Each specialist is responsible for his own area of work. That is why all work from rough finishing to decor will be carried out with a guarantee of the highest quality. The head of the facility will monitor the progress of the work, who, if necessary, will answer your questions and provide a photo report at the end of each week.
Renovation of townhouses from "RedRem" is a high-quality finish and exclusive project... Upon completion of the work, you will receive an ideal home for life that meets all modern standards of beauty and safety.
For all work within the framework of any service we provide a guarantee (from 12 months) and service maintenance of all installed engineering networks. Do you value quality and reasonable cost? Then do right choice, leave a request for free measurement and a preliminary estimate of the estimate on our website. In 5 minutes our specialist will discuss the terms of cooperation with you.
Before calculating the cost of finishing a townhouse, you should remember about its features and differences from repairs in standard apartments in multi-storey buildings.
Townhouses are larger than apartments. Does this mean that the cost of repairs will become "prohibitive"? Indeed, when recalculating prices per square meter, the amount sometimes turns out to be significant, however, large discounts are provided to customers of wholesale construction services, which may well include the owners of townhouses. Thus, the owners of the premises of the new standard will benefit.
The main items of the estimate for the renovation of a townhouse
A townhouse as a renovation object differs from an apartment in a multi-storey building not only in area. In particular, in such housing there are elements and structures that are not found in apartments:
- attic;
- staircase structures leading to the upper floor;
- non-residential premises with special requirements(boiler room, pumping room);
- glazed and open verandas, etc.
Thus, the list renovation works the estimate will include the following main items:
- redevelopment of space;
- replacement or change of configuration, installation of utilities;
- installation of new or finishing of existing stairs;
- finishing of living rooms and non-residential premises.
At the same time, a townhouse differs from a private household, first of all, by the presence of common walls with neighbors, so soundproofing of this wall may be required for maximum comfort.
Design project and decoding of positions
For a competent renovation of a townhouse, a design project is needed. Its presence gives a number of advantages:
- Correct selection of color and interior solutions and their coordination with the Customer. Visualization allows you to see how the premises will look after renovation, without trying to understand everything in words.
- All design ideas are developed with reference to the technical part (technology, necessary materials).
- Accurate calculation allows you to avoid waste of materials and the need to look for missing tiles, laminate, etc., identical in color and texture.
- The choice of the location of light sources and built-in household appliances is accompanied by the development of a circuit electrical network... Work with other types of utilities (hot and cold water pipelines, water supply and sewerage systems for bathrooms, shower cabins, bidets, toilet bowls, washing machines and dishwashers) is structured in a similar way.
After the development of the design of the project, the list of works and their volume is more accurately determined:
- dismantling of partitions, walls and other structures;
- floor screed, "warm floor" installation;
- laying floor coverings;
- wall decoration (puttying, plastering, painting, applying liquid wallpaper or Venetian plaster, installing panels, tiling, etc.);
- electrical work (chipping of walls, installation of a supply and grounding cable, installation of built-in or suspended light sources on ceilings and walls, installation of switches and sockets);
- installation of stationary, sliding or folding partitions, door blocks);
- plumbing work (installation of plumbing, installation of communications, installation of masking pipes for cabinets and boxes with built-in revision hatches).
Our company produces repair of turnkey townhouses in Moscow and Moscow region, we provide a full range of renovation work from rough finishing to finishing finishing.
About renovation in townhouses
A townhouse is a housing that combines the comfort of a city apartment and the isolation of a country house. In one building there are several apartments, each of which has an individual entrance from the street. In practice, it is a row of houses connected to each other. As a result, all neighboring apartments have common walls with each other.
The massive construction of townhouses in our country has been going on for a little over ten years. Every year more and more families acquire this type of real estate, due to the lower cost than a cottage. The price reduction is achieved due to the compactness of the building: one apartment occupies much less land plot than a free-standing building.
The cost of supplying communications is divided by the number of semi-detached houses. The cost of construction is reduced due to less material consumption. The presence of a private plot makes the townhouse even more attractive for adherents of individual housing. The owner is also provided with a garage or parking space for a car. The arrangement and renovation of a townhouse must be entrusted to professional builders.
Types of townhouses
The rapid development of construction has led to the fact that developers began to offer different types of townhouses for different tastes and wallets. Let's consider their main varieties.Lanehouse |
In fact, a complex of separate houses, united by common walls. The number of houses can theoretically be infinite, but in practice it is 6-10 blocks. A feature of the lanehouse and its big plus is that each block has a completely autonomous communications system that is not connected with neighboring houses. If an emergency occurs in one of the houses, then the residents of the neighboring ones do not suffer from this in any way. Block houses are characterized by a fairly large area and the presence of a plot. This type of development is one of the most popular in European suburbs. |
Duplex |
The classic version of a townhouse, as the name implies, is a two-family house. Communications are usually common, as are the site, which is sometimes divided by a fence. Very handy for large families or close friends. |
Quad house |
House for four owners. The project is compact, small in size and therefore very popular with developers. Buyers are attracted by the low price. Suitable for people who want to have, albeit a small, but their own piece of land and at the same time are not afraid of a large number of neighbors. |
Villette |
The type of housing is considered premium. It differs from other types of townhouses in the large areas of residential premises and the size of the plots. Projects of such houses provide for the presence of terraces or attics. It is possible to have a full-fledged insulated garage and sauna. The size land plots allows you to carry out landscaping, arrange recreation areas or even a pool. |
One of the activities of our company is. During our work in this market, we thoroughly studied the features of these buildings. Our company makes the life of a family in the house really isolated, comfortable, despite the presence of neighbors behind the wall.
A townhouse is not a city apartment, but multi-level housing. Usually two or three floors are designed here. To assess the scope of work, you need an experienced specialist who is provided by our company. Measurement, assessment of structures, the possibility of planning solutions - the first thing to do before starting to create a design project.
The first stage of a townhouse renovation - development of a design project
The total area of one apartment in a townhouse varies from 100 sq.m to 250 sq.m. Traditionally, the first floor is allocated for the living room, kitchen and dining room, space for technical and utility rooms is planned. The second and third floors are occupied by bedrooms for family members and guests, an office, and other necessary rooms. Bathrooms are located on each floor.
Competently arranging a rather large space is possible only if there is a design project. This is not just a sketch, a beautiful picture, but a whole package of documents that includes the most important stages of repair:
- wiring diagram and placement of sockets, switches, lighting devices;
- plan for laying engineering communications around the apartment;
- location of heating equipment: batteries and underfloor heating;
- partition plan and explication of doorways;
- zoning of living rooms;
- placement of plumbing equipment in the kitchen, bathroom and toilet;
- schemes for the device of such structural elements as arches, niches, columns are being developed,
- decorative partitions;
- a necessary element of a townhouse is a staircase, the design of which must be developed; attached statement of finishing the premises.
The designer of our company is creative in transforming each object. He will definitely discuss with the owner his vision of housing, give professional recommendations. Will create an inexpensive one that will fully meet the preferences of the owners, their lifestyle. An apartment in a townhouse will surely become a combination of functionality, style and comfort, if our specialist gets down to business.
Townhouse communications
Townhouse renovation differs from the arrangement of operated houses. First of all, this concerns equipping with the necessary pipelines. The apartment will not function without the laying of utilities. The townhouse is equipped with everything necessary for the everyday life of a modern person:
- plumbing and drainage system;
- heating;
- ventilation;
- power supply;
- wires are supplied to connect the Internet.
Usually all engineering communications have already been laid to the house. It is important to distribute them around the apartment competently, so that each system functions smoothly, trouble-free, and regularly performs all the tasks assigned to it.
There is no standard project for equipping a townhouse with life support systems. Despite the same area of apartments located in the same block of houses, each owner strives to make a layout and arrange housing in accordance with his needs and tastes. Cooperation with our company guarantees excellent results. The company employs highly qualified electricians and plumbers with considerable experience in their specialty. They thoroughly know their business, carry out all communications in accordance with the current building codes and fire safety rules.
It is quite difficult for an ignorant person to understand the intricacies of the heating system. And in our latitudes half of the year is cold, and warmth in the house is an important component of a normal human existence. The company's specialists preliminarily assess the type of heating system that the developer has made. Needless to say, heating radiators and piping are in no way compatible with the future layout and interior of the townhouse. System capacity is usually barely enough for a minimum heat supply.
Our company will calculate the real need for heating all rooms in the house. The material of the pipes, the model of the radiators is selected not only taking into account reliable and modern materials, but also in accordance with the upcoming home improvement, its interior. By agreement with the owner of the house, a choice is made between gas and electric heating. It is convenient to equip some premises with a warm floor system. Installation and connection of equipment is coordinated with power supply organizations.
Plumbing and sewerage in townhouses is usually centralized. It is important here to correctly carry out the wiring inside the apartment. A multi-storey house must be equally well supplied with water at all levels. Calculations in this case are also indispensable. An important point when installation of communications in townhouse is the installation of water and gas meters. They are installed in places to which free access is provided. Installation of water purification filters is also a necessary measure for people who care about the health of their families.
Electrical wiring in a townhouse
The electrical wiring is installed in the townhouse in accordance with the completed project. It is important to take into account the power consumption, select wires of sufficient cross-section. The current need of the owners for sockets is also being established. Now every family has a lot household appliances, electronics, video and audio equipment.
After the work of our specialists, there will be no need to use extension cords, each piece of household appliances is equipped with its own socket. The lighting system is also carefully planned. Each room is supplied with a main lamp, work and additional light sources. We are aware of all new products on this market. Each townhouse will be equipped with both modern and traditional lighting fixtures.
Ventilation in a townhouse is given an important place. The townhouse is equipped with several bathrooms, boiler room, kitchen. Each of these rooms must be supplied with air exchange systems. Individually for each owner, we will select a ventilation model that will exclude the appearance of mold and mildew in wet rooms. Odors from the kitchen space will be removed quickly, as well as excess water vapor.
Rough finishing work in a townhouse
Turnkey townhouse renovation includes roughing and finishing work. In order to flawlessly translate the design project into reality, all surfaces are first prepared. The walls must be aligned. Only high-class plasterers-painters carry out the rough finishing in our company. The result is achieved using plaster or plasterboard wall cladding. The surfaces are brought to perfect smoothness with putty mixtures. For good adhesion to finishing materials, a primer is applied over the putty.
An important aspect at this stage of the renovation is the device of high-quality sound insulation in order to achieve a truly isolated life from the neighbors behind the wall. We will select the right materials for effective noise isolation, and we will carry out the installation correctly. The ceilings in the house are prepared for finishing in different ways: depending on the type of finish. The surfaces to be painted are carefully leveled. A frame is installed for suspended ceilings. Under the hinged structures, the joints between the walls and floor slabs are carefully sealed, the surface of which is primed.
The floors are also being prepared for final finishing. Here, it is taken into account how they will be arranged: along the logs or along the reinforced concrete floor slab. What material is chosen as the floor covering also matters.
Rough renovation of a townhouse- this is the base on which the finishing materials will lie. Particular attention is paid to the indispensable attribute of townhouses, the staircase connecting the floors. From under the hands of our craftsmen comes an elegant design that fits perfectly into the space of the house. In addition to aesthetic appeal, we pay attention to the convenience of walking on it.
Finishing the townhouse
The final look of the inner arrangement of the townhouse will appear on display after the finishing works, which will complete the renovation of the townhouse on a turnkey basis. The design project here acts as a guide, according to which our masters are operatively working. Almost every object abounds different kinds finishing materials... In one apartment of a townhouse, the most different types finishes and material combinations:
- painting walls;
- wallpapering;
- decorative plaster;
- finishing with wall panels made of wood, artificial or natural stone;
- the use of tiles for flooring and wall decoration;
- flooring is chosen from democratic linoleum to parquet flooring from elite wood species.
Each type of finish requires a thorough knowledge of the technology of the device. The owner of the cottage does not need to delve into all the subtleties of the work. Highly qualified specialists of our company will perform any type of finishing in accordance with modern technologies.
All premises of the townhouse are equipped according to their functional purpose. We are equally good at performing work related to the use of traditional materials, with the use of luxury products or made on the basis of natural raw materials.
The workers of our company remove and remove all construction waste that is formed during the repair work. The customer receives an apartment fully prepared for a comfortable stay. We carry out repairs and turnkey finishing in townhouses throughout Moscow and the Moscow region... Prices are fixed in the contract, they are calculated in each case individually, based on the estimate. The cost of work depends on a large number factors. Here are just the main ones:
- renovation is being carried out in a new building or an existing house;
- area and number of storeys of the building;
- used finishing materials;
- the presence of complex or non-standard elements in the design.
The customer significantly saves when working with the company, if he entrusts the purchase of building materials to our employees. Constant interaction with sellers gives us the opportunity to purchase the necessary products and materials at wholesale prices.
By concluding a contract with our company, the client can be sure that the terms and schedule of the repair are met. The quality of work is reinforced warranty obligations by the firm. We provide post-warranty service on all objects that we repair. Contact us by phone, leave a request on the website, and a measurer will come to your address, who will determine the dimensions of the object, find out the needs and what you want the time of the renovation of the townhouse.
Townhouse renovation prices
Our company carries out a democratic approach to finishing townhouses and the cost of repairs with us usually ranges from 5900 rubles to 12000 rubles per square meter by floor and includes all turnkey works.
You can order 3 types of finishing of a townhouse from us:
type of finishing |
description of work and cost |
Economy renovation |
Economical townhouse renovation is carried out in as soon as possible using inexpensive finishing materials. Walls are finished with wallpaper or liquid wallpaper, ceilings are more often used stretch or for painting, an uncomplicated and simple project of power supply and water supply, it is impossible to save on heating, therefore these works are the most expensive part. All the simplest jobs needed to live in a new townhouse. Cost - 5900 r. per square meter Benefits - savings on materials and labor |
Standard renovation |
The standard type of finishing is a set of more advanced services. The design project is carried out in the form of a complete building modeling, including such types of work as walls for painting, or decorative plaster, decorative paints, laying of artificial stone. The ceilings can be made multi-level using tension members. Engineering Communication carry many more useful functions, such as a warm water floor system, an extended electrical project. Cost - 7000 r. per square meter Benefits - optimal set of services |
Elite renovation |
This type of repair is carried out under the strict supervision of the designer and his direct supervision, using expensive building materials, natural marble or stone, the possibility of installing a smart home system. Cost - 12000 r. per square meter Benefits - chic renovation surprise your friends and neighbors |
The cost of materials for renovating a townhouse
The price of rough building materials for economical and standard repairs is about 3,000 rubles per square meter on the floor, with an elite one this price can go up to 5,000 rubles.
Rough construction materials are;
- Sand concrete for screed floors and masonry brick walls
- Plaster for leveling walls and ceilings and other works
- Fillers for the final leveling of walls and ceilings
- Electric wires, circuit breakers and other electrical appliances
- Tile adhesive for laying tiles
- A set of materials for wiring plumbing pipes, collectors, etc.
- Painter's set of sealants, paints, primers, spatulas, brushes, etc.
It is difficult to calculate the cost of finishing materials individually, since the client himself decides what materials and for what price to purchase.
Why is it more expensive to renovate a townhouse than an apartment?
The townhouse has a number of works that are not performed in the apartments:
- Ladder construction (we will offer various options for stairs)
- More complex electrical project
- Water supply system (more complex, as it is often necessary to provide water supply to three floors)
- Heating device (sometimes you need to build the entire heating system, the choice of an electric boiler or gas)
Examples of townhouse renovation works
Renovation of a townhouse on Rublevskoe highway
Area of the object - 323 m2 Terms of work - 7 months Price of work and materials - 1 900 000 Repair details |
Renovation of the townhouse Barvikha
Area of the object - 210 m2 Terms of work - 8 months Price of work and materials - 1 600 000 Repair details |
Renovation of a townhouse in Uzarov
Area of the object - 401 m2 Terms of work - 7 months Price of work and materials - 1 700 000 Repair details |
Renovation of a townhouse on Rublevo Uspenskoe highway
Area of the object - 205 m2 Terms of work - 7 months Price of work and materials - 1 300 000 Repair details |